Roofing
Metal roof types compared: standing seam, exposed fastener, and shingles
How to choose a metal roof: the fastening split that decides everything, standing seam vs exposed-fastener panels, metal shingles and stone-coated steel, the metals and coatings, the slope and deck limits, and the cost-and-life trade.
Direct answer
Standing seam conceals its main panel attachments; exposed-fastener panels use gasketed screws through the sheet; metal shingles provide a traditional steep-slope appearance. MBCI specifies minimum slopes of 1/4:12 for Double-Lok, 1/2:12 for sealed-lap PBR, and 3:12 for LokSeam; DECRA specifies 4:12 for Shingle XD. Choose the named system by slope, support, movement details, and finish performance, then distinguish its paint warranty from its expected roof life.
On this page
Metal roof types, and the split that decides everythingWhat is the difference between standing seam and exposed fastener?Where do exposed-fastener and standing seam roofs leak?How does thermal movement affect metal roof life?Standing seam: concealed clips and the seam typesExposed-fastener panels: R-panel, PBR, corrugated, 5V, and ag-panelMetal shingles, tiles, shakes, and stone-coated steelWhat metal and gauge should a metal roof be?Coatings and finish life: PVDF versus SMPStructural or architectural: does the panel need a solid deck?What is the minimum slope for each metal roof type?Worked example: selecting panels for a 1:12 roofThe clip, the fixed point, and wind upliftWhat is oil canning?Dissimilar metals and galvanic corrosionTrims and details: ridge, eave, rake, and valleyCost and service life by typeHow do I choose a metal roof type?Metal over an existing roofCommercial and data-center metal roofsWhat to documentCommon mistakesField checklistStandards and referencesManufacturer-document matrix, checked November 6, 2026Units, terms, and referencesCitation and update recordOpen the related tool for the calculation, checklist, or packet.
FieldOS by AnvilfieldOffline-first FieldOS for job photos, proof packets, property memory, calculations, teams, billing, and owner-ready reports.Key takeaways
- MBCI specifies minimum slopes of 1/4:12 for Double-Lok, 1/2:12 for PBR with lap sealant and 3:12 for LokSeam.
- MCA projects more than 60 years of service for comparable low-slope, unpainted Galvalume standing seam roofs built using best practices, based on 14 roofs with up to 35 years in service.
- Standing seam conceals its main panel attachments but can still use through-fasteners at end laps and penetrations, as MBMA guidance published by IBHS explains.
- MBCI lists PBR in standard 26 gauge with 24 and 22 gauge options, while wind resistance depends on the tested panel, fastener, support and spacing combination.
- McElroy's standard covered PVDF colors have 40-year adhesion and 30-year chalk-and-fade coverage from shipment, while its SMP form provides 30 years with different appearance thresholds.
Metal roof types, and the split that decides everything
A metal roof is sorted first by how the panel is fastened to the building. Fastening controls attachment holes, thermal movement details, and maintenance needs. Concealed-fastener systems, which standing seam leads, hide the main panel attachments; flashings, end laps, and penetrations still need sealed details. Exposed-fastener systems, the through-fastened panels, screw straight through the panel face into the structure.
Fastening changes the maintenance burden even when the panel metal and paint are the same. The MBMA low-slope metal guidance published by IBHS distinguishes concealed clips from through-fasteners and identifies joints, sealants, and accessories as parts of the roof system. Fastening alone does not establish a fixed difference in service years.
The third group, metal shingles and tiles and stone-coated steel, is a steep-slope look that mimics asphalt, slate, or wood shake, and it fastens its own way. This guide sorts the families, the principle behind the split, and how to pick between them. The how-to for building a standing seam roof is in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/), and renewing an aging one in place is in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/).
What is the difference between standing seam and exposed fastener?
The difference is how the panel attaches. Standing seam uses concealed clips or a concealed fastening flange, with a raised joint between panels. Exposed-fastener panels attach through the sheet with gasketed screws; the MBMA guidance published by IBHS specifies EPDM washers for through-fastened roofs. Standing seam still has through-fasteners at some end laps and penetrations, so concealed attachment does not mean a hole-free roof.
