# BracePass DC BracePass DC is an offline Android field aid from Anvilfield for tilt-up panel brace sizing and release checklist records. It calculates panel weight, centroid, duration-adjusted wind pressure, brace count, insert height, brace spacing, and controlling deadman or helical anchorage demand from user-entered panel and site conditions. It is not a stamped engineering bracing plan, not the crane-release authority, and not the brace-removal authority. Project teams must verify the result with the project engineer when required and follow OSHA, the site erection plan, and competent-person direction before releasing the crane or removing any brace. Privacy summary: no account, no ads, no analytics, no backend, no cloud sync, no remote AI, and no Android Internet permission in release builds. Google Play Billing and user-directed Android share targets may use their own network access.