{"dataset":"anvilfield-standards","description":"Codes and standards referenced across the guides, with the guides that apply each.","source":"https://anvilfield.com/","license":"CC BY 4.0","attribution":"Anvilfield (anvilfield.com)","count":590,"records":[{"name":"NEC","org":"National Fire Protection Association","slug":"nec","trade":"","guides":["aluminum-branch-wiring-hazards-remediation","arc-energy-reduction-methods-240-87","arc-flash-study-labels","assured-equipment-grounding-aegcp","automatic-gate-operator-installation","automatic-transfer-switch-commissioning","battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","bess-commissioning-punch-list","bms-ddc-controls-commissioning","boat-dock-marina-construction","buck-boost-transformer-voltage-adjustment","busway-busduct-installation","cable-pull-planning-tension-card","cable-reel-receiving-remainder-log","cable-tray-fill-copper-takeoff","cabling-pathways-firestop","commercial-fence-gate-installation","commercial-ice-machine-installation-service","commercial-kitchen-equipment-installation","commercial-lighting-design-footcandles-controls","conductor-ampacity-derating-nec","conductor-types-insulation-thhn-thwn-xhhw","conduit-bending-fundamentals","conduit-bodies-fittings-installation","conduit-fill-nec-chapter-9","control-panel-ul508a-sccr-build","data-center-battery-energy-storage-types","data-center-cabinet-rack-types-selection","data-center-construction-buildout-phases","data-center-generator-sizing-selection","data-center-grounding-signal-reference-grid","data-center-onsite-generation-fuel-cell-microgrid","data-center-power-density-capacity-planning","data-center-power-distribution-chain","data-center-rack-dc-power-distribution-hvdc","data-center-rack-pdu-types-power-distribution","data-center-raised-floor-vs-slab-design","data-center-white-space-gray-space-layout","datacenter-electrical-commissioning-power-qa","datacenter-fire-life-safety-overview","distribution-equipment-switchgear-switchboard-panelboard","dry-type-transformer-sizing-installation","ductless-mini-split-multi-zone-install","edge-micro-data-center-deployment","electric-sign-channel-letter-installation","electrical-cable-fault-locating-tdr","electrical-cable-tray-systems-installation","electrical-conductor-color-code-phase-identification","electrical-device-wiring-receptacles-switches","electrical-disconnect-switch-types-requirements","electrical-feeder-branch-circuit-design-sizing","electrical-generator-load-bank-testing","electrical-generator-paralleling-synchronization","electrical-grounding-system-testing-soil-resistivity","electrical-hazardous-classified-locations","electrical-load-calculation-nec","electrical-motor-nameplate-reading","electrical-motor-protection-overload-relays","electrical-one-line-diagram-reading-symbols","electrical-parallel-conductors-nec","electrical-pull-junction-box-sizing","electrical-service-entrance-metering-install","electrical-service-panel-upgrade","electrical-splices-terminations-connectors","electrical-submetering-energy-monitoring","electrical-surge-protection-spd-types-nec","electrical-troubleshooting-multimeter-testing","electrical-working-clearance-110-26","emergency-egress-lighting-inverter","emergency-power-off-epo-testing","emergency-standby-power-systems-nec-700","epms-power-monitoring-metering","equipment-grounding-conductor-sizing-egc-250-122","ev-charger-evse-installation-commissioning","ev-dc-fast-charging-station-design","ev-feeder-sizing-walkthrough","feeder-tap-rules-nec-240-21","fire-alarm-system-installation-testing","fire-pump-acceptance-test","fire-pump-standpipe-system-design","generator-acceptance-loadbank-turnover","generator-grounding-bonding-separately-derived-system","generator-paralleling-switchgear","gfci-afci-protection-nec","ground-fault-protection-equipment-gfpe","ground-resistance-bonding-testing","ground-ring-electrode-nec-250-52","grounding-electrode-system-bonding","grounding-vs-bonding-explained","harmonics-power-quality-mitigation","holiday-lighting-commercial-install","hvac-unit-heater-gas-electric","infrared-thermography-inspection","isolated-ground-receptacle-sensitive-equipment","it-equipment-rack-stack-deployment-migration","knob-and-tube-wiring-assessment-remediation","landscape-lighting-low-voltage-install","led-lighting-retrofit-upgrade","lighting-controls-dimming-0-10v-dali","low-voltage-class2-systems-cabling","modular-prefab-data-center-deployment","motor-circuit-conductor-sizing","motor-control-center-mcc-commissioning","motor-starting-methods-dol-soft-vfd","multiwire-branch-circuit-shared-neutral","mv-cable-termination-testing","nec-box-fill-sizing-calculation","nema-enclosure-ratings-types","outdoor-kitchen-construction-installation","overcurrent-protection-breakers-fuses","panelboard-installation-circuit-directory","pdu-rpp-commissioning","photovoltaic-pv-system-wiring-nec-690","pipe-freeze-protection-heat-trace","poe-voltage-drop-and-heat-quick-check","pool-spa-bonding-nec-680","portable-generator-interlock-backfeed-safety","power-capping-oversubscription-management","power-factor-correction-capacitor-bank","protective-relay-coordination-study","ptac-pthp-package-terminal-units","pv-rapid-shutdown-690-12","rack-readiness-floor-load-layout","raised-access-floor-installation","receptacle-types-nema-configurations","rooftop-solar-pv-mounting-racking","rooftop-unit-rtu-installation-startup","selective-coordination-overcurrent","short-circuit-available-fault-current-study","solar-pv-om-utility-scale-maintenance","solar-ready-pv-roof-provisions","split-system-condenser-lineset-install","standby-generator-ats-installation","stranded-capacity-power-utilization","surge-protection-spd-installation","swimming-pool-spa-mechanical-systems","temporary-power-construction-site","termination-torque-qa","thermostat-types-installation-smart-controls","transformer-types-dry-vs-liquid-filled","ufer-concrete-encased-grounding-electrode","underground-duct-bank-concrete-encased","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points","vfd-variable-frequency-drive-install","voltage-drop-field-guide","water-feature-pond-fountain-installation","wireway-auxiliary-gutter-installation","wiring-methods-raceway-conduit-types"],"url":"https://anvilfield.com/standards/nec/"},{"name":"IPC","org":"International Code Council","slug":"ipc","trade":"","guides":["air-admittance-valve-island-vent","backflow-assembly-test-procedure","backflow-failed-test-repair-checklist","backflow-preventer-assembly-types","backwater-valve-sewer-backup-protection","blue-roof-controlled-flow-drainage","commercial-ice-machine-installation-service","commercial-kitchen-equipment-installation","condensate-neutralizer-condensing-appliance","domestic-water-service-meter-tap","drain-cleaning-jetting-snaking","dwv-venting-pipe-sizing","floor-drain-trench-drain-installation","flushometer-flush-valve-types","grease-interceptor-sizing-maintenance","gutter-downspout-exterior-drainage","hydrostatic-pressure-test-plumbing","indirect-waste-floor-sink-air-gap","industrial-process-piping-systems","irrigation-winterization-blowout-spring-startup","lead-service-line-identification-replacement","low-water-pressure-diagnosis-repair","outdoor-kitchen-construction-installation","pex-copper-cpvc-piping-methods","pipe-hangers-supports-seismic-bracing","pipe-joining-methods-solder-press-solvent","plumbing-cleanout-requirements-access","plumbing-estimating-takeoff","plumbing-fixture-carriers-supports","plumbing-fixture-rough-in-setting","plumbing-fixtures-types-water-efficiency","plumbing-isometric-drawing-riser-diagram-reading","plumbing-oil-water-separator-sand-interceptor","plumbing-permit-inspection-process","plumbing-special-waste-acid-neutralization","plumbing-traps-types-trap-seal","plumbing-valve-types-selection-isolation","potable-water-disinfection-flushing-chlorination","reclaimed-water-purple-pipe-systems","roof-drainage-scupper-drain-sizing","sanitary-building-sewer-lateral-connection","sewage-lift-station-design-pumping","sewer-camera-cctv-inspection","sewer-gas-odor-diagnosis-repair","shower-pan-wet-area-waterproofing","storm-drainage-interior-piping-sizing","sump-pump-battery-backup-protection","sump-sewage-ejector-pump-sizing","thermostatic-mixing-valve-scald-legionella","trap-primer-floor-drain-protection","trenchless-sewer-repair-pipe-lining-bursting","water-distribution-system-types-upfeed-downfeed","water-hammer-arrestor-sizing","water-heater-maintenance-anode-flushing","water-heater-recirculation-sizing","water-heater-sizing-selection","water-heater-types-tank-tankless-heat-pump","water-pressure-booster-prv-system","water-supply-pipe-sizing-wsfu","water-treatment-softener-filtration","well-pump-pressure-tank-system","wet-venting-common-vent-design"],"url":"https://anvilfield.com/standards/ipc/"},{"name":"Uptime Institute","org":"Standards body","slug":"uptime-institute","trade":"","guides":["ai-cluster-commissioning-burn-in","ai-gpu-rack-power-cooling-readiness","bms-ddc-controls-commissioning","cdu-coolant-distribution-unit-commissioning","colocation-cage-cabinet-fit-out","crac-crah-static-pressure-airflow","data-center-adiabatic-evaporative-cooling","data-center-airflow-management-blanking-panels","data-center-commissioning-levels-process","data-center-construction-buildout-phases","data-center-cooling-systems-types-overview","data-center-disaster-recovery-business-continuity","data-center-free-cooling-economizer","data-center-generator-sizing-selection","data-center-grid-flexibility-demand-response","data-center-incident-management-outage-response","data-center-liquid-cooling-leak-detection","data-center-maintenance-management-pm-program","data-center-mop-sop-eop-procedures","data-center-operations-noc-runbooks","data-center-power-density-capacity-planning","data-center-power-distribution-chain","data-center-power-grid-utility-substation","data-center-rack-pdu-types-power-distribution","data-center-site-selection-criteria","data-center-staffing-workforce-development","data-center-tco-cost-model","data-center-thermal-envelope-ashrae-setpoints","data-center-tier-classification-uptime","data-center-types-enterprise-colo-hyperscale-edge","data-center-white-space-gray-space-layout","datacenter-commissioning-operations-overview","datacenter-cooling-airflow-overview","datacenter-electrical-commissioning-power-qa","dcim-monitoring-asset-management","delta-t-return-temperature-management","digital-twin-facility-operations","edge-micro-data-center-deployment","hot-cold-aisle-containment-qa","hvac-fan-array-fanwall-systems","hvac-preventive-maintenance-program","hvac-service-maintenance-agreement","in-row-close-coupled-cooling-commissioning","integrated-systems-test-ist-commissioning","leak-detection-system-commissioning","liquid-cooling-loop-commissioning","liquid-cooling-redundancy-concurrent-maintenance","load-bank-test-acceptance-criteria","modular-prefab-data-center-deployment","pdu-rpp-commissioning","power-capping-oversubscription-management","project-scheduling-look-ahead-planning","rack-readiness-floor-load-layout","raised-access-floor-installation","raised-floor-acceptance-packet","reality-capture-laser-scanning-scan-to-bim","rear-door-heat-exchanger-commissioning","stranded-capacity-power-utilization","thermal-energy-storage-chilled-water-tank","ups-sts-commissioning-hold-points","ups-topology-redundancy-design","waterside-economizer-free-cooling"],"url":"https://anvilfield.com/standards/uptime-institute/"},{"name":"ASHRAE TC 9.9","org":"ASHRAE","slug":"ashrae-tc-9-9","trade":"","guides":["ai-cluster-commissioning-burn-in","ai-gpu-rack-power-cooling-readiness","air-filtration-merv-iaq","building-pressurization-control-makeup-air","cdu-coolant-distribution-unit-commissioning","centrifugal-chiller-surge-control","chilled-beam-active-passive-commissioning","colocation-cage-cabinet-fit-out","conductor-ampacity-derating-nec","crac-crah-static-pressure-airflow","data-center-adiabatic-evaporative-cooling","data-center-airflow-management-blanking-panels","data-center-cabinet-rack-types-selection","data-center-commissioning-levels-process","data-center-construction-buildout-phases","data-center-cooling-systems-types-overview","data-center-direct-to-chip-liquid-cooling","data-center-humidity-control-environmental-envelope","data-center-maintenance-management-pm-program","data-center-pue-energy-efficiency","data-center-rack-cable-management","data-center-rack-pdu-types-power-distribution","data-center-site-selection-criteria","data-center-tco-cost-model","data-center-thermal-envelope-ashrae-setpoints","data-center-tier-classification-uptime","data-center-two-phase-cooling","data-center-waste-heat-recovery-reuse","data-center-water-use-cooling-wue","datacenter-cooling-airflow-overview","dcim-monitoring-asset-management","delta-t-return-temperature-management","digital-twin-facility-operations","duct-design-friction-rate-manual-d","duct-static-pressure","economizer-demand-control-ventilation","edge-micro-data-center-deployment","energy-recovery-ventilator-erv-commissioning","fan-laws-affinity-airflow","hot-cold-aisle-containment-qa","humidification-dehumidification-control","hvac-coil-types-cleaning-maintenance","hvac-duct-cleaning-nadca-iaq","hvac-fan-array-fanwall-systems","hvac-test-instruments-gauges-meters","immersion-cooling-tank-acceptance","in-row-close-coupled-cooling-commissioning","integrated-systems-test-ist-commissioning","it-equipment-rack-stack-deployment-migration","leak-detection-system-commissioning","liquid-cooling-loop-commissioning","liquid-cooling-loop-water-treatment-chemistry","rack-readiness-floor-load-layout","reality-capture-laser-scanning-scan-to-bim","rear-door-heat-exchanger-commissioning","thermal-energy-storage-chilled-water-tank","vav-cav-air-distribution-systems","vfd-variable-frequency-drive-install","waterside-economizer-free-cooling"],"url":"https://anvilfield.com/standards/ashrae-tc-9-9/"},{"name":"UPC","org":"International Code Council","slug":"upc","trade":"","guides":["air-admittance-valve-island-vent","backflow-assembly-test-procedure","backflow-failed-test-repair-checklist","backflow-preventer-assembly-types","commercial-ice-machine-installation-service","commercial-kitchen-equipment-installation","condensate-neutralizer-condensing-appliance","data-center-fiber-cabling-types-singlemode-multimode","domestic-water-service-meter-tap","drain-cleaning-jetting-snaking","dwv-venting-pipe-sizing","floor-drain-trench-drain-installation","flushometer-flush-valve-types","grease-interceptor-sizing-maintenance","hydrostatic-pressure-test-plumbing","indirect-waste-floor-sink-air-gap","industrial-process-piping-systems","irrigation-winterization-blowout-spring-startup","lead-service-line-identification-replacement","low-water-pressure-diagnosis-repair","outdoor-kitchen-construction-installation","pex-copper-cpvc-piping-methods","pipe-hangers-supports-seismic-bracing","pipe-joining-methods-solder-press-solvent","plumbing-cleanout-requirements-access","plumbing-estimating-takeoff","plumbing-fixture-carriers-supports","plumbing-fixture-rough-in-setting","plumbing-fixtures-types-water-efficiency","plumbing-isometric-drawing-riser-diagram-reading","plumbing-oil-water-separator-sand-interceptor","plumbing-permit-inspection-process","plumbing-special-waste-acid-neutralization","plumbing-traps-types-trap-seal","plumbing-valve-types-selection-isolation","potable-water-disinfection-flushing-chlorination","reclaimed-water-purple-pipe-systems","sanitary-building-sewer-lateral-connection","sewage-lift-station-design-pumping","sewer-camera-cctv-inspection","sewer-gas-odor-diagnosis-repair","shower-pan-wet-area-waterproofing","sump-pump-battery-backup-protection","sump-sewage-ejector-pump-sizing","thermostatic-mixing-valve-scald-legionella","trap-primer-floor-drain-protection","trenchless-sewer-repair-pipe-lining-bursting","water-distribution-system-types-upfeed-downfeed","water-hammer-arrestor-sizing","water-heater-maintenance-anode-flushing","water-heater-recirculation-sizing","water-heater-sizing-selection","water-heater-types-tank-tankless-heat-pump","water-pressure-booster-prv-system","water-supply-pipe-sizing-wsfu","water-treatment-softener-filtration","well-pump-pressure-tank-system","wet-venting-common-vent-design"],"url":"https://anvilfield.com/standards/upc/"},{"name":"ASHRAE 90.1","org":"ASHRAE","slug":"ashrae-90-1","trade":"","guides":["air-curtain-door-heater-systems","air-handling-unit-ahu-components-operation","air-side-economizer-fault-detection","boiler-startup-commissioning","building-insulation-air-sealing-envelope","building-pressurization-control-makeup-air","centrifugal-chiller-surge-control","chilled-water-pumping-primary-secondary-variable","chilled-water-vs-dx-cooling-comparison","chiller-plant-sequencing-optimization","chiller-plant-startup-commissioning","chiller-types-selection-centrifugal-screw-scroll","commercial-exhaust-fan-ventilation","commercial-lighting-design-footcandles-controls","cool-roof-reflectivity-energy","cooling-tower-commissioning-water-treatment","cooling-tower-types-operation","data-center-cooling-systems-types-overview","data-center-free-cooling-economizer","dedicated-outdoor-air-system-doas","duct-leakage-pressure-testing","duct-leakage-testing-sealing","ductwork-types-sheet-metal-flex-ductboard","economizer-demand-control-ventilation","energy-recovery-ventilator-erv-commissioning","evaporative-cooling-swamp-cooler-systems","fan-laws-affinity-airflow","humidification-dehumidification-control","hvac-bas-ddc-controls-fundamentals","hvac-duct-insulation-wrap-liner","hvac-fan-array-fanwall-systems","hvac-preventive-maintenance-program","hvac-system-types-overview","hvac-ventilation-rate-outdoor-air-ashrae-62","hydronic-balancing-valves-circuit-setter","hydronic-system-balancing","led-lighting-retrofit-upgrade","lighting-controls-dimming-0-10v-dali","makeup-air-unit-kitchen-ventilation","pipe-insulation-condensation-control","roof-cricket-tapered-insulation","roof-insulation-cover-board-attachment","roof-vapor-retarder-air-barrier","rooftop-unit-rtu-installation-startup","sheet-metal-duct-fabrication-installation","vav-box-commissioning-airflow","vav-cav-air-distribution-systems","water-heater-recirculation-sizing","water-heater-sizing-selection","water-heater-types-tank-tankless-heat-pump","waterside-economizer-free-cooling","whitespace-footcandle-verification"],"url":"https://anvilfield.com/standards/ashrae-90-1/"},{"name":"IBC","org":"International Code