The washer is one leakage path, not the whole roof. Through-fastened panels also depend on sealed side laps, end laps, closures, and flashings. Standing seam removes repeated exposed attachment holes from the main panel runs, but its seams and roof details still need inspection.
The seam types, the clips, and the install sequence for standing seam are worked end to end in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/). Why the screws leak, and how to fix them on an aging roof, is in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/).
Where do exposed-fastener and standing seam roofs leak?
Start at the water-entry detail, then trace the stain below it. MBCI's PBR and standing seam manuals show that seal continuity, fastening, and closure details matter on both roof types. The MBMA maintenance guidance published by IBHS also calls attention to sealants, flashings, fasteners, and corrosion.
| Location | Exposed-fastener roof | Standing seam roof | What to record |
|---|---|---|---|
| Panel attachment | Underdriven, overdriven, tilted, loose, or deteriorated washer seals admit water at sheet holes | Main attachment is concealed; exposed detail fasteners still need sound seals | Photograph seating, washer condition, hole damage, and supporting material |
| Side joint | Missing or discontinuous lap sealant and loose lap screws open a water path | Incomplete engagement, faulty seaming, or displaced seam sealant opens a joint | Identify profile and compare installed joint with its manual |
| End lap | Sealant must remain continuous across the lapped profile | Backing plates, sealant, and clamping fasteners make a sealed assembly | Record overlap, seal continuity, backing, and attachment |
| Ridge, eave, rake, and valley | Closures and trim seals keep water from entering behind panels | Closures and terminations must seal without obstructing designed movement | Record missing closures, blocked drainage, and restrained panel ends |
| Pipe or equipment curb | Boot or curb joint, fastener seal, and upslope drainage are separate checks | Curb and boot details must also accommodate panel movement | Compare the installed flashing with the approved penetration detail |
How does thermal movement affect metal roof life?
A 30 ft steel panel changes length by about 0.22 in across a 90 degree F temperature change, using the New Zealand Metal Roofing Manufacturers' expansion formula in Code of Practice v26.09. Multiply panel length by temperature change and the steel expansion coefficient to calculate that movement. The same source gives aluminum approximately twice steel's expansion rate at an equal temperature change.
Anvilfield calculation method: convert the temperature change to 50 degrees C and the panel length to 9.144 m. Apply the source's steel expansion formula: 12 × 50 × 9.144 / 1000 = 5.49 mm, or about 0.22 in.
Standing seam movement depends on the attachment design. Sliding clips let the panel move relative to the supporting structure; fixed clips serve the applications identified by the manufacturer. Through-fastened sheets restrain movement at their screws, transferring forces into the sheet and supports. The New Zealand Metal Roofing Manufacturers describe sheet bowing and fastener fatigue as possible responses, while the MBMA guidance published by IBHS identifies washer seating and fastener condition as maintenance items.
That leak mechanism, and its repair options, are covered in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/). MCA projects more than 60 years for comparable low-slope, unpainted Galvalume standing seam systems built using best practices, based on inspections of roofs with up to 35 years in service. That projection belongs to the studied assembly, including its sealants and ancillary components; it is not a schedule for re-screwing every exposed-fastener roof.
Standing seam: concealed clips and the seam types
Standing seam is a family sorted by its seam. The two you choose between are snap-lock and mechanically seamed. Snap-lock panels have edges rolled so the next panel snaps down over the last by hand, with no seaming machine, faster to install, and they suit moderate slopes. Mechanically seamed panels are set with the seam open, then a powered seamer folds it closed. A single lock folds the seam about 90 degrees. A double lock folds it again to roughly 180 degrees, wrapping the seam tight on itself for low slope and hard weather.
A separate split is how the panel attaches. Clip systems provide the movement allowed by their clip and fixed-point details. Nail-strip, or fastener-flange, panels conceal a directly fastened flange under the next panel; Construction Metal Products uses a slotted flange to allow expansion and contraction. Nail-strip does not automatically mean the panel is pinned against movement.
