DGA Bottle Chain of Custody

Offline Android custody labels, photos, GPS, and export packages for transformer oil DGA sample bottles.

Built for the dangerous minute

The tech picks Main Tank, OLTC, Reservoir, Cooler, Bushing, Conservator, or Other before two clear samples can get swapped.

End of route

The app builds a PDF chain-of-custody report, CSV manifest, JSON archive, photo ZIP, and combined package through the Android share sheet.

Scope

This is a field documentation aid. It does not test oil, interpret gas, diagnose equipment, approve lab results, or control a transformer.

Store graphics