Council","slug":"ibc","trade":"","guides":["access-control-system-installation","adhesive-epoxy-anchor-installation","anchor-bolt-baseplate-grout-qa","blue-roof-controlled-flow-drainage","cabling-pathways-firestop","clay-concrete-tile-roof-installation","commercial-av-intercom-system-design","commercial-lighting-design-footcandles-controls","concrete-anchor-fastener-installation","concrete-foundation-types-footings-design","construction-quality-control-qa-qc-program","curtain-wall-glazing-storefront-installation","data-center-raised-floor-vs-slab-design","data-center-seismic-anchoring-equipment","data-center-structural-design-high-density-racks","datacenter-concrete-steel-qa-overview","drainage-grading-slope","drilled-pier-caisson-deep-foundations","edge-metal-coping-wind-design","emergency-egress-lighting-inverter","fire-alarm-system-installation-testing","fire-smoke-damper-installation-testing","fire-sprinkler-system-design-nfpa13","foundation-underpinning-methods-repair","gutter-downspout-exterior-drainage","hardscape-drainage-patio-retaining","high-strength-bolting-rcsc","metal-railing-guardrail-fabrication","pergola-gazebo-shade-structure-construction","pipe-penetration-firestop-sleeves","quality-control-itp-inspection-test-plan","raised-access-floor-installation","raised-floor-acceptance-packet","raised-floor-load-rating-test","rebar-mechanical-splices-couplers","retaining-wall-types-selection","roof-cricket-tapered-insulation","roof-drainage-scupper-drain-sizing","roof-hatch-access-fall-protection","roof-tear-off-reroof-recover-decision","roofing-system-types-overview-steep-low-slope","segmental-retaining-wall-build","skylight-curb-installation-flashing","slab-strength-acceptance-cylinders","solar-ready-pv-roof-provisions","storm-drainage-interior-piping-sizing","structural-fireproofing-sfrm-intumescent","structural-steel-erection-connections","stucco-eifs-exterior-wall-systems","whitespace-footcandle-verification","wood-composite-deck-construction"],"url":"https://anvilfield.com/standards/ibc/"},{"name":"TIA-942","org":"Standards body","slug":"tia-942","trade":"","guides":["ai-cluster-commissioning-burn-in","ai-gpu-rack-power-cooling-readiness","cabling-pathways-firestop","colocation-cage-cabinet-fit-out","cross-connect-patch-record-mmr","data-center-airflow-management-blanking-panels","data-center-cabinet-rack-types-selection","data-center-construction-buildout-phases","data-center-cooling-systems-types-overview","data-center-disaster-recovery-business-continuity","data-center-fiber-cabling-types-singlemode-multimode","data-center-gpu-network-optics-cabling","data-center-network-architecture-spine-leaf","data-center-physical-security-access-control","data-center-power-distribution-chain","data-center-rack-cable-management","data-center-rack-pdu-types-power-distribution","data-center-raised-floor-vs-slab-design","data-center-site-selection-criteria","data-center-tier-classification-uptime","data-center-types-enterprise-colo-hyperscale-edge","data-center-white-space-gray-space-layout","datacenter-cooling-airflow-overview","datacenter-structured-cabling-overview","dcim-monitoring-asset-management","delta-t-return-temperature-management","edge-micro-data-center-deployment","fiber-otdr-bidirectional-certification","fiber-splice-loss-budget","hot-cold-aisle-containment-qa","in-row-close-coupled-cooling-commissioning","it-equipment-rack-stack-deployment-migration","leak-detection-system-commissioning","modular-prefab-data-center-deployment","mpo-mtp-polarity-methods","rack-readiness-floor-load-layout","raised-access-floor-installation","raised-floor-acceptance-packet","reality-capture-laser-scanning-scan-to-bim","thermal-energy-storage-chilled-water-tank","tia-606-labeling-administration","ups-topology-redundancy-design","whitespace-footcandle-verification"],"url":"https://anvilfield.com/standards/tia-942/"},{"name":"ACI 318","org":"American Concrete Institute","slug":"aci-318","trade":"","guides":["adhesive-epoxy-anchor-installation","air-entrainment-freeze-thaw-durability","anchor-bolt-baseplate-grout-qa","cold-weather-concreting-protection","concrete-admixtures-types-guide","concrete-anchor-fastener-installation","concrete-crack-types-causes-prevention","concrete-curb-gutter-sidewalk-flatwork","concrete-curing-methods-protection","concrete-driveway-installation","concrete-estimating-takeoff","concrete-formwork-shoring-reshoring","concrete-formwork-types-systems","concrete-foundation-types-footings-design","concrete-maturity-method-temperature-monitoring","concrete-mix-design-water-cement-ratio","concrete-placement-consolidation-vibration","concrete-repair-spall-restoration","concrete-scanning-gpr-before-drill","concrete-slump-test","concrete-strength-testing-cylinders","construction-quality-control-qa-qc-program","data-center-seismic-anchoring-equipment","datacenter-concrete-steel-qa-overview","drilled-pier-caisson-deep-foundations","hot-weather-concreting-protection","lightweight-concrete-structural-insulating","metal-railing-guardrail-fabrication","post-tension-slab-stressing","precast-concrete-erection-connections","quality-control-itp-inspection-test-plan","ready-mix-concrete-ordering-delivery","rebar-corrosion-protection-epoxy-galvanized","rebar-detailing-bar-bending-schedule","rebar-development-length-lap-splices","rebar-mechanical-splices-couplers","rebar-placement-cover-inspection","slab-on-grade-design-thickness","slab-strength-acceptance-cylinders","tilt-up-panel-bracing-erection"],"url":"https://anvilfield.com/standards/aci-318/"},{"name":"NFPA 70E","org":"National Fire Protection Association","slug":"nfpa-70e","trade":"","guides":["arc-energy-reduction-methods-240-87","arc-flash-ppe-categories-clothing","arc-flash-study-labels","battery-room-ventilation-hydrogen-safety","bess-commissioning-punch-list","data-center-battery-energy-storage-types","data-center-construction-buildout-phases","data-center-decommissioning-equipment-removal","data-center-maintenance-management-pm-program","data-center-mop-sop-eop-procedures","data-center-rack-dc-power-distribution-hvdc","datacenter-electrical-commissioning-power-qa","datacenter-fire-life-safety-overview","distribution-equipment-switchgear-switchboard-panelboard","electrical-disconnect-switch-types-requirements","electrical-hazardous-classified-locations","electrical-one-line-diagram-reading-symbols","electrical-service-panel-upgrade","electrical-shock-first-aid-aed","electrical-submetering-energy-monitoring","electrical-troubleshooting-multimeter-testing","electrical-working-clearance-110-26","emergency-power-off-epo-testing","field-service-work-order-management","infrared-thermography-inspection","lockout-tagout-electrical-safety","medium-voltage-switchgear-maintenance-testing","motor-control-center-mcc-commissioning","mv-cable-termination-testing","panelboard-installation-circuit-directory","power-factor-correction-capacitor-bank","ppe-hazard-assessment-selection","protective-relay-coordination-study","selective-coordination-overcurrent","solar-pv-om-utility-scale-maintenance","termination-torque-qa","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/nfpa-70e/"},{"name":"OSHA 1926","org":"U.S. OSHA","slug":"osha-1926","trade":"","guides":["asbestos-abatement-removal-procedures","assured-equipment-grounding-aegcp","building-demolition-methods-planning","cell-tower-construction-antenna-installation","concrete-cutting-coring-methods-safety","concrete-formwork-shoring-reshoring","concrete-formwork-types-systems","confined-space-entry-permit-required","construction-dewatering-groundwater-control","construction-safety-program-osha","crane-rigging-signals-safety","excavation-shoring-soldier-pile-sheet-pile","gfci-afci-protection-nec","hearing-conservation-noise-osha","interior-selective-demolition-strip-out","jobsite-housekeeping-slips-trips","jobsite-logistics-site-planning","ladder-safety-portable-osha","lead-paint-rrp-renovation-safe-work","lockout-tagout-electrical-safety","mast-climbing-work-platform-safety","polished-concrete-floor-grind-densify","ppe-hazard-assessment-selection","pre-engineered-metal-building-erection","precast-concrete-erection-connections","roof-fall-protection-safety-osha","rooftop-permanent-fall-protection-systems","scaffold-safety-supported-osha","siding-installation-vinyl-fiber-cement","silica-dust-control-osha-table-1","silica-exposure-control-program-osha","struck-by-caught-in-hazards","structural-steel-erection-connections","suspended-scaffold-swing-stage-safety","temporary-power-construction-site","tilt-up-panel-bracing-erection","trench-excavation-safety-osha","utility-locating-call-before-you-dig"],"url":"https://anvilfield.com/standards/osha-1926/"},{"name":"ASCE 7","org":"American Society of Civil Engineers","slug":"asce-7","trade":"","guides":["acoustical-suspended-ceiling-installation","ballasted-roof-system-installation","blue-roof-controlled-flow-drainage","boat-dock-marina-construction","data-center-cabinet-rack-types-selection","data-center-raised-floor-vs-slab-design","data-center-seismic-anchoring-equipment","data-center-structural-design-high-density-racks","datacenter-concrete-steel-qa-overview","edge-metal-coping-wind-design","electric-sign-channel-letter-installation","epdm-rubber-roof-installation","low-slope-membrane-selection-tpo-epdm-pvc","metal-roof-types-comparison","pergola-gazebo-shade-structure-construction","pipe-hangers-supports-seismic-bracing","rack-readiness-floor-load-layout","raised-access-floor-installation","raised-floor-acceptance-packet","raised-floor-load-rating-test","roof-cricket-tapered-insulation","roof-deck-substrate-types","roof-drainage-scupper-drain-sizing","roof-expansion-joint-installation","roof-ice-dam-snow-load-management","roof-insulation-cover-board-attachment","roof-ponding-water-diagnosis-correction","roofing-system-types-overview-steep-low-slope","rooftop-solar-pv-mounting-racking","sheet-metal-duct-fabrication-installation","single-ply-attachment-methods-wind","single-ply-membrane-seam-qa","snow-guard-retention-systems","solar-ready-pv-roof-provisions","standing-seam-metal-roof-installation","storm-drainage-interior-piping-sizing"],"url":"https://anvilfield.com/standards/asce-7/"},{"name":"ASHRAE 62.1","org":"ASHRAE","slug":"ashrae-62-1","trade":"","guides":["air-balancing-report-procedure","air-filtration-merv-iaq","air-handling-unit-ahu-components-operation","building-insulation-air-sealing-envelope","building-pressurization-control-makeup-air","commercial-exhaust-fan-ventilation","dedicated-outdoor-air-system-doas","duct-static-pressure","economizer-demand-control-ventilation","energy-recovery-ventilator-erv-commissioning","healthcare-hospital-hvac-ventilation-ashrae-170","humidification-dehumidification-control","hvac-air-distribution-diffusers-grilles-registers","hvac-coil-types-cleaning-maintenance","hvac-desiccant-dehumidification-systems","hvac-duct-cleaning-nadca-iaq","hvac-estimating-bidding","hvac-preventive-maintenance-program","hvac-system-types-overview","hvac-ventilation-rate-outdoor-air-ashrae-62","hvac-zoning-systems-dampers-thermostats","indoor-air-quality-investigation-testing","indoor-air-quality-monitoring-sensors","natatorium-indoor-pool-dehumidification","vav-box-commissioning-airflow","vav-cav-air-distribution-systems"],"url":"https://anvilfield.com/standards/ashrae-62-1/"},{"name":"NFPA 110","org":"National Fire Protection Association","slug":"nfpa-110","trade":"","guides":["automatic-transfer-switch-commissioning","bms-ddc-controls-commissioning","data-center-commissioning-levels-process","data-center-construction-buildout-phases","data-center-generator-sizing-selection","data-center-maintenance-management-pm-program","data-center-onsite-generation-fuel-cell-microgrid","data-center-power-distribution-chain","data-center-white-space-gray-space-layout","datacenter-commissioning-operations-overview","datacenter-electrical-commissioning-power-qa","datacenter-fire-life-safety-overview","electrical-generator-load-bank-testing","electrical-generator-paralleling-synchronization","elevator-modernization-maintenance","emergency-egress-lighting-inverter","emergency-standby-power-systems-nec-700","fire-pump-acceptance-test","fire-pump-standpipe-system-design","generator-acceptance-loadbank-turnover","generator-fuel-system-day-tank","generator-paralleling-switchgear","integrated-systems-test-ist-commissioning","load-bank-test-acceptance-criteria","standby-generator-ats-installation","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/nfpa-110/"},{"name":"SMACNA","org":"SMACNA","slug":"smacna","trade":"","guides":["air-balancing-report-procedure","air-handling-unit-ahu-components-operation","commercial-exhaust-fan-ventilation","crac-crah-static-pressure-airflow","data-center-seismic-anchoring-equipment","duct-design-friction-rate-manual-d","duct-leakage-pressure-testing","duct-leakage-testing-sealing","duct-static-pressure","ductwork-types-sheet-metal-flex-ductboard","gutter-downspout-exterior-drainage","hvac-air-distribution-diffusers-grilles-registers","hvac-duct-insulation-wrap-liner","hvac-estimating-bidding","hvac-vibration-isolation-equipment-mounting","hvac-zoning-systems-dampers-thermostats","hydronic-balancing-valves-circuit-setter","metal-roof-types-comparison","parapet-wall-base-flashing-detail","roof-expansion-joint-installation","roof-flashing-types-overview","roof-penetration-flashing-details","sheet-metal-duct-fabrication-installation","standing-seam-metal-roof-installation","vav-cav-air-distribution-systems"],"url":"https://anvilfield.com/standards/smacna/"},{"name":"IECC","org":"International Code Council","slug":"iecc","trade":"","guides":["air-curtain-door-heater-systems","air-side-economizer-fault-detection","building-insulation-air-sealing-envelope","chilled-water-pumping-primary-secondary-variable","chiller-plant-sequencing-optimization","commercial-lighting-design-footcandles-controls","cool-roof-reflectivity-energy","dedicated-outdoor-air-system-doas","duct-leakage-testing-sealing","ductwork-types-sheet-metal-flex-ductboard","energy-recovery-ventilator-erv-commissioning","hvac-duct-insulation-wrap-liner","led-lighting-retrofit-upgrade","lighting-controls-dimming-0-10v-dali","makeup-air-unit-kitchen-ventilation","pipe-insulation-condensation-control","roof-cricket-tapered-insulation","roof-insulation-cover-board-attachment","roof-vapor-retarder-air-barrier","roofing-system-types-overview-steep-low-slope","sheet-metal-duct-fabrication-installation","solar-ready-pv-roof-provisions","whitespace-footcandle-verification"],"url":"https://anvilfield.com/standards/iecc/"},{"name":"OSHA 1910","org":"U.S. OSHA","slug":"osha-1910","trade":"","guides":["arc-flash-ppe-categories-clothing","arc-flash-study-labels","asbestos-abatement-removal-procedures","biohazard-trauma-sewage-cleanup","cold-storage-refrigerated-warehouse-design","compressed-gas-cylinder-safety-handling","confined-space-entry-permit-required","data-center-decommissioning-equipment-removal","electrical-disconnect-switch-types-requirements","electrical-hazardous-classified-locations","hearing-conservation-noise-osha","jobsite-housekeeping-slips-trips","lockout-tagout-electrical-safety","overhead-door-dock-leveler-installation","ppe-hazard-assessment-selection","respiratory-protection-program-osha","roof-hatch-access-fall-protection","rooftop-permanent-fall-protection-systems","sewage-lift-station-design-pumping","silica-exposure-control-program-osha","storage-tank-coating-lining-interior","tree-removal-stump-grinding"],"url":"https://anvilfield.com/standards/osha-1910/"},{"name":"IRC","org":"International Code Council","slug":"irc","trade":"","guides":["building-insulation-air-sealing-envelope","clay-concrete-tile-roof-installation","commercial-fence-gate-installation","concrete-foundation-types-footings-design","drainage-grading-slope","gutter-downspout-exterior-drainage","hardscape-drainage-patio-retaining","metal-railing-guardrail-fabrication","outdoor-fire-feature-pit-fireplace","pergola-gazebo-shade-structure-construction","retaining-wall-types-selection","roof-cricket-tapered-insulation","roof-drainage-scupper-drain-sizing","roof-tear-off-reroof-recover-decision","roofing-system-types-overview-steep-low-slope","segmental-retaining-wall-build","siding-installation-vinyl-fiber-cement","stucco-eifs-exterior-wall-systems","water-heater-venting-combustion-air","wood-composite-deck-construction"],"url":"https://anvilfield.com/standards/irc/"},{"name":"ACI 301","org":"American Concrete Institute","slug":"aci-301","trade":"","guides":["cold-weather-concreting-protection","concrete-admixtures-types-guide","concrete-crack-types-causes-prevention","concrete-curing-methods-protection","concrete-estimating-takeoff","concrete-formwork-types-systems","concrete-foundation-types-footings-design","concrete-mix-design-water-cement-ratio","concrete-placement-consolidation-vibration","concrete-slump-test","concrete-strength-testing-cylinders","datacenter-concrete-steel-qa-overview","flatwork-finishing-sequence","hot-weather-concreting-protection","mass-concrete-thermal-control-cracking","ready-mix-concrete-ordering-delivery","rebar-development-length-lap-splices","rebar-placement-cover-inspection","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/aci-301/"},{"name":"NETA","org":"InterNational Electrical Testing Association","slug":"neta","trade":"","guides":["automatic-transfer-switch-commissioning","bess-commissioning-punch-list","busway-receiving-megger-qa","datacenter-electrical-commissioning-power-qa","epms-power-monitoring-metering","generator-acceptance-loadbank-turnover","generator-paralleling-switchgear","load-bank-test-acceptance-criteria","medium-voltage-cable-termination-splicing","medium-voltage-switchgear-maintenance-testing","motor-control-center-mcc-commissioning","mv-cable-termination-testing","padmount-transformer-receiving-energization","pdu-rpp-commissioning","protective-relay-coordination-study","switchgear-receiving-inspection-checklist","transformer-acceptance-testing-ttr","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/neta/"},{"name":"IMC","org":"International Code Council","slug":"imc","trade":"","guides":["battery-room-ventilation-hydrogen-safety","building-pressurization-control-makeup-air","commercial-exhaust-fan-ventilation","commercial-kitchen-equipment-installation","condensate-drain-trap-management","conduit-bending-fundamentals","conduit-bodies-fittings-installation","conduit-fill-nec-chapter-9","dedicated-outdoor-air-system-doas","ductless-mini-split-multi-zone-install","electrical-hazardous-classified-locations","electrical-pull-junction-box-sizing","fire-smoke-damper-installation-testing","makeup-air-unit-kitchen-ventilation","pipe-hangers-supports-seismic-bracing","split-system-condenser-lineset-install","wiring-methods-raceway-conduit-types"],"url":"https://anvilfield.com/standards/imc/"},{"name":"NFPA 72","org":"National Fire Protection