Construction Metal Products lists Nail Strip seams from 1 to 1.5 in, while MBCI lists LokSeam at 1.75 in. Seam height helps describe the profile; tested load capacity and the manufacturer's slope limit determine its use. The profile, the clip, and the seam are a matched set from one manufacturer, and you do not put one line's clip under another's panel. The full seam-by-seam detail and the install sequence are in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/).
Exposed-fastener panels: R-panel, PBR, corrugated, 5V, and ag-panel
Exposed-fastener panels are the through-fastened, screw-down side of metal roofing, and they go by their profiles. PBR is the purlin-bearing-rib profile, with a leg that supports the lap over framing; MBCI lists its major ribs at 1.25 in high on 12 in centers.
Corrugated is the old wavy profile, the classic round rib. 5V crimp is the residential and light-commercial panel named for the V-shaped crimps at its edges and center. Ag-panel, or multi-rib, is another profile used on barns and pole buildings.
What they share is the fastening: screws with gasketed washers driven through the sheet into purlins or a deck. MBCI's PBR installation details place panel attachment fasteners beside the major ribs; fastener location follows the profile detail, not a universal rule to screw through the rib. Cheaper material, faster install, and a profile you can buy at any supply house. The weak point is the same across all of them, the fastener and its washer sitting in the field of the roof.
These panels live on agricultural, utility, and budget commercial buildings, where access for fastener, lap, and flashing maintenance is part of ownership. When that roof ages and leaks at the screws, restoring it in place rather than tearing it off is worked in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/).
Metal shingles, tiles, shakes, and stone-coated steel
Metal shingles are the steep-slope, architectural side of metal roofing, stamped and finished to look like asphalt shingle, slate, clay tile, or wood shake while carrying the strength and life of steel. They install in interlocking pieces or short panels rather than long vertical runs, with concealed nailing flanges that hide the fasteners, so their main attachments are concealed; trim and penetration fasteners follow the product details. They suit an owner who wants metal performance with a traditional roof look instead of the modern vertical line of standing seam.
Stone-coated steel is a steel panel surfaced with acrylic-bonded stone granules that give it the texture and color of tile or shake and a matte, non-metallic finish. The granules hide the smooth reflections that reveal oil canning on flat panels. DECRA publishes product-specific fire, wind, and impact classifications in its guide specifications; those classifications belong to the specified assembly. Compare the selected color and product's solar-performance data when heat gain matters.
These are steep-slope products. DECRA's March 2024 guide specifications set Shake XD at 3:12 minimum and Shingle XD at 4:12 minimum as roof coverings. Below those limits, down to 2:12, DECRA treats the panels as decorative over a separate code-compliant roof covering system.
What metal and gauge should a metal roof be?
The metal is usually steel, and the steel needs a metallic coating under the paint to keep it from rusting. Galvalume, an aluminum-zinc alloy coating that is roughly 55 percent aluminum, outlasts plain galvanized zinc in most exposures and is the common choice, and Wheeling-Nippon Steel offers both AZ50 and AZ55 coating weights. Specify the coating required by the selected panel and finish rather than treating AZ55 as the only roofing grade. Aluminum panels are the other option, lighter and immune to red rust, which is why they win on the coast and in corrosive air where steel struggles. Aluminum costs more, dents easier, and moves more with heat.
Gauge describes steel thickness, and a smaller gauge number is thicker metal. MBCI lists PBR in 26 gauge as standard with 24 and 22 gauge options; Construction Metal Products lists its Nail Strip panel in 24 and 26 gauge steel and .032 in aluminum. Aluminum is specified by decimal thickness. Wind resistance follows the tested panel, fastener, support, and spacing combination, not gauge alone.
Match the metal and gauge to the exposure and the wind, and confirm the panel's coating weight and warranty against the manufacturer, because the substrate corrosion warranty and the paint warranty are two separate things.
