Brace math
Enter panel height, width, thickness, openings, exposure, duration, brace capacity, and anchor type. The engine solves weight, centroid, wind pressure, spacing, and pull.
Brace count, insert height, controlling deadman pull, and a release-gate checklist for tilt-up panel crews.
BracePass DC works offline on Android with no account, no ads, no analytics, and no Android Internet permission in release builds. Export a Brace Card PDF, CSV, or ZIP when the job needs a record.
Field aid only. Verify odd panels with the project engineer and follow OSHA, the site erection plan, and competent-person direction before releasing the crane or removing any brace.
Enter panel height, width, thickness, openings, exposure, duration, brace capacity, and anchor type. The engine solves weight, centroid, wind pressure, spacing, and pull.
The checklist stays red until braces, knee braces, plumb, and brace-angle field checks are complete. Short-duration cases require engineer review confirmation.
Save panels, review the drawn elevation, and export a watermarked free preview or Pro PDF, CSV, ZIP, and building ledger through Android share actions.
No accounts, no ads, no analytics, no backend, no cloud sync, no remote AI, and no Android Internet permission in release builds. Google Play Billing and user-directed share targets may use their own network access.