Association","slug":"nfpa-72","trade":"","guides":["access-control-system-installation","aspirating-smoke-detection-vesda","bms-ddc-controls-commissioning","clean-agent-suppression-room-integrity","commercial-av-intercom-system-design","das-in-building-wireless-public-safety","data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview","dry-pipe-preaction-trip-test","emergency-power-off-epo-testing","fire-alarm-system-installation-testing","intrusion-alarm-system-installation","low-voltage-class2-systems-cabling","raised-access-floor-installation","raised-floor-acceptance-packet","rooftop-unit-rtu-installation-startup"],"url":"https://anvilfield.com/standards/nfpa-72/"},{"name":"ASHRAE Guideline 0","org":"ASHRAE","slug":"ashrae-guideline-0","trade":"","guides":["bms-ddc-controls-commissioning","boiler-startup-commissioning","chiller-plant-sequencing-optimization","chiller-plant-startup-commissioning","data-center-commissioning-levels-process","data-center-construction-buildout-phases","datacenter-commissioning-operations-overview","datacenter-electrical-commissioning-power-qa","integrated-systems-test-ist-commissioning","leak-detection-system-commissioning","modular-prefab-data-center-deployment","proof-packet-assembly-turnover","punch-list-closeout-turnover","retro-commissioning-existing-buildings","vav-box-commissioning-airflow"],"url":"https://anvilfield.com/standards/ashrae-guideline-0/"},{"name":"ACI 302","org":"American Concrete Institute","slug":"aci-302","trade":"","guides":["concrete-crack-types-causes-prevention","concrete-curb-gutter-sidewalk-flatwork","concrete-driveway-installation","concrete-evaporation-rate-plastic-cracking","concrete-slab-curling-warping-control","concrete-surface-defects-diagnosis","construction-control-joint-layout","flatwork-finishing-sequence","floor-flatness-levelness-ff-fl","laser-screed-concrete-screeding-methods","polished-concrete-floor-grind-densify","slab-on-grade-design-thickness","stamped-decorative-concrete-install","under-slab-vapor-barrier-moisture"],"url":"https://anvilfield.com/standards/aci-302/"},{"name":"TIA-568","org":"Standards body","slug":"tia-568","trade":"","guides":["cabling-pathways-firestop","copper-cat6a-certification","cross-connect-patch-record-mmr","data-center-fiber-cabling-types-singlemode-multimode","data-center-gpu-network-optics-cabling","data-center-network-architecture-spine-leaf","data-center-rack-cable-management","datacenter-structured-cabling-overview","fiber-otdr-bidirectional-certification","fiber-splice-loss-budget","low-voltage-class2-systems-cabling","mpo-mtp-polarity-methods","poe-voltage-drop-and-heat-quick-check","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/tia-568/"},{"name":"NFPA 54","org":"National Fire Protection Association","slug":"nfpa-54","trade":"","guides":["building-pressurization-control-makeup-air","combustion-analysis-flue-gas-tuning","commercial-kitchen-equipment-installation","gas-furnace-operation-troubleshooting","hvac-infrared-radiant-tube-heater","hvac-unit-heater-gas-electric","natural-gas-piping-sizing-install","outdoor-fire-feature-pit-fireplace","outdoor-kitchen-construction-installation","plumbing-estimating-takeoff","propane-lp-gas-system-install","water-heater-maintenance-anode-flushing","water-heater-venting-combustion-air"],"url":"https://anvilfield.com/standards/nfpa-54/"},{"name":"ASTM C39","org":"ASTM International","slug":"astm-c39","trade":"","guides":["cold-weather-concreting-protection","concrete-estimating-takeoff","concrete-mix-design-water-cement-ratio","concrete-pavement-jointing-curing","concrete-placement-consolidation-vibration","concrete-slump-test","concrete-strength-testing-cylinders","construction-quality-control-qa-qc-program","datacenter-concrete-steel-qa-overview","hot-weather-concreting-protection","lightweight-concrete-structural-insulating","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c39/"},{"name":"NFPA 75","org":"National Fire Protection Association","slug":"nfpa-75","trade":"","guides":["aspirating-smoke-detection-vesda","cabling-pathways-firestop","data-center-decommissioning-equipment-removal","data-center-fire-suppression-systems-comparison","data-center-two-phase-cooling","datacenter-fire-life-safety-overview","dry-pipe-preaction-trip-test","emergency-power-off-epo-testing","hot-cold-aisle-containment-qa","immersion-cooling-tank-acceptance","raised-access-floor-installation","raised-floor-acceptance-packet"],"url":"https://anvilfield.com/standards/nfpa-75/"},{"name":"ASTM F2170","org":"ASTM International","slug":"astm-f2170","trade":"","guides":["commercial-flooring-resilient-installation","concrete-curing-methods-protection","concrete-overlay-resurfacing-decorative","concrete-sealers-coatings-protection","epoxy-resinous-floor-coating-install","polished-concrete-floor-grind-densify","self-leveling-underlayment-floor-prep","slab-moisture-testing-flooring-rh","terrazzo-flooring-installation-polishing","traffic-deck-waterproofing-coating","under-slab-vapor-barrier-moisture"],"url":"https://anvilfield.com/standards/astm-f2170/"},{"name":"NFPA 70B","org":"National Fire Protection Association","slug":"nfpa-70b","trade":"","guides":["busway-receiving-megger-qa","clean-agent-suppression-room-integrity","data-center-maintenance-management-pm-program","datacenter-electrical-commissioning-power-qa","electrical-generator-load-bank-testing","infrared-thermography-inspection","medium-voltage-switchgear-maintenance-testing","padmount-transformer-receiving-energization","switchgear-receiving-inspection-checklist","termination-torque-qa","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/nfpa-70b/"},{"name":"NFPA 855","org":"National Fire Protection Association","slug":"nfpa-855","trade":"","guides":["battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","bess-commissioning-punch-list","data-center-battery-energy-storage-types","data-center-battery-monitoring-system-vrla-lithium","data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview","lithium-ion-battery-thermal-runaway-safety","rack-bbu-energy-storage-ride-through","ups-battery-maintenance-testing","ups-types-online-line-interactive-standby"],"url":"https://anvilfield.com/standards/nfpa-855/"},{"name":"TIA-606","org":"Standards body","slug":"tia-606","trade":"","guides":["cross-connect-patch-record-mmr","data-center-construction-buildout-phases","data-center-fiber-cabling-types-singlemode-multimode","data-center-rack-cable-management","data-center-white-space-gray-space-layout","datacenter-structured-cabling-overview","dcim-monitoring-asset-management","it-equipment-rack-stack-deployment-migration","low-voltage-class2-systems-cabling","rack-readiness-floor-load-layout","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/tia-606/"},{"name":"ASTM C31","org":"ASTM International","slug":"astm-c31","trade":"","guides":["cold-weather-concreting-protection","concrete-mix-design-water-cement-ratio","concrete-placement-consolidation-vibration","concrete-slump-test","concrete-strength-testing-cylinders","construction-quality-control-qa-qc-program","datacenter-concrete-steel-qa-overview","hot-weather-concreting-protection","ready-mix-concrete-ordering-delivery","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c31/"},{"name":"ASTM E1155","org":"ASTM International","slug":"astm-e1155","trade":"","guides":["concrete-slab-curling-warping-control","concrete-surface-defects-diagnosis","construction-layout-total-station-gps","datacenter-concrete-steel-qa-overview","flatwork-finishing-sequence","floor-flatness-levelness-ff-fl","laser-screed-concrete-screeding-methods","quality-control-itp-inspection-test-plan","self-leveling-underlayment-floor-prep","slab-on-grade-design-thickness"],"url":"https://anvilfield.com/standards/astm-e1155/"},{"name":"ASTM F1869","org":"ASTM International","slug":"astm-f1869","trade":"","guides":["commercial-flooring-resilient-installation","concrete-curing-methods-protection","concrete-overlay-resurfacing-decorative","concrete-sealers-coatings-protection","epoxy-resinous-floor-coating-install","self-leveling-underlayment-floor-prep","slab-moisture-testing-flooring-rh","terrazzo-flooring-installation-polishing","traffic-deck-waterproofing-coating","under-slab-vapor-barrier-moisture"],"url":"https://anvilfield.com/standards/astm-f1869/"},{"name":"NFPA 13","org":"National Fire Protection Association","slug":"nfpa-13","trade":"","guides":["aspirating-smoke-detection-vesda","data-center-fire-suppression-systems-comparison","data-center-seismic-anchoring-equipment","datacenter-fire-life-safety-overview","dry-pipe-preaction-trip-test","fire-sprinkler-system-design-nfpa13","hot-cold-aisle-containment-qa","hydrostatic-pressure-test-plumbing","pipe-hangers-supports-seismic-bracing","pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/nfpa-13/"},{"name":"ANSI A300","org":"ANSI","slug":"ansi-a300","trade":"","guides":["plant-health-care-phc-program","tree-cabling-bracing-structural-support","tree-planting-staking-establishment","tree-pruning-maintenance-ansi-a300","tree-removal-stump-grinding","tree-risk-assessment-hazard-trees","tree-shrub-planting-establishment","tree-staking-guying-support","tree-transplanting-large-tree-moving"],"url":"https://anvilfield.com/standards/ansi-a300/"},{"name":"ASHRAE 15","org":"ASHRAE","slug":"ashrae-15","trade":"","guides":["chiller-plant-startup-commissioning","chiller-types-selection-centrifugal-screw-scroll","cold-storage-refrigerated-warehouse-design","compressor-types-scroll-screw-reciprocating","hvac-system-types-overview","refrigerant-leak-detection-recovery","refrigerant-piping-line-sizing-design","refrigerant-types-a2l-transition","vrf-system-commissioning-startup"],"url":"https://anvilfield.com/standards/ashrae-15/"},{"name":"ASHRAE 188","org":"ASHRAE","slug":"ashrae-188","trade":"","guides":["chiller-plant-startup-commissioning","cooling-tower-commissioning-water-treatment","cooling-tower-types-operation","data-center-adiabatic-evaporative-cooling","evaporative-cooling-swamp-cooler-systems","healthcare-hospital-hvac-ventilation-ashrae-170","thermostatic-mixing-valve-scald-legionella","water-heater-recirculation-sizing","water-heater-sizing-selection"],"url":"https://anvilfield.com/standards/ashrae-188/"},{"name":"ASME A112","org":"ASME","slug":"asme-a112","trade":"","guides":["backwater-valve-sewer-backup-protection","commercial-pool-construction-shotcrete-shell","floor-drain-trench-drain-installation","flushometer-flush-valve-types","grease-interceptor-sizing-maintenance","plumbing-fixture-carriers-supports","plumbing-fixture-rough-in-setting","plumbing-fixtures-types-water-efficiency","swimming-pool-spa-mechanical-systems"],"url":"https://anvilfield.com/standards/asme-a112/"},{"name":"ASME B31","org":"ASME","slug":"asme-b31","trade":"","guides":["cdu-coolant-distribution-unit-commissioning","chilled-water-hydro-test-package","compressed-air-piping-system-design","data-center-free-cooling-economizer","immersion-cooling-tank-acceptance","industrial-process-piping-systems","liquid-cooling-loop-commissioning","pipe-joining-methods-solder-press-solvent","rear-door-heat-exchanger-commissioning"],"url":"https://anvilfield.com/standards/asme-b31/"},{"name":"ANSI Z223.1","org":"ANSI","slug":"ansi-z223-1","trade":"","guides":["combustion-analysis-flue-gas-tuning","gas-furnace-operation-troubleshooting","hvac-infrared-radiant-tube-heater","hvac-unit-heater-gas-electric","natural-gas-piping-sizing-install","outdoor-fire-feature-pit-fireplace","propane-lp-gas-system-install","water-heater-venting-combustion-air"],"url":"https://anvilfield.com/standards/ansi-z223-1/"},{"name":"ASHRAE 90.4","org":"ASHRAE","slug":"ashrae-90-4","trade":"","guides":["bms-ddc-controls-commissioning","crac-crah-static-pressure-airflow","data-center-cooling-systems-types-overview","data-center-free-cooling-economizer","data-center-humidity-control-environmental-envelope","delta-t-return-temperature-management","hot-cold-aisle-containment-qa","in-row-close-coupled-cooling-commissioning"],"url":"https://anvilfield.com/standards/ashrae-90-4/"},{"name":"IEEE 1584","org":"IEEE","slug":"ieee-1584","trade":"","guides":["arc-energy-reduction-methods-240-87","arc-flash-study-labels","datacenter-electrical-commissioning-power-qa","electrical-one-line-diagram-reading-symbols","panelboard-installation-circuit-directory","protective-relay-coordination-study","selective-coordination-overcurrent","short-circuit-available-fault-current-study"],"url":"https://anvilfield.com/standards/ieee-1584/"},{"name":"IEEE 802.3","org":"IEEE","slug":"ieee-802-3","trade":"","guides":["copper-cat6a-certification","data-center-gpu-network-optics-cabling","data-center-network-architecture-spine-leaf","fiber-splice-loss-budget","low-voltage-class2-systems-cabling","mpo-mtp-polarity-methods","optical-circuit-switch-photonics","video-surveillance-cctv-system-design"],"url":"https://anvilfield.com/standards/ieee-802-3/"},{"name":"NFPA 101","org":"National Fire Protection Association","slug":"nfpa-101","trade":"","guides":["access-control-system-installation","commercial-lighting-design-footcandles-controls","data-center-fire-suppression-systems-comparison","data-center-physical-security-access-control","datacenter-fire-life-safety-overview","emergency-egress-lighting-inverter","emergency-standby-power-systems-nec-700","whitespace-footcandle-verification"],"url":"https://anvilfield.com/standards/nfpa-101/"},{"name":"NFPA 96","org":"National Fire Protection Association","slug":"nfpa-96","trade":"","guides":["commercial-kitchen-equipment-installation","ductwork-types-sheet-metal-flex-ductboard","hvac-duct-cleaning-nadca-iaq","kitchen-exhaust-grease-duct-nfpa96","kitchen-hood-suppression-semiannual","makeup-air-unit-kitchen-ventilation","sheet-metal-duct-fabrication-installation","tenant-improvement-fit-out-buildout"],"url":"https://anvilfield.com/standards/nfpa-96/"},{"name":"UL 9540","org":"Underwriters Laboratories","slug":"ul-9540","trade":"","guides":["battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","bess-commissioning-punch-list","data-center-battery-energy-storage-types","lithium-ion-battery-thermal-runaway-safety","rack-bbu-energy-storage-ride-through","ups-battery-maintenance-testing","ups-types-online-line-interactive-standby"],"url":"https://anvilfield.com/standards/ul-9540/"},{"name":"UL 9540A","org":"Underwriters Laboratories","slug":"ul-9540a","trade":"","guides":["battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","bess-commissioning-punch-list","data-center-battery-energy-storage-types","lithium-ion-battery-thermal-runaway-safety","rack-bbu-energy-storage-ride-through","ups-battery-maintenance-testing","ups-types-online-line-interactive-standby"],"url":"https://anvilfield.com/standards/ul-9540a/"},{"name":"ACI 330","org":"American Concrete Institute","slug":"aci-330","trade":"","guides":["asphalt-vs-concrete-pavement-comparison","concrete-curb-gutter-sidewalk-flatwork","concrete-driveway-installation","concrete-pavement-jointing-curing","concrete-pavement-types-jpcp-crcp","flatwork-finishing-sequence","slab-on-grade-design-thickness"],"url":"https://anvilfield.com/standards/aci-330/"},{"name":"ASHRAE 34","org":"ASHRAE","slug":"ashrae-34","trade":"","guides":["chiller-types-selection-centrifugal-screw-scroll","refrigerant-charging-subcool-superheat","refrigerant-leak-detection-recovery","refrigerant-piping-line-sizing-design","refrigerant-types-a2l-transition","refrigeration-cycle-fundamentals","vrf-system-commissioning-startup"],"url":"https://anvilfield.com/standards/ashrae-34/"},{"name":"ASTM C143","org":"ASTM International","slug":"astm-c143","trade":"","guides":["concrete-mix-design-water-cement-ratio","concrete-placement-consolidation-vibration","concrete-slump-test","datacenter-concrete-steel-qa-overview","hot-weather-concreting-protection","ready-mix-concrete-ordering-delivery","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c143/"},{"name":"ASTM C309","org":"ASTM International","slug":"astm-c309","trade":"","guides":["concrete-coloring-staining-decorative","concrete-curing-methods-protection","concrete-pavement-jointing-curing","concrete-sealers-coatings-protection","concrete-surface-defects-diagnosis","hot-weather-concreting-protection","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/astm-c309/"},{"name":"IFGC","org":"International Code Council","slug":"ifgc","trade":"","guides":["building-pressurization-control-makeup-air","combustion-analysis-flue-gas-tuning","natural-gas-piping-sizing-install","outdoor-kitchen-construction-installation","plumbing-permit-inspection-process","propane-lp-gas-system-install","water-heater-venting-combustion-air"],"url":"https://anvilfield.com/standards/ifgc/"},{"name":"NFPA 25","org":"National Fire Protection Association","slug":"nfpa-25","trade":"","guides":["data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview","dry-pipe-preaction-trip-test","fire-pump-acceptance-test","fire-pump-standpipe-system-design","fire-sprinkler-system-design-nfpa13","fire-watch-patrol-impairment"],"url":"https://anvilfield.com/standards/nfpa-25/"},{"name":"NFPA 780","org":"National Fire Protection Association","slug":"nfpa-780","trade":"","guides":["cell-tower-construction-antenna-installation","data-center-grounding-signal-reference-grid","electrical-surge-protection-spd-types-nec","ground-ring-electrode-nec-250-52","grounding-vs-bonding-explained","lightning-protection-system-nfpa780","surge-protection-spd-installation"],"url":"https://anvilfield.com/standards/nfpa-780/"},{"name":"NFPA 99","org":"National Fire Protection Association","slug":"nfpa-99","trade":"","guides":["electrical-generator-load-bank-testing","emergency-standby-power-systems-nec-700","hydrostatic-pressure-test-plumbing","laboratory-process-vacuum-system","medical-gas-piping-install-certification","pex-copper-cpvc-piping-methods","pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/nfpa-99/"},{"name":"TIA-607","org":"Standards body","slug":"tia-607","trade":"","guides":["data-center-cabinet-rack-types-selection","data-center-grounding-signal-reference-grid","datacenter-structured-cabling-overview","it-equipment-rack-stack-deployment-migration","low-voltage-class2-systems-cabling","rack-readiness-floor-load-layout","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/tia-607/"},{"name":"ACI 117","org":"American Concrete Institute","slug":"aci-117","trade":"","guides":["concrete-slab-curling-warping-control","construction-layout-total-station-gps","flatwork-finishing-sequence","floor-flatness-levelness-ff-fl","laser-screed-concrete-screeding-methods","rebar-placement-cover-inspection"],"url":"https://anvilfield.com/standards/aci-117/"},{"name":"ACI 305","org":"American Concrete Institute","slug":"aci-305","trade":"","guides":["cold-weather-concreting-protection","concrete-curing-methods-protection","concrete-evaporation-rate-plastic-cracking","concrete-surface-defects-diagnosis","hot-weather-concreting-protection","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/aci-305/"},{"name":"ACI 