Coatings and finish life: PVDF versus SMP
McElroy's PVDF warranty, MM613 Rev. 6/23, provides 40 years of adhesion coverage and 30 years of chalk and fade coverage for its standard covered colors. Its SMP warranty, MM601 Rev. 11/23, provides 30 years for adhesion, chalk, and fade, with different appearance thresholds for roofs and walls. Both forms measure those terms from shipment. Warranty duration is a contractual remedy period; coating weathering and roof leakage are separate performance questions.
Bare Galvalume, with no paint color coat, is a third option that weathers to a metallic gray. Wheeling-Nippon Steel describes Galvalume as aluminum-zinc-coated steel and distinguishes it from its acrylic-coated Galvalume Plus product. Select a paint system when specified color retention is part of the roof's appearance requirements.
Spec the finish, not just the color, because two panels in the same shade can carry very different lives. A factory paint finish is not the same thing as a field-applied restoration coating. Renewing a weathered finish with a coating is its own system, worked in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/).
McElroy uses ASTM D4214 Method A for chalk and ASTM D2244 for color change in these warranty forms. A higher chalk rating means less chalk; a smaller delta-E change means closer color retention. Read the color-specific terms, exposure exclusions, maintenance obligations, and remedy together with the headline duration.
McElroy's April 2026 comparison flyer documents a Louisiana residence with initially matching PVDF and SMP panels: its photograph taken less than 8 years later shows visible SMP chalking and fading while the PVDF panels retain their darker appearance. This is a manufacturer-reported field observation of appearance, distinct from both the warranty limits and the time until the roof needs replacement.
FGIA identifies AAMA 2605 as a performance specification for organic coatings on aluminum extrusions and panels. A resin name by itself does not establish compliance for every painted steel roof; use the coating manufacturer's product data and the applicable substrate specification.
| McElroy warranty and roof finish | Adhesion term | Chalk / fade term and limits | Color exceptions |
|---|---|---|---|
| PVDF, MM613 Rev. 6/23 | 40 years | 30 years; minimum chalk rating 8; maximum color change 5 Hunter delta-E units | Orange, Casco Orange, Safety Orange, Brite Red: 20-year adhesion and 10-year chalk/fade terms |
| SMP, MM601 Rev. 11/23 | 30 years | 30 years; minimum roof chalk rating 6; maximum color change 7 Hunter delta-E units | Charcoal and Matte Black: roof fade limit 11 Hunter delta-E units |
Structural or architectural: does the panel need a solid deck?
Whether the panel needs a solid deck is the structural-versus-architectural divide, and it decides what you build beneath the metal. Structural panels have tested load capacity over open framing; nonstructural panels rely on a supporting deck. MBCI's LokSeam manual identifies its snap-together panel as structural and permits installation over purlins or bar joists, while specifying a 3:12 minimum slope. Support capacity and water-shedding performance are separate properties.
The rough line is the seam height and the rib. A taller, stiffer profile tends to be structural and a low-seam profile tends to be architectural, but the manufacturer's load tables set the actual purlin spacing, not a rule of thumb. Hybrid profiles exist that fall between the two and can go over either a deck or purlins.
The deck or framing under the panel is its own decision, the sheathing type, the underlayment, the ventilation, and it is worth getting right by the [roof deck selection](/field-guides/roofing/roof-deck-substrate-types/) and [roofing underlayment](/field-guides/roofing/roofing-underlayment-types-felt-synthetic/) guides. For metal the point is matching the panel to what is under it. A nonstructural panel needs a deck to support its loads, while a structural panel can use a deck when the specified assembly calls for one.
What is the minimum slope for each metal roof type?
MBCI specifies 1/4:12 for Double-Lok mechanically seamed roofing, 1/2:12 for PBR with sealed side laps and end laps, and 3:12 for snap-together LokSeam. Everlast Metals specifies 1:12 for its PBR panel. DECRA's March 2024 guide specifications require 3:12 for Shake XD and 4:12 for Shingle XD as roof coverings. These are named-system minimums, not interchangeable limits for every panel in the same family.
