# DropTakeoff Copper DropTakeoff Copper is an Anvilfield Android app for offline low-voltage cabling takeoff and per-drop bidding. Canonical URL: https://anvilfield.com/droptakeoff_copper_dc Privacy URL: https://anvilfield.com/droptakeoff_copper_dc/privacy Google Play URL: https://play.google.com/store/apps/details?id=com.anvilfield.droptakeoffcopperdc Support: support@anvilfield.com ## What It Does The app turns estimator-entered positions, units per position, and average cable run into unit count, ports, cable footage with slack and waste, box count, panel count, forgotten line-item flags, cost per drop, and sell per drop. ## Core Workflows - Build pod-by-pod low-voltage takeoffs for copper data, CCTV camera drops, access-control doors, AV outlets, and patch work. - Keep a local cost book with unit costs, vendor names, part numbers, and optional camera barcode scan for part numbers. - Duplicate a bid into a what-if or change-order takeoff. - Export a GC proposal PDF, office BOM CSV, foreman order card, or copy-ready per-drop sell number. ## Offline And Privacy Takeoff math, local storage, cost books, and report creation work on the device without accounts, backend, telemetry, cloud sync, or a release INTERNET permission. Android share targets and Google Play purchase services may use network access outside the app's offline takeoff engine. ## Pricing Free for three bids. Unlock unlimited bids for $19.99 a month, $199 a year, or $499 once for life. ## Limits DropTakeoff Copper is a takeoff and bid aid. It is not a stamped estimate, not a guaranteed price, and not a substitute for the estimator's own review. The estimator verifies every count, cost, assumption, exclusion, and final number before bid.