306","org":"American Concrete Institute","slug":"aci-306","trade":"","guides":["cold-weather-concreting-protection","concrete-curing-methods-protection","concrete-evaporation-rate-plastic-cracking","concrete-surface-defects-diagnosis","hot-weather-concreting-protection","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/aci-306/"},{"name":"ACI 308","org":"American Concrete Institute","slug":"aci-308","trade":"","guides":["concrete-curing-methods-protection","concrete-driveway-installation","concrete-evaporation-rate-plastic-cracking","concrete-surface-defects-diagnosis","flatwork-finishing-sequence","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/aci-308/"},{"name":"ACI 360","org":"American Concrete Institute","slug":"aci-360","trade":"","guides":["concrete-crack-types-causes-prevention","concrete-driveway-installation","concrete-slab-curling-warping-control","construction-control-joint-layout","fiber-reinforced-concrete-design-use","slab-on-grade-design-thickness"],"url":"https://anvilfield.com/standards/aci-360/"},{"name":"ASHRAE Guideline 36","org":"ASHRAE","slug":"ashrae-guideline-36","trade":"","guides":["air-side-economizer-fault-detection","bms-ddc-controls-commissioning","building-automation-fault-detection-diagnostics","hvac-bas-ddc-controls-fundamentals","vav-box-commissioning-airflow","vav-cav-air-distribution-systems"],"url":"https://anvilfield.com/standards/ashrae-guideline-36/"},{"name":"ASTM C1074","org":"ASTM International","slug":"astm-c1074","trade":"","guides":["cold-weather-concreting-protection","concrete-curing-methods-protection","concrete-maturity-method-temperature-monitoring","concrete-pavement-jointing-curing","concrete-strength-testing-cylinders","jobsite-iot-rtls-connected-jobsite"],"url":"https://anvilfield.com/standards/astm-c1074/"},{"name":"ASTM D2041","org":"ASTM International","slug":"astm-d2041","trade":"","guides":["asphalt-compaction-window-guide","asphalt-density-compaction-testing","asphalt-mill-overlay-resurfacing","asphalt-paving-cold-weather-temperature-limits","asphalt-paving-inspection-quality-control","warm-mix-asphalt-wma"],"url":"https://anvilfield.com/standards/astm-d2041/"},{"name":"ASTM D2950","org":"ASTM International","slug":"astm-d2950","trade":"","guides":["asphalt-compaction-window-guide","asphalt-density-compaction-testing","asphalt-mill-overlay-resurfacing","asphalt-paving-cold-weather-temperature-limits","asphalt-paving-inspection-quality-control","warm-mix-asphalt-wma"],"url":"https://anvilfield.com/standards/astm-d2950/"},{"name":"IEEE 142","org":"IEEE","slug":"ieee-142","trade":"","guides":["datacenter-electrical-commissioning-power-qa","ground-resistance-bonding-testing","ground-ring-electrode-nec-250-52","grounding-electrode-system-bonding","grounding-vs-bonding-explained","surge-protection-spd-installation"],"url":"https://anvilfield.com/standards/ieee-142/"},{"name":"NFPA 76","org":"National Fire Protection Association","slug":"nfpa-76","trade":"","guides":["aspirating-smoke-detection-vesda","data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview","dry-pipe-preaction-trip-test","emergency-power-off-epo-testing","raised-floor-acceptance-packet"],"url":"https://anvilfield.com/standards/nfpa-76/"},{"name":"Tier III","org":"Standards body","slug":"tier-iii","trade":"","guides":["data-center-maintenance-management-pm-program","data-center-mop-sop-eop-procedures","data-center-tier-classification-uptime","data-center-types-enterprise-colo-hyperscale-edge","liquid-cooling-redundancy-concurrent-maintenance","ups-topology-redundancy-design"],"url":"https://anvilfield.com/standards/tier-iii/"},{"name":"ANSI Z60.1","org":"ANSI","slug":"ansi-z60-1","trade":"","guides":["landscape-design-principles-plant-selection","landscape-estimating-bidding","tree-shrub-planting-establishment","tree-staking-guying-support","tree-transplanting-large-tree-moving"],"url":"https://anvilfield.com/standards/ansi-z60-1/"},{"name":"ASHRAE 202","org":"ASHRAE","slug":"ashrae-202","trade":"","guides":["bms-ddc-controls-commissioning","data-center-commissioning-levels-process","datacenter-commissioning-operations-overview","integrated-systems-test-ist-commissioning","retro-commissioning-existing-buildings"],"url":"https://anvilfield.com/standards/ashrae-202/"},{"name":"ASHRAE 55","org":"ASHRAE","slug":"ashrae-55","trade":"","guides":["dedicated-outdoor-air-system-doas","humidification-dehumidification-control","hvac-air-distribution-diffusers-grilles-registers","indoor-air-quality-investigation-testing","psychrometric-chart-reading-field-guide"],"url":"https://anvilfield.com/standards/ashrae-55/"},{"name":"ASTM C1064","org":"ASTM International","slug":"astm-c1064","trade":"","guides":["cold-weather-concreting-protection","concrete-evaporation-rate-plastic-cracking","concrete-slump-test","datacenter-concrete-steel-qa-overview","hot-weather-concreting-protection"],"url":"https://anvilfield.com/standards/astm-c1064/"},{"name":"ASTM C138","org":"ASTM International","slug":"astm-c138","trade":"","guides":["concrete-mix-design-water-cement-ratio","concrete-slump-test","datacenter-concrete-steel-qa-overview","lightweight-concrete-structural-insulating","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c138/"},{"name":"ASTM C231","org":"ASTM International","slug":"astm-c231","trade":"","guides":["cold-weather-concreting-protection","concrete-mix-design-water-cement-ratio","concrete-slump-test","datacenter-concrete-steel-qa-overview","hot-weather-concreting-protection"],"url":"https://anvilfield.com/standards/astm-c231/"},{"name":"ASTM C94","org":"ASTM International","slug":"astm-c94","trade":"","guides":["concrete-mix-design-water-cement-ratio","concrete-slump-test","concrete-strength-testing-cylinders","hot-weather-concreting-protection","ready-mix-concrete-ordering-delivery"],"url":"https://anvilfield.com/standards/astm-c94/"},{"name":"ASTM D6433","org":"ASTM International","slug":"astm-d6433","trade":"","guides":["asphalt-pavement-distress-crack-diagnosis","fog-seal-rejuvenator-pavement-preservation","pavement-condition-assessment-pci","pavement-preservation-treatments-overview","sealcoat-crack-seal-maintenance"],"url":"https://anvilfield.com/standards/astm-d6433/"},{"name":"IFC","org":"International Code Council","slug":"ifc","trade":"","guides":["battery-room-ventilation-hydrogen-safety","das-in-building-wireless-public-safety","fire-alarm-system-installation-testing","rooftop-solar-pv-mounting-racking","solar-ready-pv-roof-provisions"],"url":"https://anvilfield.com/standards/ifc/"},{"name":"IICRC S500","org":"IICRC","slug":"iicrc-s500","trade":"","guides":["biohazard-trauma-sewage-cleanup","contents-pack-out-restoration-inventory","fire-smoke-damage-restoration-iicrc-s700","water-damage-mitigation-structural-drying","water-damage-restoration-mitigation-iicrc-s500"],"url":"https://anvilfield.com/standards/iicrc-s500/"},{"name":"ISO/IEC 30134","org":"Standards body","slug":"iso-iec-30134","trade":"","guides":["data-center-power-density-capacity-planning","data-center-pue-energy-efficiency","data-center-sustainability-reporting-metrics","data-center-tco-cost-model","data-center-water-use-cooling-wue"],"url":"https://anvilfield.com/standards/iso-iec-30134/"},{"name":"TIA-569","org":"Standards body","slug":"tia-569","trade":"","guides":["cable-tray-fill-copper-takeoff","cabling-pathways-firestop","datacenter-structured-cabling-overview","low-voltage-class2-systems-cabling","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/tia-569/"},{"name":"Tier IV","org":"Standards body","slug":"tier-iv","trade":"","guides":["data-center-disaster-recovery-business-continuity","data-center-tier-classification-uptime","data-center-types-enterprise-colo-hyperscale-edge","liquid-cooling-redundancy-concurrent-maintenance","ups-topology-redundancy-design"],"url":"https://anvilfield.com/standards/tier-iv/"},{"name":"ACI 355","org":"American Concrete Institute","slug":"aci-355","trade":"","guides":["anchor-bolt-baseplate-grout-qa","concrete-anchor-fastener-installation","datacenter-concrete-steel-qa-overview","metal-railing-guardrail-fabrication"],"url":"https://anvilfield.com/standards/aci-355/"},{"name":"ANSI/ESD S20.20","org":"ANSI","slug":"ansi-esd-s20-20","trade":"","guides":["esd-floor-testing-s20-20","raised-access-floor-installation","raised-floor-acceptance-packet","raised-floor-load-rating-test"],"url":"https://anvilfield.com/standards/ansi-esd-s20-20/"},{"name":"ASTM C1583","org":"ASTM International","slug":"astm-c1583","trade":"","guides":["concrete-overlay-resurfacing-decorative","concrete-repair-spall-restoration","concrete-sealers-coatings-protection","parking-structure-restoration-repair"],"url":"https://anvilfield.com/standards/astm-c1583/"},{"name":"ASTM C172","org":"ASTM International","slug":"astm-c172","trade":"","guides":["concrete-slump-test","concrete-strength-testing-cylinders","datacenter-concrete-steel-qa-overview","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c172/"},{"name":"ASTM C173","org":"ASTM International","slug":"astm-c173","trade":"","guides":["cold-weather-concreting-protection","concrete-mix-design-water-cement-ratio","concrete-slump-test","hot-weather-concreting-protection"],"url":"https://anvilfield.com/standards/astm-c173/"},{"name":"ASTM C260","org":"ASTM International","slug":"astm-c260","trade":"","guides":["air-entrainment-freeze-thaw-durability","cold-weather-concreting-protection","concrete-admixtures-types-guide","concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/astm-c260/"},{"name":"ASTM D226","org":"ASTM International","slug":"astm-d226","trade":"","guides":["roofing-underlayment-types-felt-synthetic","siding-installation-vinyl-fiber-cement","steep-slope-asphalt-shingle-roofing","wood-shake-shingle-roof-installation"],"url":"https://anvilfield.com/standards/astm-d226/"},{"name":"ASTM E1745","org":"ASTM International","slug":"astm-e1745","trade":"","guides":["below-grade-foundation-waterproofing","slab-on-grade-design-thickness","terrazzo-flooring-installation-polishing","under-slab-vapor-barrier-moisture"],"url":"https://anvilfield.com/standards/astm-e1745/"},{"name":"ASTM E814","org":"ASTM International","slug":"astm-e814","trade":"","guides":["cabling-pathways-firestop","drywall-gypsum-board-finishing","pipe-penetration-firestop-sleeves","structural-fireproofing-sfrm-intumescent"],"url":"https://anvilfield.com/standards/astm-e814/"},{"name":"ASTM F710","org":"ASTM International","slug":"astm-f710","trade":"","guides":["commercial-flooring-resilient-installation","epoxy-resinous-floor-coating-install","self-leveling-underlayment-floor-prep","slab-moisture-testing-flooring-rh"],"url":"https://anvilfield.com/standards/astm-f710/"},{"name":"AWS D1.1","org":"American Welding Society","slug":"aws-d1-1","trade":"","guides":["datacenter-concrete-steel-qa-overview","precast-concrete-erection-connections","structural-steel-erection-connections","weld-heat-input-cwi-acceptance"],"url":"https://anvilfield.com/standards/aws-d1-1/"},{"name":"IEEE 1100","org":"IEEE","slug":"ieee-1100","trade":"","guides":["data-center-grounding-signal-reference-grid","grounding-vs-bonding-explained","isolated-ground-receptacle-sensitive-equipment","pdu-rpp-commissioning"],"url":"https://anvilfield.com/standards/ieee-1100/"},{"name":"IEEE 1184","org":"IEEE","slug":"ieee-1184","trade":"","guides":["battery-room-ventilation-hydrogen-safety","data-center-battery-energy-storage-types","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/ieee-1184/"},{"name":"IEEE 1188","org":"IEEE","slug":"ieee-1188","trade":"","guides":["data-center-battery-energy-storage-types","data-center-battery-monitoring-system-vrla-lithium","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/ieee-1188/"},{"name":"IEEE 1547","org":"IEEE","slug":"ieee-1547","trade":"","guides":["bess-commissioning-punch-list","data-center-grid-flexibility-demand-response","data-center-onsite-generation-fuel-cell-microgrid","electrical-generator-paralleling-synchronization"],"url":"https://anvilfield.com/standards/ieee-1547/"},{"name":"IEEE 400","org":"IEEE","slug":"ieee-400","trade":"","guides":["electrical-cable-fault-locating-tdr","electrical-insulation-resistance-megger-testing","medium-voltage-cable-termination-splicing","mv-cable-termination-testing"],"url":"https://anvilfield.com/standards/ieee-400/"},{"name":"IICRC S520","org":"IICRC","slug":"iicrc-s520","trade":"","guides":["fire-smoke-damage-restoration-iicrc-s700","mold-remediation-iaq-iicrc-s520","water-damage-mitigation-structural-drying","water-damage-restoration-mitigation-iicrc-s500"],"url":"https://anvilfield.com/standards/iicrc-s520/"},{"name":"ISO/IEC 11801","org":"Standards body","slug":"iso-iec-11801","trade":"","guides":["copper-cat6a-certification","data-center-fiber-cabling-types-singlemode-multimode","datacenter-structured-cabling-overview","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/iso-iec-11801/"},{"name":"NFPA 2001","org":"National Fire Protection Association","slug":"nfpa-2001","trade":"","guides":["aspirating-smoke-detection-vesda","clean-agent-suppression-room-integrity","data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview"],"url":"https://anvilfield.com/standards/nfpa-2001/"},{"name":"NFPA 30","org":"National Fire Protection Association","slug":"nfpa-30","trade":"","guides":["data-center-two-phase-cooling","fuel-storage-tank-ust-ast-systems","generator-fuel-system-day-tank","immersion-cooling-tank-acceptance"],"url":"https://anvilfield.com/standards/nfpa-30/"},{"name":"NFPA 90A","org":"National Fire Protection Association","slug":"nfpa-90a","trade":"","guides":["ductwork-types-sheet-metal-flex-ductboard","fire-alarm-system-installation-testing","hvac-duct-insulation-wrap-liner","rooftop-unit-rtu-installation-startup"],"url":"https://anvilfield.com/standards/nfpa-90a/"},{"name":"UL 1479","org":"Underwriters Laboratories","slug":"ul-1479","trade":"","guides":["cabling-pathways-firestop","drywall-gypsum-board-finishing","pipe-penetration-firestop-sleeves","structural-fireproofing-sfrm-intumescent"],"url":"https://anvilfield.com/standards/ul-1479/"},{"name":"UL 1741","org":"Underwriters Laboratories","slug":"ul-1741","trade":"","guides":["data-center-grid-flexibility-demand-response","data-center-onsite-generation-fuel-cell-microgrid","photovoltaic-pv-system-wiring-nec-690","pv-rapid-shutdown-690-12"],"url":"https://anvilfield.com/standards/ul-1741/"},{"name":"UL 489","org":"Underwriters Laboratories","slug":"ul-489","trade":"","guides":["control-panel-ul508a-sccr-build","distribution-equipment-switchgear-switchboard-panelboard","overcurrent-protection-breakers-fuses","short-circuit-available-fault-current-study"],"url":"https://anvilfield.com/standards/ul-489/"},{"name":"ACI 224","org":"American Concrete Institute","slug":"aci-224","trade":"","guides":["concrete-crack-types-causes-prevention","construction-control-joint-layout","epoxy-crack-injection-structural-repair"],"url":"https://anvilfield.com/standards/aci-224/"},{"name":"ACI 347","org":"American Concrete Institute","slug":"aci-347","trade":"","guides":["concrete-formwork-shoring-reshoring","concrete-formwork-types-systems","self-consolidating-concrete-scc"],"url":"https://anvilfield.com/standards/aci-347/"},{"name":"ACI 522","org":"American Concrete Institute","slug":"aci-522","trade":"","guides":["permeable-porous-pavement-install","pervious-concrete-installation","porous-permeable-pavement"],"url":"https://anvilfield.com/standards/aci-522/"},{"name":"ACI 546","org":"American Concrete Institute","slug":"aci-546","trade":"","guides":["concrete-repair-spall-restoration","epoxy-crack-injection-structural-repair","parking-structure-restoration-repair"],"url":"https://anvilfield.com/standards/aci-546/"},{"name":"ANSI Z133","org":"ANSI","slug":"ansi-z133","trade":"","guides":["tree-cabling-bracing-structural-support","tree-pruning-maintenance-ansi-a300","tree-removal-stump-grinding"],"url":"https://anvilfield.com/standards/ansi-z133/"},{"name":"ASHRAE 111","org":"ASHRAE","slug":"ashrae-111","trade":"","guides":["air-balancing-report-procedure","hydronic-system-balancing","vav-box-commissioning-airflow"],"url":"https://anvilfield.com/standards/ashrae-111/"},{"name":"ASHRAE Guideline 12","org":"ASHRAE","slug":"ashrae-guideline-12","trade":"","guides":["thermostatic-mixing-valve-scald-legionella","water-heater-recirculation-sizing","water-heater-sizing-selection"],"url":"https://anvilfield.com/standards/ashrae-guideline-12/"},{"name":"ASHRAE Guideline 21","org":"ASHRAE","slug":"ashrae-guideline-21","trade":"","guides":["battery-room-ventilation-hydrogen-safety","data-center-battery-energy-storage-types","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/ashrae-guideline-21/"},{"name":"ASME B30","org":"ASME","slug":"asme-b30","trade":"","guides":["concrete-pumping-placement-boom-line","crane-rigging-signals-safety","structural-steel-erection-connections"],"url":"https://anvilfield.com/standards/asme-b30/"},{"name":"ASTM A615","org":"ASTM International","slug":"astm-a615","trade":"","guides":["masonry-brick-block-cmu-construction","rebar-detailing-bar-bending-schedule","rebar-placement-cover-inspection"],"url":"https://anvilfield.com/standards/astm-a615/"},{"name":"ASTM C1153","org":"ASTM International","slug":"astm-c1153","trade":"","guides":["drone-uav-roof-facade-inspection","roof-asset-management-capital-planning","roof-inspection-maintenance-program"],"url":"https://anvilfield.com/standards/astm-c1153/"},{"name":"ASTM C1315","org":"ASTM International","slug":"astm-c1315","trade":"","guides":["concrete-curing-methods-protection","concrete-sealers-coatings-protection","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/astm-c1315/"},{"name":"ASTM C1611","org":"ASTM International","slug":"astm-c1611","trade":"","guides":["concrete-mix-design-water-cement-ratio","concrete-slump-test","self-consolidating-concrete-scc"],"url":"https://anvilfield.com/standards/astm-c1611/"},{"name":"ASTM C1701","org":"ASTM International","slug":"astm-c1701","trade":"","guides":["permeable-porous-pavement-install","pervious-concrete-installation","porous-permeable-pavement"],"url":"https://anvilfield.com/standards/astm-c1701/"},{"name":"ASTM C1782","org":"ASTM International","slug":"astm-c1782","trade":"","guides":["hardscape-drainage-patio-retaining","paver-hardscape-patio-walkway-installation","paver-layout-field-border"],"url":"https://anvilfield.com/standards/astm-c1782/"},{"name":"ASTM C270","org":"ASTM International","slug":"astm-c270","trade":"","guides":["concrete-masonry-cmu-block-wall-construction","masonry-brick-block-cmu-construction","masonry-repointing-tuckpointing-restoration"],"url":"https://anvilfield.com/standards/astm-c270/"},{"name":"ASTM