A hydrostatic assembly uses sealed joints to resist water pressure; a hydrokinetic assembly sheds water down the roof. The MBMA guidance published by IBHS notes that both categories can include different joint details. A mechanically folded seam alone does not make every penetration or end lap watertight, and a low minimum slope does not authorize ponding.
The slope detail and the low-slope sealant rules for standing seam are in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/). When the slope is genuinely low, a single-ply membrane is often the better roof than forcing metal below where its seam wants to live.
MBCI's Double-Lok manual explicitly states that installation below 1/4:12 voids its material warranties. Other systems have their own eligibility terms. Match the measured slope, lap sealant, seam configuration, support, and project approval to the exact product before ordering.
| Named system | Published minimum slope | Detail that controls use |
|---|---|---|
| MBCI Double-Lok | 1/4:12 | Mechanically seamed; specified clips, sealants, and closures |
| MBCI LokSeam | 3:12 | Snap-together structural panel; factory seam mastic and specified end seals |
| MBCI PBR | 1/2:12 | Field-applied tape sealant at side laps and end laps |
| Everlast Metals PBR | 1:12 | Use Everlast's panel details, not MBCI's lower limit |
| DECRA Shake XD | 3:12 | Roof covering; March 2024 guide specification |
| DECRA Shingle XD | 4:12 | Roof covering; March 2024 guide specification |
Worked example: selecting panels for a 1:12 roof
For a roof rising 2 feet over a horizontal run of 24 feet, divide rise by run and multiply by 12: the slope is 1:12. This is an Anvilfield calculation from the stated job dimensions. MBCI Double-Lok and sealed-lap PBR clear the published slope screen; Everlast PBR is exactly at its published minimum.
MBCI LokSeam and DECRA Shake XD and Shingle XD do not clear that roof-covering slope screen. Record the measured slope on each roof area, then verify support capacity, drainage, lap details, and the project's approval conditions before selecting among the remaining systems.
| Input or comparison | Value | Result |
|---|---|---|
| Rise / horizontal run | 2 ft / 24 ft | 12 × 2 / 24 = 1:12 |
| MBCI Double-Lok / PBR | 1/4:12 / 1/2:12 | Roof slope exceeds these minimums |
| Everlast PBR | 1:12 | Roof slope equals this minimum |
| MBCI LokSeam / DECRA Shake XD | 3:12 | Roof slope below minimum |
| DECRA Shingle XD | 4:12 | Roof slope below roof-covering minimum |
The clip, the fixed point, and wind uplift
On a concealed-clip roof, the clip holds the panel against wind while the specified attachment design controls thermal movement. The MBMA guidance published by IBHS distinguishes fixed clips used with shorter panels from sliding clips that accommodate expansion and contraction. Follow the selected system's fixed-point, sliding-clip, and termination details; accidental restraint changes how the panel moves. Construction Metal Products' Nail Strip system accommodates movement through a slotted flange rather than separate clips.
Uplift resistance keeps the roof attached during a storm. The MBMA guidance published by IBHS identifies windward edges and corners as common starting points for wind damage and directs installers to the approved attachment locations. Use the approved clip or fastener schedule for each roof zone, including any closer spacing required at corners and edges.
The ratings come through ASTM E1592 testing and UL 580 classifications, including Class 90, plus applicable FM assembly approvals, matched to the design wind pressure the building code sets through ASCE 7. Install to the tested spacing or you do not have the rating on the submittal. The full clip, fixed-point, and uplift detail is in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/). Coordinate perimeter attachment with [edge metal and coping wind design](/field-guides/roofing/edge-metal-coping-wind-design/).
What is oil canning?
Oil canning is the visible waviness in the flat of a metal panel, the gentle ripple you see between the seams when the light catches it. It is stress in the metal showing up as a surface wave, and the honest word for it is cosmetic. MBCI's LokSeam manual treats oil canning as an appearance condition and states that it is not a cause for rejection. Set the owner's expectation before the panels go up, and distinguish cosmetic waviness from panel damage or failed attachments.