C33","org":"ASTM International","slug":"astm-c33","trade":"","guides":["concrete-mix-design-water-cement-ratio","paver-hardscape-patio-walkway-installation","paver-layout-field-border"],"url":"https://anvilfield.com/standards/astm-c33/"},{"name":"ASTM C42","org":"ASTM International","slug":"astm-c42","trade":"","guides":["concrete-strength-testing-cylinders","datacenter-concrete-steel-qa-overview","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/astm-c42/"},{"name":"ASTM C476","org":"ASTM International","slug":"astm-c476","trade":"","guides":["concrete-grout-types-baseplate-grouting","concrete-masonry-cmu-block-wall-construction","masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/astm-c476/"},{"name":"ASTM C494","org":"ASTM International","slug":"astm-c494","trade":"","guides":["concrete-admixtures-types-guide","concrete-mix-design-water-cement-ratio","hot-weather-concreting-protection"],"url":"https://anvilfield.com/standards/astm-c494/"},{"name":"ASTM C876","org":"ASTM International","slug":"astm-c876","trade":"","guides":["concrete-repair-spall-restoration","parking-structure-restoration-repair","rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/astm-c876/"},{"name":"ASTM C936","org":"ASTM International","slug":"astm-c936","trade":"","guides":["hardscape-drainage-patio-retaining","paver-hardscape-patio-walkway-installation","paver-layout-field-border"],"url":"https://anvilfield.com/standards/astm-c936/"},{"name":"ASTM D1557","org":"ASTM International","slug":"astm-d1557","trade":"","guides":["landscape-site-grading-earthwork","pavement-base-subgrade-compaction","paver-hardscape-patio-walkway-installation"],"url":"https://anvilfield.com/standards/astm-d1557/"},{"name":"ASTM D4637","org":"ASTM International","slug":"astm-d4637","trade":"","guides":["epdm-rubber-roof-installation","low-slope-membrane-selection-tpo-epdm-pvc","single-ply-membrane-seam-qa"],"url":"https://anvilfield.com/standards/astm-d4637/"},{"name":"ASTM D6083","org":"ASTM International","slug":"astm-d6083","trade":"","guides":["low-slope-roof-coating-restoration-system","roof-coating-mil-thickness-yield","spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/astm-d6083/"},{"name":"ASTM D6694","org":"ASTM International","slug":"astm-d6694","trade":"","guides":["low-slope-roof-coating-restoration-system","roof-coating-mil-thickness-yield","spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/astm-d6694/"},{"name":"ASTM D698","org":"ASTM International","slug":"astm-d698","trade":"","guides":["landscape-site-grading-earthwork","pavement-base-subgrade-compaction","paver-hardscape-patio-walkway-installation"],"url":"https://anvilfield.com/standards/astm-d698/"},{"name":"ASTM E119","org":"ASTM International","slug":"astm-e119","trade":"","guides":["drywall-gypsum-board-finishing","spray-polyurethane-foam-spf-roof","structural-fireproofing-sfrm-intumescent"],"url":"https://anvilfield.com/standards/astm-e119/"},{"name":"ASTM E2174","org":"ASTM International","slug":"astm-e2174","trade":"","guides":["cabling-pathways-firestop","datacenter-fire-life-safety-overview","pipe-penetration-firestop-sleeves"],"url":"https://anvilfield.com/standards/astm-e2174/"},{"name":"ASTM E2393","org":"ASTM International","slug":"astm-e2393","trade":"","guides":["cabling-pathways-firestop","datacenter-fire-life-safety-overview","pipe-penetration-firestop-sleeves"],"url":"https://anvilfield.com/standards/astm-e2393/"},{"name":"ASTM F2200","org":"ASTM International","slug":"astm-f2200","trade":"","guides":["automatic-gate-operator-installation","commercial-fence-gate-installation","overhead-door-dock-leveler-installation"],"url":"https://anvilfield.com/standards/astm-f2200/"},{"name":"IEEE 1106","org":"IEEE","slug":"ieee-1106","trade":"","guides":["data-center-battery-monitoring-system-vrla-lithium","ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/ieee-1106/"},{"name":"IEEE 1635","org":"IEEE","slug":"ieee-1635","trade":"","guides":["battery-room-ventilation-hydrogen-safety","data-center-battery-energy-storage-types","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/ieee-1635/"},{"name":"IEEE 242","org":"IEEE","slug":"ieee-242","trade":"","guides":["protective-relay-coordination-study","selective-coordination-overcurrent","short-circuit-available-fault-current-study"],"url":"https://anvilfield.com/standards/ieee-242/"},{"name":"IEEE 400.2","org":"IEEE","slug":"ieee-400-2","trade":"","guides":["electrical-cable-fault-locating-tdr","medium-voltage-cable-termination-splicing","mv-cable-termination-testing"],"url":"https://anvilfield.com/standards/ieee-400-2/"},{"name":"IEEE 450","org":"IEEE","slug":"ieee-450","trade":"","guides":["data-center-battery-energy-storage-types","data-center-battery-monitoring-system-vrla-lithium","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/ieee-450/"},{"name":"IEEE 519","org":"IEEE","slug":"ieee-519","trade":"","guides":["harmonics-power-quality-mitigation","power-factor-correction-capacitor-bank","vfd-variable-frequency-drive-install"],"url":"https://anvilfield.com/standards/ieee-519/"},{"name":"IEEE 81","org":"IEEE","slug":"ieee-81","trade":"","guides":["electrical-grounding-system-testing-soil-resistivity","ground-resistance-bonding-testing","ground-ring-electrode-nec-250-52"],"url":"https://anvilfield.com/standards/ieee-81/"},{"name":"ISO 19650","org":"Standards body","slug":"iso-19650","trade":"","guides":["bim-vdc-coordination-clash-detection","construction-document-control-drawings","digital-twin-facility-operations"],"url":"https://anvilfield.com/standards/iso-19650/"},{"name":"ISO 8528","org":"Standards body","slug":"iso-8528","trade":"","guides":["data-center-generator-sizing-selection","data-center-onsite-generation-fuel-cell-microgrid","electrical-generator-load-bank-testing"],"url":"https://anvilfield.com/standards/iso-8528/"},{"name":"ISO/IEC 14763","org":"Standards body","slug":"iso-iec-14763","trade":"","guides":["fiber-otdr-bidirectional-certification","fiber-splice-loss-budget","tia-606-labeling-administration"],"url":"https://anvilfield.com/standards/iso-iec-14763/"},{"name":"NFPA 1","org":"National Fire Protection Association","slug":"nfpa-1","trade":"","guides":["battery-room-ventilation-hydrogen-safety","fire-watch-patrol-impairment","outdoor-fire-feature-pit-fireplace"],"url":"https://anvilfield.com/standards/nfpa-1/"},{"name":"NFPA 10","org":"National Fire Protection Association","slug":"nfpa-10","trade":"","guides":["fire-extinguisher-use-classes-pass","kitchen-exhaust-grease-duct-nfpa96","kitchen-hood-suppression-semiannual"],"url":"https://anvilfield.com/standards/nfpa-10/"},{"name":"NFPA 20","org":"National Fire Protection Association","slug":"nfpa-20","trade":"","guides":["fire-pump-acceptance-test","fire-pump-standpipe-system-design","fire-sprinkler-system-design-nfpa13"],"url":"https://anvilfield.com/standards/nfpa-20/"},{"name":"NFPA 58","org":"National Fire Protection Association","slug":"nfpa-58","trade":"","guides":["outdoor-fire-feature-pit-fireplace","outdoor-kitchen-construction-installation","propane-lp-gas-system-install"],"url":"https://anvilfield.com/standards/nfpa-58/"},{"name":"NFPA 68","org":"National Fire Protection Association","slug":"nfpa-68","trade":"","guides":["battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","lithium-ion-battery-thermal-runaway-safety"],"url":"https://anvilfield.com/standards/nfpa-68/"},{"name":"NFPA 69","org":"National Fire Protection Association","slug":"nfpa-69","trade":"","guides":["battery-energy-storage-system-bess-nec-706","battery-room-ventilation-hydrogen-safety","lithium-ion-battery-thermal-runaway-safety"],"url":"https://anvilfield.com/standards/nfpa-69/"},{"name":"NFPA 80","org":"National Fire Protection Association","slug":"nfpa-80","trade":"","guides":["data-center-physical-security-access-control","fire-smoke-damper-installation-testing","overhead-door-dock-leveler-installation"],"url":"https://anvilfield.com/standards/nfpa-80/"},{"name":"Tier I","org":"Standards body","slug":"tier-i","trade":"","guides":["data-center-tier-classification-uptime","data-center-types-enterprise-colo-hyperscale-edge","liquid-cooling-redundancy-concurrent-maintenance"],"url":"https://anvilfield.com/standards/tier-i/"},{"name":"UL 1008","org":"Underwriters Laboratories","slug":"ul-1008","trade":"","guides":["automatic-transfer-switch-commissioning","emergency-standby-power-systems-nec-700","standby-generator-ats-installation"],"url":"https://anvilfield.com/standards/ul-1008/"},{"name":"UL 1449","org":"Underwriters Laboratories","slug":"ul-1449","trade":"","guides":["data-center-grounding-signal-reference-grid","electrical-surge-protection-spd-types-nec","surge-protection-spd-installation"],"url":"https://anvilfield.com/standards/ul-1449/"},{"name":"UL 181A","org":"Underwriters Laboratories","slug":"ul-181a","trade":"","guides":["duct-leakage-testing-sealing","ductwork-types-sheet-metal-flex-ductboard","sheet-metal-duct-fabrication-installation"],"url":"https://anvilfield.com/standards/ul-181a/"},{"name":"UL 1973","org":"Underwriters Laboratories","slug":"ul-1973","trade":"","guides":["data-center-battery-energy-storage-types","lithium-ion-battery-thermal-runaway-safety","rack-bbu-energy-storage-ride-through"],"url":"https://anvilfield.com/standards/ul-1973/"},{"name":"UL 325","org":"Underwriters Laboratories","slug":"ul-325","trade":"","guides":["automatic-gate-operator-installation","commercial-fence-gate-installation","overhead-door-dock-leveler-installation"],"url":"https://anvilfield.com/standards/ul-325/"},{"name":"UL 467","org":"Underwriters Laboratories","slug":"ul-467","trade":"","guides":["ground-ring-electrode-nec-250-52","grounding-electrode-system-bonding","ufer-concrete-encased-grounding-electrode"],"url":"https://anvilfield.com/standards/ul-467/"},{"name":"40 CFR 112","org":"U.S. EPA","slug":"","trade":"","guides":["fuel-storage-tank-ust-ast-systems","generator-fuel-system-day-tank"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 211","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio","mass-concrete-thermal-control-cracking"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 304","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-placement-consolidation-vibration","concrete-pumping-placement-boom-line"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 325","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-pavement-jointing-curing","concrete-pavement-types-jpcp-crcp"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 506","org":"American Concrete Institute","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use","shotcrete-gunite-application"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 562","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-repair-spall-restoration","parking-structure-restoration-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118.10","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation","shower-pan-wet-area-waterproofing"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118.12","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation","shower-pan-wet-area-waterproofing"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI C12.20","org":"ANSI","slug":"","trade":"","guides":["electrical-submetering-energy-monitoring","epms-power-monitoring-metering"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z97.1","org":"ANSI","slug":"","trade":"","guides":["window-film-tint-safety-security-solar","window-glass-replacement-glazing-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ASCE 7-22","org":"American Society of Civil Engineers","slug":"","trade":"","guides":["pergola-gazebo-shade-structure-construction","snow-guard-retention-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 135","org":"ASHRAE","slug":"","trade":"","guides":["bms-ddc-controls-commissioning","hvac-bas-ddc-controls-fundamentals"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 170","org":"ASHRAE","slug":"","trade":"","guides":["building-pressurization-control-makeup-air","healthcare-hospital-hvac-ventilation-ashrae-170"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 180","org":"ASHRAE","slug":"","trade":"","guides":["hvac-preventive-maintenance-program","hydronic-makeup-water-glycol-treatment"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 241","org":"ASHRAE","slug":"","trade":"","guides":["air-filtration-merv-iaq","indoor-air-quality-monitoring-sensors"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 62.2","org":"ASHRAE","slug":"","trade":"","guides":["building-insulation-air-sealing-envelope","hvac-ventilation-rate-outdoor-air-ashrae-62"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE Guideline 1.1","org":"ASHRAE","slug":"","trade":"","guides":["data-center-commissioning-levels-process","datacenter-commissioning-operations-overview"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A153","org":"ASTM International","slug":"","trade":"","guides":["wood-composite-deck-construction","wood-shake-shingle-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A706","org":"ASTM International","slug":"","trade":"","guides":["rebar-detailing-bar-bending-schedule","rebar-placement-cover-inspection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A775","org":"ASTM International","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized","rebar-placement-cover-inspection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM B88","org":"ASTM International","slug":"","trade":"","guides":["pex-copper-cpvc-piping-methods","pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1090","org":"ASTM International","slug":"","trade":"","guides":["anchor-bolt-baseplate-grout-qa","concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1107","org":"ASTM International","slug":"","trade":"","guides":["anchor-bolt-baseplate-grout-qa","concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1231","org":"ASTM International","slug":"","trade":"","guides":["concrete-strength-testing-cylinders","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1289","org":"ASTM International","slug":"","trade":"","guides":["building-insulation-air-sealing-envelope","roof-insulation-cover-board-attachment"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1579","org":"ASTM International","slug":"","trade":"","guides":["concrete-evaporation-rate-plastic-cracking","fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1781","org":"ASTM International","slug":"","trade":"","guides":["permeable-porous-pavement-install","porous-permeable-pavement"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C578","org":"ASTM International","slug":"","trade":"","guides":["building-insulation-air-sealing-envelope","roof-insulation-cover-board-attachment"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C617","org":"ASTM International","slug":"","trade":"","guides":["concrete-strength-testing-cylinders","slab-strength-acceptance-cylinders"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C827","org":"ASTM International","slug":"","trade":"","guides":["anchor-bolt-baseplate-grout-qa","concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C90","org":"ASTM International","slug":"","trade":"","guides":["concrete-masonry-cmu-block-wall-construction","masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C979","org":"ASTM International","slug":"","trade":"","guides":["concrete-coloring-staining-decorative","stamped-decorative-concrete-install"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D08","org":"ASTM International","slug":"","trade":"","guides":["low-slope-roof-coating-restoration-system","metal-roof-restoration-coating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1143","org":"ASTM International","slug":"","trade":"","guides":["drilled-pier-caisson-deep-foundations","driven-pile-foundations-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1970","org":"ASTM International","slug":"","trade":"","guides":["roofing-underlayment-types-felt-synthetic","steep-slope-asphalt-shingle-roofing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2726","org":"ASTM International","slug":"","trade":"","guides":["asphalt-density-compaction-testing","asphalt-paving-inspection-quality-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3034","org":"ASTM International","slug":"","trade":"","guides":["sanitary-building-sewer-lateral-connection","subsurface-drainage-french-drain-catch-basin"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4414","org":"ASTM International","slug":"","trade":"","guides":["roof-coating-mil-thickness-yield","spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4434","org":"ASTM International","slug":"","trade":"","guides":["low-slope-membrane-selection-tpo-epdm-pvc","single-ply-membrane-seam-qa"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4580","org":"ASTM International","slug":"","trade":"","guides":["concrete-repair-spall-restoration","parking-structure-restoration-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4869","org":"ASTM International","slug":"","trade":"","guides":["roofing-underlayment-types-felt-synthetic","wood-shake-shingle-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D5957","org":"ASTM International","slug":"","trade":"","guides":["blue-roof-controlled-flow-drainage","vegetative-green-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6690","org":"ASTM International","slug":"","trade":"","guides":["pavement-preservation-treatments-overview","sealcoat-crack-seal-maintenance"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6878","org":"ASTM International","slug":"","trade":"","guides":["low-slope-membrane-selection-tpo-epdm-pvc","single-ply-membrane-seam-qa"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D8231","org":"ASTM International","slug":"","trade":"","guides":["ballasted-roof-system-installation","electronic-leak-detection-survey"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D8257","org":"ASTM International","slug":"","trade":"","guides":["roofing-underlayment-types-felt-synthetic","steep-slope-asphalt-shingle-roofing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D979","org":"ASTM International","slug":"","trade":"","guides":["asphalt-density-compaction-testing","asphalt-paving-inspection-quality-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E108","org":"ASTM International","slug":"","trade":"","guides":["spray-polyurethane-foam-spf-roof","wood-shake-shingle-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1592","org":"ASTM International","slug":"","trade":"","guides":["metal-roof-types-comparison","standing-seam-metal-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2178","org":"ASTM International","slug":"","trade":"","guides":["building-insulation-air-sealing-envelope","roof-vapor-retarder-air-barrier"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2400","org":"ASTM International","slug":"","trade":"","guides":["vegetative-green-roof-installation","vegetative-green-roof-maintenance-program"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E84","org":"ASTM International","slug":"","trade":"","guides":["pipe-insulation-condensation-control","spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E96","org":"ASTM International","slug":"","trade":"","guides":["building-insulation-air-sealing-envelope","roof-vapor-retarder-air-barrier"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2656","org":"ASTM International","slug":"","trade":"","guides":["commercial-fence-gate-installation","data-center-physical-security-access-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F3125","org":"ASTM International","slug":"","trade":"","guides":["high-strength-bolting-rcsc","structural-steel-erection-connections"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F876","org":"ASTM International","slug":"","trade":"","guides":["pex-copper-cpvc-piping-methods","radiant-floor-hydronic-heating-design"],"url":"https://anvilfield.com/standards/"},{"name":"AWS D1.4","org":"American Welding Society","slug":"","trade":"","guides":["precast-concrete-erection-connections","rebar-placement-cover-inspection"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C651","org":"American Water Works Association","slug":"","trade":"","guides":["domestic-water-service-meter-tap","potable-water-disinfection-flushing-chlorination"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C652","org":"American Water Works Association","slug":"","trade":"","guides":["potable-water-disinfection-flushing-chlorination","storage-tank-coating-lining-interior"],"url":"https://anvilfield.com/standards/"},{"name":"ICC-ES AC308","org":"ICC Evaluation Service","slug":"","trade":"","guides":["adhesive-epoxy-anchor-installation","anchor-bolt-baseplate-grout-qa"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1159","org":"IEEE","slug":"","trade":"","guides":["epms-power-monitoring-metering","harmonics-power-quality-mitigation"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1187","org":"IEEE","slug":"","trade":"","guides":["data-center-battery-energy-storage-types","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1679","org":"IEEE","slug":"","trade":"","guides":["ups-battery-maintenance-testing","ups-sts-commissioning-hold-points"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 386","org":"IEEE","slug":"","trade":"","guides":["medium-voltage-cable-termination-splicing","mv-cable-termination-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 43","org":"IEEE","slug":"","trade":"","guides":["bess-commissioning-punch-list","electrical-insulation-resistance-megger-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 48","org":"IEEE","slug":"","trade":"","guides":["medium-voltage-cable-termination-splicing","mv-cable-termination-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 484","org":"IEEE","slug":"","trade":"","guides":["data-center-battery-energy-storage-types","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 485","org":"IEEE","slug":"","trade":"","guides":["data-center-battery-energy-storage-types","ups-battery-maintenance-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 80","org":"IEEE","slug":"","trade":"","guides":["data-center-grounding-signal-reference-grid","ground-resistance-bonding-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 802","org":"IEEE","slug":"","trade":"","guides":["data-center-interconnect-dci-transport","poe-voltage-drop-and-heat-quick-check"],"url":"https://anvilfield.com/standards/"},{"name":"IICRC S700","org":"IICRC","slug":"","trade":"","guides":["fire-smoke-damage-odor-restoration","fire-smoke-damage-restoration-iicrc-s700"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 10816","org":"Standards body","slug":"","trade":"","guides":["motor-bearing-lubrication-shaft-grounding","predictive-maintenance-condition-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 14644","org":"Standards body","slug":"","trade":"","guides":["cleanroom-hvac-contamination-control","data-center-zinc-whiskers-contamination-control"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 16890","org":"Standards body","slug":"","trade":"","guides":["air-filtration-merv-iaq","air-handling-unit-ahu-components-operation"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 18436","org":"Standards body","slug":"","trade":"","guides":["infrared-thermography-inspection","predictive-maintenance-condition-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 20816","org":"Standards body","slug":"","trade":"","guides":["motor-bearing-lubrication-shaft-grounding","predictive-maintenance-condition-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 27001","org":"Standards body","slug":"","trade":"","guides":["colocation-cage-cabinet-fit-out","data-center-physical-security-access-control"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 17A","org":"National Fire Protection Association","slug":"","trade":"","guides":["kitchen-exhaust-grease-duct-nfpa96","kitchen-hood-suppression-semiannual"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 241","org":"National Fire Protection Association","slug":"","trade":"","guides":["datacenter-fire-life-safety-overview","fire-watch-patrol-impairment"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 51B","org":"National Fire Protection Association","slug":"","trade":"","guides":["fire-watch-patrol-impairment","hot-work-permit-fire-safety-nfpa-51b"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 55","org":"National Fire Protection Association","slug":"","trade":"","guides":["compressed-gas-cylinder-safety-handling","medical-gas-piping-install-certification"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 750","org":"National Fire Protection Association","slug":"","trade":"","guides":["data-center-fire-suppression-systems-comparison","datacenter-fire-life-safety-overview"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 79","org":"National Fire Protection Association","slug":"","trade":"","guides":["control-panel-ul508a-sccr-build","electrical-surge-protection-spd-types-nec"],"url":"https://anvilfield.com/standards/"},{"name":"TMS 402","org":"The Masonry Society","slug":"","trade":"","guides":["concrete-masonry-cmu-block-wall-construction","masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"TMS 602","org":"The Masonry Society","slug":"","trade":"","guides":["concrete-masonry-cmu-block-wall-construction","masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"Tier II","org":"Standards body","slug":"","trade":"","guides":["data-center-tier-classification-uptime","liquid-cooling-redundancy-concurrent-maintenance"],"url":"https://anvilfield.com/standards/"},{"name":"UL 142","org":"Underwriters Laboratories","slug":"","trade":"","guides":["fuel-storage-tank-ust-ast-systems","generator-fuel-system-day-tank"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1561","org":"Underwriters Laboratories","slug":"","trade":"","guides":["dry-type-transformer-sizing-installation","harmonics-power-quality-mitigation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1699","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-device-wiring-receptacles-switches","gfci-afci-protection-nec"],"url":"https://anvilfield.com/standards/"},{"name":"UL 181","org":"Underwriters Laboratories","slug":"","trade":"","guides":["ductwork-types-sheet-metal-flex-ductboard","hvac-duct-insulation-wrap-liner"],"url":"https://anvilfield.com/standards/"},{"name":"UL 181B","org":"Underwriters Laboratories","slug":"","trade":"","guides":["duct-leakage-testing-sealing","ductwork-types-sheet-metal-flex-ductboard"],"url":"https://anvilfield.com/standards/"},{"name":"UL 2085","org":"Underwriters Laboratories","slug":"","trade":"","guides":["fuel-storage-tank-ust-ast-systems","generator-fuel-system-day-tank"],"url":"https://anvilfield.com/standards/"},{"name":"UL 248","org":"Underwriters Laboratories","slug":"","trade":"","guides":["control-panel-ul508a-sccr-build","overcurrent-protection-breakers-fuses"],"url":"https://anvilfield.com/standards/"},{"name":"UL 3741","org":"Underwriters Laboratories","slug":"","trade":"","guides":["photovoltaic-pv-system-wiring-nec-690","pv-rapid-shutdown-690-12"],"url":"https://anvilfield.com/standards/"},{"name":"UL 486A","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-splices-terminations-connectors","termination-torque-qa"],"url":"https://anvilfield.com/standards/"},{"name":"UL 486B","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-splices-terminations-connectors","termination-torque-qa"],"url":"https://anvilfield.com/standards/"},{"name":"UL 498","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-device-wiring-receptacles-switches","receptacle-types-nema-configurations"],"url":"https://anvilfield.com/standards/"},{"name":"UL 555","org":"Underwriters Laboratories","slug":"","trade":"","guides":["fire-smoke-damper-installation-testing","sheet-metal-duct-fabrication-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 555S","org":"Underwriters Laboratories","slug":"","trade":"","guides":["fire-smoke-damper-installation-testing","sheet-metal-duct-fabrication-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 580","org":"Underwriters Laboratories","slug":"","trade":"","guides":["metal-roof-types-comparison","standing-seam-metal-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 790","org":"Underwriters Laboratories","slug":"","trade":"","guides":["spray-polyurethane-foam-spf-roof","wood-shake-shingle-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 845","org":"Underwriters Laboratories","slug":"","trade":"","guides":["distribution-equipment-switchgear-switchboard-panelboard","motor-control-center-mcc-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"UL 857","org":"Underwriters Laboratories","slug":"","trade":"","guides":["busway-busduct-installation","busway-receiving-megger-qa"],"url":"https://anvilfield.com/standards/"},{"name":"UL 924","org":"Underwriters Laboratories","slug":"","trade":"","guides":["emergency-egress-lighting-inverter","whitespace-footcandle-verification"],"url":"https://anvilfield.com/standards/"},{"name":"UL 943","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-device-wiring-receptacles-switches","gfci-afci-protection-nec"],"url":"https://anvilfield.com/standards/"},{"name":"40 CFR 273","org":"U.S. EPA","slug":"","trade":"","guides":["led-lighting-retrofit-upgrade"],"url":"https://anvilfield.com/standards/"},{"name":"40 CFR 280","org":"U.S. EPA","slug":"","trade":"","guides":["fuel-storage-tank-ust-ast-systems"],"url":"https://anvilfield.com/standards/"},{"name":"40 CFR 403","org":"U.S. EPA","slug":"","trade":"","guides":["plumbing-special-waste-acid-neutralization"],"url":"https://anvilfield.com/standards/"},{"name":"40 CFR 61","org":"U.S. EPA","slug":"","trade":"","guides":["asbestos-abatement-removal-procedures"],"url":"https://anvilfield.com/standards/"},{"name":"40 CFR 745","org":"U.S. EPA","slug":"","trade":"","guides":["lead-paint-rrp-renovation-safe-work"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 201","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-surface-defects-diagnosis"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 207","org":"American Concrete Institute","slug":"","trade":"","guides":["mass-concrete-thermal-control-cracking"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 213","org":"American Concrete Institute","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 222","org":"American Concrete Institute","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 228","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-scanning-gpr-before-drill"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 229","org":"American Concrete Institute","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 237","org":"American Concrete Institute","slug":"","trade":"","guides":["self-consolidating-concrete-scc"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 309","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-placement-consolidation-vibration"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 310","org":"American Concrete Institute","slug":"","trade":"","guides":["polished-concrete-floor-grind-densify"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 315","org":"American Concrete Institute","slug":"","trade":"","guides":["rebar-detailing-bar-bending-schedule"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 332","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-driveway-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 336","org":"American Concrete Institute","slug":"","trade":"","guides":["drilled-pier-caisson-deep-foundations"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 350","org":"American Concrete Institute","slug":"","trade":"","guides":["concrete-waterstop-construction-joint-waterproofing"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 364","org":"American Concrete Institute","slug":"","trade":"","guides":["parking-structure-restoration-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 423","org":"American Concrete Institute","slug":"","trade":"","guides":["post-tension-slab-stressing"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 544","org":"American Concrete Institute","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ACI 551","org":"American Concrete Institute","slug":"","trade":"","guides":["tilt-up-panel-bracing-erection"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A108","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A108.02","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A112.19","org":"ANSI","slug":"","trade":"","guides":["swimming-pool-spa-mechanical-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118.3","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118.4","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A118.6","org":"ANSI","slug":"","trade":"","guides":["ceramic-porcelain-tile-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A137.1","org":"ANSI","slug":"","trade":"","guides":["terrazzo-flooring-installation-polishing"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A14","org":"ANSI","slug":"","trade":"","guides":["ladder-safety-portable-osha"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A326.3","org":"ANSI","slug":"","trade":"","guides":["concrete-sealers-coatings-protection"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A92","org":"ANSI","slug":"","trade":"","guides":["aerial-lift-mewp-safety"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A92.22","org":"ANSI","slug":"","trade":"","guides":["aerial-lift-mewp-safety"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI A92.24","org":"ANSI","slug":"","trade":"","guides":["aerial-lift-mewp-safety"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI C12.1","org":"ANSI","slug":"","trade":"","guides":["epms-power-monitoring-metering"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI C84.1","org":"ANSI","slug":"","trade":"","guides":["three-phase-power-wye-delta-field-guide"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Y32.2","org":"ANSI","slug":"","trade":"","guides":["electrical-one-line-diagram-reading-symbols"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z21.22","org":"ANSI","slug":"","trade":"","guides":["thermal-expansion-tank-closed-system"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z21.69","org":"ANSI","slug":"","trade":"","guides":["commercial-kitchen-equipment-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z21.97","org":"ANSI","slug":"","trade":"","guides":["outdoor-fire-feature-pit-fireplace"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z359","org":"ANSI","slug":"","trade":"","guides":["rooftop-permanent-fall-protection-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z83.19","org":"ANSI","slug":"","trade":"","guides":["hvac-infrared-radiant-tube-heater"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z83.20","org":"ANSI","slug":"","trade":"","guides":["hvac-infrared-radiant-tube-heater"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z83.8","org":"ANSI","slug":"","trade":"","guides":["hvac-unit-heater-gas-electric"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z87","org":"ANSI","slug":"","trade":"","guides":["ppe-hazard-assessment-selection"],"url":"https://anvilfield.com/standards/"},{"name":"ANSI Z89.1","org":"ANSI","slug":"","trade":"","guides":["tree-removal-stump-grinding"],"url":"https://anvilfield.com/standards/"},{"name":"ASCE 7-10","org":"American Society of Civil Engineers","slug":"","trade":"","guides":["edge-metal-coping-wind-design"],"url":"https://anvilfield.com/standards/"},{"name":"ASCE 7-16","org":"American Society of Civil Engineers","slug":"","trade":"","guides":["edge-metal-coping-wind-design"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 110","org":"ASHRAE","slug":"","trade":"","guides":["laboratory-fume-hood-exhaust-ventilation"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 169","org":"ASHRAE","slug":"","trade":"","guides":["data-center-free-cooling-economizer"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 189.1","org":"ASHRAE","slug":"","trade":"","guides":["dedicated-outdoor-air-system-doas"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 200","org":"ASHRAE","slug":"","trade":"","guides":["chilled-beam-active-passive-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 211","org":"ASHRAE","slug":"","trade":"","guides":["energy-audit-management-program"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 223","org":"ASHRAE","slug":"","trade":"","guides":["building-automation-fault-detection-diagnostics"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 52.2","org":"ASHRAE","slug":"","trade":"","guides":["air-filtration-merv-iaq"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE 84","org":"ASHRAE","slug":"","trade":"","guides":["energy-recovery-ventilator-erv-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE Guideline 0.2","org":"ASHRAE","slug":"","trade":"","guides":["datacenter-commissioning-operations-overview"],"url":"https://anvilfield.com/standards/"},{"name":"ASHRAE TC9.9","org":"ASHRAE","slug":"","trade":"","guides":["data-center-zinc-whiskers-contamination-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASME A17","org":"ASME","slug":"","trade":"","guides":["elevator-modernization-maintenance"],"url":"https://anvilfield.com/standards/"},{"name":"ASME B16","org":"ASME","slug":"","trade":"","guides":["plumbing-valve-types-selection-isolation"],"url":"https://anvilfield.com/standards/"},{"name":"ASME B20","org":"ASME","slug":"","trade":"","guides":["conveyor-material-handling-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A1034","org":"ASTM International","slug":"","trade":"","guides":["rebar-mechanical-splices-couplers"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A123","org":"ASTM International","slug":"","trade":"","guides":["helical-pier-screw-pile-foundations"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A416","org":"ASTM International","slug":"","trade":"","guides":["post-tension-slab-stressing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A6","org":"ASTM International","slug":"","trade":"","guides":["structural-steel-erection-connections"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A74","org":"ASTM International","slug":"","trade":"","guides":["sanitary-building-sewer-lateral-connection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A767","org":"ASTM International","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A934","org":"ASTM International","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM A955","org":"ASTM International","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM B819","org":"ASTM International","slug":"","trade":"","guides":["medical-gas-piping-install-certification"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1017","org":"ASTM International","slug":"","trade":"","guides":["concrete-admixtures-types-guide"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1019","org":"ASTM International","slug":"","trade":"","guides":["masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1029","org":"ASTM International","slug":"","trade":"","guides":["spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1063","org":"ASTM International","slug":"","trade":"","guides":["stucco-eifs-exterior-wall-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1071","org":"ASTM International","slug":"","trade":"","guides":["hvac-duct-insulation-wrap-liner"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C109","org":"ASTM International","slug":"","trade":"","guides":["concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1116","org":"ASTM International","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1140","org":"ASTM International","slug":"","trade":"","guides":["shotcrete-gunite-application"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1193","org":"ASTM International","slug":"","trade":"","guides":["concrete-joint-sealant-replacement"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1303","org":"ASTM International","slug":"","trade":"","guides":["roof-insulation-cover-board-attachment"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1314","org":"ASTM International","slug":"","trade":"","guides":["masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1371","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1372","org":"ASTM International","slug":"","trade":"","guides":["segmental-retaining-wall-build"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1396","org":"ASTM International","slug":"","trade":"","guides":["drywall-gypsum-board-finishing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1399","org":"ASTM International","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C150","org":"ASTM International","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1549","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1550","org":"ASTM International","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1602","org":"ASTM International","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1604","org":"ASTM International","slug":"","trade":"","guides":["shotcrete-gunite-application"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1609","org":"ASTM International","slug":"","trade":"","guides":["fiber-reinforced-concrete-design-use"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1621","org":"ASTM International","slug":"","trade":"","guides":["self-consolidating-concrete-scc"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1688","org":"ASTM International","slug":"","trade":"","guides":["pervious-concrete-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C171","org":"ASTM International","slug":"","trade":"","guides":["concrete-curing-methods-protection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C1712","org":"ASTM International","slug":"","trade":"","guides":["self-consolidating-concrete-scc"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C216","org":"ASTM International","slug":"","trade":"","guides":["masonry-brick-block-cmu-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C330","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C332","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C406","org":"ASTM International","slug":"","trade":"","guides":["slate-roof-installation-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C495","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C496","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C531","org":"ASTM International","slug":"","trade":"","guides":["concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C533","org":"ASTM International","slug":"","trade":"","guides":["pipe-insulation-condensation-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C534","org":"ASTM International","slug":"","trade":"","guides":["pipe-insulation-condensation-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C547","org":"ASTM International","slug":"","trade":"","guides":["pipe-insulation-condensation-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C552","org":"ASTM International","slug":"","trade":"","guides":["pipe-insulation-condensation-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C567","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C579","org":"ASTM International","slug":"","trade":"","guides":["concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C595","org":"ASTM International","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C618","org":"ASTM International","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C636","org":"ASTM International","slug":"","trade":"","guides":["acoustical-suspended-ceiling-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C796","org":"ASTM International","slug":"","trade":"","guides":["lightweight-concrete-structural-insulating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C803","org":"ASTM International","slug":"","trade":"","guides":["concrete-strength-testing-cylinders"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C805","org":"ASTM International","slug":"","trade":"","guides":["concrete-strength-testing-cylinders"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C840","org":"ASTM International","slug":"","trade":"","guides":["drywall-gypsum-board-finishing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C881","org":"ASTM International","slug":"","trade":"","guides":["epoxy-crack-injection-structural-repair"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C900","org":"ASTM International","slug":"","trade":"","guides":["concrete-strength-testing-cylinders"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C920","org":"ASTM International","slug":"","trade":"","guides":["concrete-joint-sealant-replacement"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C926","org":"ASTM International","slug":"","trade":"","guides":["stucco-eifs-exterior-wall-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C939","org":"ASTM International","slug":"","trade":"","guides":["concrete-grout-types-baseplate-grouting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C957","org":"ASTM International","slug":"","trade":"","guides":["traffic-deck-waterproofing-coating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM C989","org":"ASTM International","slug":"","trade":"","guides":["concrete-mix-design-water-cement-ratio"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1193","org":"ASTM International","slug":"","trade":"","guides":["pure-water-ro-di-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D120","org":"ASTM International","slug":"","trade":"","guides":["arc-flash-ppe-categories-clothing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1533","org":"ASTM International","slug":"","trade":"","guides":["padmount-transformer-receiving-energization"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1556","org":"ASTM International","slug":"","trade":"","guides":["pavement-base-subgrade-compaction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1586","org":"ASTM International","slug":"","trade":"","guides":["ground-improvement-grouting-soil"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D1816","org":"ASTM International","slug":"","trade":"","guides":["padmount-transformer-receiving-energization"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2047","org":"ASTM International","slug":"","trade":"","guides":["terrazzo-flooring-installation-polishing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2172","org":"ASTM International","slug":"","trade":"","guides":["asphalt-recycling-rap-full-depth-reclamation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2564","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2665","org":"ASTM International","slug":"","trade":"","guides":["sanitary-building-sewer-lateral-connection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2842","org":"ASTM International","slug":"","trade":"","guides":["spray-polyurethane-foam-spf-roof"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2855","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D2995","org":"ASTM International","slug":"","trade":"","guides":["fog-seal-rejuvenator-pavement-preservation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3161","org":"ASTM International","slug":"","trade":"","guides":["steep-slope-asphalt-shingle-roofing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3462","org":"ASTM International","slug":"","trade":"","guides":["steep-slope-asphalt-shingle-roofing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3689","org":"ASTM International","slug":"","trade":"","guides":["driven-pile-foundations-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3910","org":"ASTM International","slug":"","trade":"","guides":["slurry-seal-micro-surfacing-treatments"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3963","org":"ASTM International","slug":"","trade":"","guides":["rebar-corrosion-protection-epoxy-galvanized"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D3966","org":"ASTM International","slug":"","trade":"","guides":["driven-pile-foundations-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4263","org":"ASTM International","slug":"","trade":"","guides":["traffic-deck-waterproofing-coating"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4541","org":"ASTM International","slug":"","trade":"","guides":["epoxy-resinous-floor-coating-install"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D4945","org":"ASTM International","slug":"","trade":"","guides":["driven-pile-foundations-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D5340","org":"ASTM International","slug":"","trade":"","guides":["pavement-condition-assessment-pci"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D5778","org":"ASTM International","slug":"","trade":"","guides":["ground-improvement-grouting-soil"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6135","org":"ASTM International","slug":"","trade":"","guides":["below-grade-foundation-waterproofing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6276","org":"ASTM International","slug":"","trade":"","guides":["subgrade-stabilization-lime-cement-geogrid"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6372","org":"ASTM International","slug":"","trade":"","guides":["slurry-seal-micro-surfacing-treatments"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6432","org":"ASTM International","slug":"","trade":"","guides":["concrete-scanning-gpr-before-drill"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6469","org":"ASTM International","slug":"","trade":"","guides":["generator-fuel-system-day-tank"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6757","org":"ASTM International","slug":"","trade":"","guides":["roofing-underlayment-types-felt-synthetic"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D6938","org":"ASTM International","slug":"","trade":"","guides":["pavement-base-subgrade-compaction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D7234","org":"ASTM International","slug":"","trade":"","guides":["epoxy-resinous-floor-coating-install"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D7655","org":"ASTM International","slug":"","trade":"","guides":["ballasted-roof-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D7877","org":"ASTM International","slug":"","trade":"","guides":["electronic-leak-detection-survey"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D877","org":"ASTM International","slug":"","trade":"","guides":["padmount-transformer-receiving-energization"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D924","org":"ASTM International","slug":"","trade":"","guides":["padmount-transformer-receiving-energization"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM D975","org":"ASTM International","slug":"","trade":"","guides":["generator-fuel-system-day-tank"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1105","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1486","org":"ASTM International","slug":"","trade":"","guides":["floor-flatness-levelness-ff-fl"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1512","org":"ASTM International","slug":"","trade":"","guides":["adhesive-epoxy-anchor-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1527","org":"ASTM International","slug":"","trade":"","guides":["data-center-site-selection-criteria"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1643","org":"ASTM International","slug":"","trade":"","guides":["under-slab-vapor-barrier-moisture"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1886","org":"ASTM International","slug":"","trade":"","guides":["window-film-tint-safety-security-solar"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1918","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E1980","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2190","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2307","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2357","org":"ASTM International","slug":"","trade":"","guides":["roof-vapor-retarder-air-barrier"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2397","org":"ASTM International","slug":"","trade":"","guides":["vegetative-green-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2398","org":"ASTM International","slug":"","trade":"","guides":["vegetative-green-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2399","org":"ASTM International","slug":"","trade":"","guides":["vegetative-green-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2556","org":"ASTM International","slug":"","trade":"","guides":["siding-installation-vinyl-fiber-cement"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E2568","org":"ASTM International","slug":"","trade":"","guides":["stucco-eifs-exterior-wall-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E283","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E330","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E331","org":"ASTM International","slug":"","trade":"","guides":["curtain-wall-glazing-storefront-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E408","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E477","org":"ASTM International","slug":"","trade":"","guides":["data-center-noise-acoustics-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E488","org":"ASTM International","slug":"","trade":"","guides":["adhesive-epoxy-anchor-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E580","org":"ASTM International","slug":"","trade":"","guides":["acoustical-suspended-ceiling-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E605","org":"ASTM International","slug":"","trade":"","guides":["structural-fireproofing-sfrm-intumescent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E736","org":"ASTM International","slug":"","trade":"","guides":["structural-fireproofing-sfrm-intumescent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM E903","org":"ASTM International","slug":"","trade":"","guides":["cool-roof-reflectivity-energy"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1216","org":"ASTM International","slug":"","trade":"","guides":["trenchless-sewer-repair-pipe-lining-bursting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1290","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1292","org":"ASTM International","slug":"","trade":"","guides":["playground-equipment-safety-surfacing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1487","org":"ASTM International","slug":"","trade":"","guides":["playground-equipment-safety-surfacing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1506","org":"ASTM International","slug":"","trade":"","guides":["arc-flash-ppe-categories-clothing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1642","org":"ASTM International","slug":"","trade":"","guides":["window-film-tint-safety-security-solar"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1743","org":"ASTM International","slug":"","trade":"","guides":["trenchless-sewer-repair-pipe-lining-bursting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1807","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1815","org":"ASTM International","slug":"","trade":"","guides":["bioretention-rain-garden-stormwater"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1897","org":"ASTM International","slug":"","trade":"","guides":["tree-removal-stump-grinding"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1936","org":"ASTM International","slug":"","trade":"","guides":["athletic-sports-field-turf-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1951","org":"ASTM International","slug":"","trade":"","guides":["playground-equipment-safety-surfacing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1959","org":"ASTM International","slug":"","trade":"","guides":["arc-flash-ppe-categories-clothing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F1960","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2075","org":"ASTM International","slug":"","trade":"","guides":["playground-equipment-safety-surfacing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2098","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2387","org":"ASTM International","slug":"","trade":"","guides":["swimming-pool-spa-mechanical-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2413","org":"ASTM International","slug":"","trade":"","guides":["ppe-hazard-assessment-selection"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2620","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F2659","org":"ASTM International","slug":"","trade":"","guides":["self-leveling-underlayment-floor-prep"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F3010","org":"ASTM International","slug":"","trade":"","guides":["slab-moisture-testing-flooring-rh"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F3016","org":"ASTM International","slug":"","trade":"","guides":["data-center-physical-security-access-control"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F355","org":"ASTM International","slug":"","trade":"","guides":["athletic-sports-field-turf-construction"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F3722","org":"ASTM International","slug":"","trade":"","guides":["plumbing-special-waste-acid-neutralization"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F441","org":"ASTM International","slug":"","trade":"","guides":["pex-copper-cpvc-piping-methods"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F442","org":"ASTM International","slug":"","trade":"","guides":["pex-copper-cpvc-piping-methods"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F48","org":"ASTM International","slug":"","trade":"","guides":["construction-robotics-jobsite-automation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F493","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F496","org":"ASTM International","slug":"","trade":"","guides":["arc-flash-ppe-categories-clothing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F567","org":"ASTM International","slug":"","trade":"","guides":["commercial-fence-gate-installation"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F656","org":"ASTM International","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F696","org":"ASTM International","slug":"","trade":"","guides":["arc-flash-ppe-categories-clothing"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F714","org":"ASTM International","slug":"","trade":"","guides":["trenchless-sewer-repair-pipe-lining-bursting"],"url":"https://anvilfield.com/standards/"},{"name":"ASTM F959","org":"ASTM International","slug":"","trade":"","guides":["high-strength-bolting-rcsc"],"url":"https://anvilfield.com/standards/"},{"name":"AWS A5.8","org":"American Welding Society","slug":"","trade":"","guides":["medical-gas-piping-install-certification"],"url":"https://anvilfield.com/standards/"},{"name":"AWS D1.8","org":"American Welding Society","slug":"","trade":"","guides":["weld-heat-input-cwi-acceptance"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C111","org":"American Water Works Association","slug":"","trade":"","guides":["water-main-thrust-restraint"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C600","org":"American Water Works Association","slug":"","trade":"","guides":["water-main-thrust-restraint"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C606","org":"American Water Works Association","slug":"","trade":"","guides":["pipe-joining-methods-solder-press-solvent"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C655","org":"American Water Works Association","slug":"","trade":"","guides":["potable-water-disinfection-flushing-chlorination"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C700","org":"American Water Works Association","slug":"","trade":"","guides":["domestic-water-service-meter-tap"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C800","org":"American Water Works Association","slug":"","trade":"","guides":["domestic-water-service-meter-tap"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA C901","org":"American Water Works Association","slug":"","trade":"","guides":["domestic-water-service-meter-tap"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA D102","org":"American Water Works Association","slug":"","trade":"","guides":["storage-tank-coating-lining-interior"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA D104","org":"American Water Works Association","slug":"","trade":"","guides":["storage-tank-coating-lining-interior"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA M14","org":"American Water Works Association","slug":"","trade":"","guides":["backflow-preventer-assembly-types"],"url":"https://anvilfield.com/standards/"},{"name":"AWWA M22","org":"American Water Works Association","slug":"","trade":"","guides":["domestic-water-service-meter-tap"],"url":"https://anvilfield.com/standards/"},{"name":"ICC-ES AC156","org":"ICC Evaluation Service","slug":"","trade":"","guides":["data-center-seismic-anchoring-equipment"],"url":"https://anvilfield.com/standards/"},{"name":"ICC-ES AC193","org":"ICC Evaluation Service","slug":"","trade":"","guides":["anchor-bolt-baseplate-grout-qa"],"url":"https://anvilfield.com/standards/"},{"name":"ICC-ES AC358","org":"ICC Evaluation Service","slug":"","trade":"","guides":["helical-pier-screw-pile-foundations"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1015","org":"IEEE","slug":"","trade":"","guides":["protective-relay-coordination-study"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1036","org":"IEEE","slug":"","trade":"","guides":["power-factor-correction-capacitor-bank"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1185","org":"IEEE","slug":"","trade":"","guides":["cable-pull-planning-tension-card"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 141","org":"IEEE","slug":"","trade":"","guides":["short-circuit-available-fault-current-study"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1491","org":"IEEE","slug":"","trade":"","guides":["data-center-battery-monitoring-system-vrla-lithium"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 1547.1","org":"IEEE","slug":"","trade":"","guides":["bess-commissioning-punch-list"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 18","org":"IEEE","slug":"","trade":"","guides":["power-factor-correction-capacitor-bank"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 2883","org":"IEEE","slug":"","trade":"","guides":["data-center-decommissioning-equipment-removal"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 3002.3","org":"IEEE","slug":"","trade":"","guides":["short-circuit-available-fault-current-study"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 3007","org":"IEEE","slug":"","trade":"","guides":["datacenter-electrical-commissioning-power-qa"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 315","org":"IEEE","slug":"","trade":"","guides":["electrical-one-line-diagram-reading-symbols"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 404","org":"IEEE","slug":"","trade":"","guides":["medium-voltage-cable-termination-splicing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 515","org":"IEEE","slug":"","trade":"","guides":["pipe-freeze-protection-heat-trace"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 525","org":"IEEE","slug":"","trade":"","guides":["cable-pull-planning-tension-card"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 575","org":"IEEE","slug":"","trade":"","guides":["mv-cable-termination-testing"],"url":"https://anvilfield.com/standards/"},{"name":"IEEE 802.1","org":"IEEE","slug":"","trade":"","guides":["data-center-network-observability-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"IICRC S540","org":"IICRC","slug":"","trade":"","guides":["biohazard-trauma-sewage-cleanup"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 1011","org":"Standards body","slug":"","trade":"","guides":["weld-heat-input-cwi-acceptance"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 13373","org":"Standards body","slug":"","trade":"","guides":["predictive-maintenance-condition-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 13482","org":"Standards body","slug":"","trade":"","guides":["construction-robotics-jobsite-automation"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 15118","org":"Standards body","slug":"","trade":"","guides":["ev-dc-fast-charging-station-design"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 15143","org":"Standards body","slug":"","trade":"","guides":["jobsite-iot-rtls-connected-jobsite"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 15817","org":"Standards body","slug":"","trade":"","guides":["construction-robotics-jobsite-automation"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 16484","org":"Standards body","slug":"","trade":"","guides":["bms-ddc-controls-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 17359","org":"Standards body","slug":"","trade":"","guides":["predictive-maintenance-condition-monitoring"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 17757","org":"Standards body","slug":"","trade":"","guides":["construction-robotics-jobsite-automation"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 18434","org":"Standards body","slug":"","trade":"","guides":["infrared-thermography-inspection"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 22301","org":"Standards body","slug":"","trade":"","guides":["data-center-disaster-recovery-business-continuity"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 23500","org":"Standards body","slug":"","trade":"","guides":["pure-water-ro-di-systems"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 3966","org":"Standards body","slug":"","trade":"","guides":["air-balancing-report-procedure"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 50001","org":"Standards body","slug":"","trade":"","guides":["dcim-monitoring-asset-management"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 55000","org":"Standards body","slug":"","trade":"","guides":["roof-asset-management-capital-planning"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 8573","org":"Standards body","slug":"","trade":"","guides":["compressed-air-piping-system-design"],"url":"https://anvilfield.com/standards/"},{"name":"ISO 9001","org":"Standards body","slug":"","trade":"","guides":["construction-quality-control-qa-qc-program"],"url":"https://anvilfield.com/standards/"},{"name":"ISO/IEC 14908","org":"Standards body","slug":"","trade":"","guides":["bms-ddc-controls-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"IgCC","org":"International Code Council","slug":"","trade":"","guides":["plumbing-fixtures-types-water-efficiency"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 105","org":"National Fire Protection Association","slug":"","trade":"","guides":["fire-smoke-damper-installation-testing"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 1221","org":"National Fire Protection Association","slug":"","trade":"","guides":["das-in-building-wireless-public-safety"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 1225","org":"National Fire Protection Association","slug":"","trade":"","guides":["das-in-building-wireless-public-safety"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 13D","org":"National Fire Protection Association","slug":"","trade":"","guides":["fire-sprinkler-system-design-nfpa13"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 13R","org":"National Fire Protection Association","slug":"","trade":"","guides":["fire-sprinkler-system-design-nfpa13"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 14","org":"National Fire Protection Association","slug":"","trade":"","guides":["fire-pump-standpipe-system-design"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 204","org":"National Fire Protection Association","slug":"","trade":"","guides":["skylight-curb-installation-flashing"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 211","org":"National Fire Protection Association","slug":"","trade":"","guides":["outdoor-fire-feature-pit-fireplace"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 262","org":"National Fire Protection Association","slug":"","trade":"","guides":["cabling-pathways-firestop"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 303","org":"National Fire Protection Association","slug":"","trade":"","guides":["boat-dock-marina-construction"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 30A","org":"National Fire Protection Association","slug":"","trade":"","guides":["fuel-storage-tank-ust-ast-systems"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 31","org":"National Fire Protection Association","slug":"","trade":"","guides":["combustion-analysis-flue-gas-tuning"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 37","org":"National Fire Protection Association","slug":"","trade":"","guides":["standby-generator-ats-installation"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 45","org":"National Fire Protection Association","slug":"","trade":"","guides":["laboratory-fume-hood-exhaust-ventilation"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 496","org":"National Fire Protection Association","slug":"","trade":"","guides":["electrical-hazardous-classified-locations"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 497","org":"National Fire Protection Association","slug":"","trade":"","guides":["electrical-hazardous-classified-locations"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 499","org":"National Fire Protection Association","slug":"","trade":"","guides":["electrical-hazardous-classified-locations"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 731","org":"National Fire Protection Association","slug":"","trade":"","guides":["intrusion-alarm-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 85","org":"National Fire Protection Association","slug":"","trade":"","guides":["boiler-startup-commissioning"],"url":"https://anvilfield.com/standards/"},{"name":"NFPA 853","org":"National Fire Protection Association","slug":"","trade":"","guides":["data-center-onsite-generation-fuel-cell-microgrid"],"url":"https://anvilfield.com/standards/"},{"name":"NPS Preservation Brief 1","org":"National Park Service","slug":"","trade":"","guides":["masonry-repointing-tuckpointing-restoration"],"url":"https://anvilfield.com/standards/"},{"name":"NPS Preservation Brief 2","org":"National Park Service","slug":"","trade":"","guides":["masonry-repointing-tuckpointing-restoration"],"url":"https://anvilfield.com/standards/"},{"name":"OSHA 1904","org":"U.S. OSHA","slug":"","trade":"","guides":["construction-safety-program-osha"],"url":"https://anvilfield.com/standards/"},{"name":"TIA-222","org":"Standards body","slug":"","trade":"","guides":["cell-tower-construction-antenna-installation"],"url":"https://anvilfield.com/standards/"},{"name":"TIA-607-D","org":"Standards body","slug":"","trade":"","guides":["data-center-grounding-signal-reference-grid"],"url":"https://anvilfield.com/standards/"},{"name":"TIA-607-E","org":"Standards body","slug":"","trade":"","guides":["data-center-grounding-signal-reference-grid"],"url":"https://anvilfield.com/standards/"},{"name":"TIA-942-C","org":"Standards body","slug":"","trade":"","guides":["data-center-raised-floor-vs-slab-design"],"url":"https://anvilfield.com/standards/"},{"name":"TMS 402/602","org":"The Masonry Society","slug":"","trade":"","guides":["concrete-masonry-cmu-block-wall-construction"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1066","org":"Underwriters Laboratories","slug":"","trade":"","guides":["distribution-equipment-switchgear-switchboard-panelboard"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1558","org":"Underwriters Laboratories","slug":"","trade":"","guides":["distribution-equipment-switchgear-switchboard-panelboard"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1598C","org":"Underwriters Laboratories","slug":"","trade":"","guides":["led-lighting-retrofit-upgrade"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1610","org":"Underwriters Laboratories","slug":"","trade":"","guides":["intrusion-alarm-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1778","org":"Underwriters Laboratories","slug":"","trade":"","guides":["ups-types-online-line-interactive-standby"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1838","org":"Underwriters Laboratories","slug":"","trade":"","guides":["landscape-lighting-low-voltage-install"],"url":"https://anvilfield.com/standards/"},{"name":"UL 1897","org":"Underwriters Laboratories","slug":"","trade":"","guides":["standing-seam-metal-roof-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 2079","org":"Underwriters Laboratories","slug":"","trade":"","guides":["building-expansion-movement-joint-systems"],"url":"https://anvilfield.com/standards/"},{"name":"UL 2218","org":"Underwriters Laboratories","slug":"","trade":"","guides":["steep-slope-asphalt-shingle-roofing"],"url":"https://anvilfield.com/standards/"},{"name":"UL 2525","org":"Underwriters Laboratories","slug":"","trade":"","guides":["commercial-av-intercom-system-design"],"url":"https://anvilfield.com/standards/"},{"name":"UL 268","org":"Underwriters Laboratories","slug":"","trade":"","guides":["aspirating-smoke-detection-vesda"],"url":"https://anvilfield.com/standards/"},{"name":"UL 2755","org":"Underwriters Laboratories","slug":"","trade":"","guides":["modular-prefab-data-center-deployment"],"url":"https://anvilfield.com/standards/"},{"name":"UL 294","org":"Underwriters Laboratories","slug":"","trade":"","guides":["data-center-physical-security-access-control"],"url":"https://anvilfield.com/standards/"},{"name":"UL 300","org":"Underwriters Laboratories","slug":"","trade":"","guides":["kitchen-hood-suppression-semiannual"],"url":"https://anvilfield.com/standards/"},{"name":"UL 486C","org":"Underwriters Laboratories","slug":"","trade":"","guides":["electrical-splices-terminations-connectors"],"url":"https://anvilfield.com/standards/"},{"name":"UL 508","org":"Underwriters Laboratories","slug":"","trade":"","guides":["condensate-drain-trap-management"],"url":"https://anvilfield.com/standards/"},{"name":"UL 508A","org":"Underwriters Laboratories","slug":"","trade":"","guides":["control-panel-ul508a-sccr-build"],"url":"https://anvilfield.com/standards/"},{"name":"UL 514B","org":"Underwriters Laboratories","slug":"","trade":"","guides":["conduit-bodies-fittings-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 681","org":"Underwriters Laboratories","slug":"","trade":"","guides":["intrusion-alarm-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 752","org":"Underwriters Laboratories","slug":"","trade":"","guides":["window-film-tint-safety-security-solar"],"url":"https://anvilfield.com/standards/"},{"name":"UL 793","org":"Underwriters Laboratories","slug":"","trade":"","guides":["skylight-curb-installation-flashing"],"url":"https://anvilfield.com/standards/"},{"name":"UL 827","org":"Underwriters Laboratories","slug":"","trade":"","guides":["intrusion-alarm-system-installation"],"url":"https://anvilfield.com/standards/"},{"name":"UL 891","org":"Underwriters Laboratories","slug":"","trade":"","guides":["distribution-equipment-switchgear-switchboard-panelboard"],"url":"https://anvilfield.com/standards/"}]}