It shows most on wide, flat, smooth panels, because a big flat field of metal has nothing to stiffen it. The causes stack: stress left in the coil at the mill, roll forming, rough handling, and fastening the panel so it cannot move. Striations, the fine parallel lines rolled into the pan, break up the surface so the eye does not read the waves, and tension-leveled coil and narrower panels start flatter.
Smooth standing seam and flat panels show it most. Stone-coated steel and ribbed exposed-fastener panels hide it, because the granules and the ribs break up the surface. The full causes-and-cures detail is in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/). Profile selection, handling, and attachment details reduce its visibility.
Dissimilar metals and galvanic corrosion
Mixing the wrong metals on a roof corrodes one of them, and on a roof there is always water present to drive it. Galvanic corrosion happens when two different metals touch with moisture between them, and the more active metal eats away while the nobler one sits fine. Copper is the worst offender against steel, Galvalume, aluminum, and zinc, and it does not even need direct contact. Water running off a copper flashing, pipe, or roof onto a Galvalume panel below carries enough copper to corrode the panel where it lands. So you do not drain copper onto a steel or aluminum roof.
The same caution covers fasteners and accessories. Use clips, screws, and trim compatible with the panel metal, not a bare steel fastener in an aluminum panel or the reverse. Keep the panels off pressure-treated lumber, fresh concrete runoff, and bare iron, all of which attack the coating.
This is a selection issue as much as an install one, because the metal you pick has to live with the flashings, gutters, and neighboring materials already on the building. Where you cannot separate incompatible metals, isolate them with a gasket or a barrier so the circuit cannot form. The detail and the field cases are in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/).
Trims and details: ridge, eave, rake, and valley
The field of any metal panel is the easy part. The roof is won or lost at the terminations, and metal has its own set. At the eave the panel hooks an eave cleat or a hemmed edge that holds it down while letting it slide. At the ridge and hip the panels stop short and a ridge cap covers the gap, with foam or metal closures under it to keep weather and pests out. At the rake the panel meets a gable trim over a cleat. Valleys carry the most water, so they get a wide valley metal under the panels with the panel ends held back to leave an open channel.
The principle running through all of it is hold the metal against the wind, keep water out, and still let the panel move. On an exposed-fastener roof the trims are simpler and screwed down like the panels. On standing seam they have to hold the edge without pinning a panel that needs to float.
Penetrations need the panel manufacturer's pipe-boot or curb detail, including sealant, attachments, and clearance for roof movement. The MBMA guidance published by IBHS recognizes through-fasteners at standing seam penetrations; a blanket prohibition on pan fasteners would rule out legitimate manufacturer details. The metal-specific versions are in the [standing seam metal roof installation guide](/field-guides/roofing/standing-seam-metal-roof-installation/). Use the [roof penetration flashing guide](/field-guides/roofing/roof-penetration-flashing-details/) to organize the detail review.
Cost and service life by type
MCA's service-life assessment projects more than 60 years for comparable low-slope, unpainted Galvalume standing seam roofs installed using best practices. Its evidence includes 14 roofs with up to 35 years in service, inspections, and evaluation of panels, sealants, and ancillary components. The observed ages and the projected life are different measures. Budget for the actual assembly's fasteners, joints, and corrosion exposure instead of assigning every metal shingle or screw-down roof a fixed expiration age.
The number to watch is not the install price. It is the cost over the life. Include access, inspections, fastener and sealant repairs, finish renewal, and eventual replacement in the ownership comparison. Restoring an aging metal roof in place, rather than replacing it, is the move that changes that math, and it is worked in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/). To find the next metal-roof assessment account, PorchRocket's Ground Control can narrow commercial building lists by roof material before the crew verifies the panel system on site.
| Type | Attachment | Named slope example | Maintenance focus |
|---|---|---|---|
| Mechanically seamed standing seam | Concealed clips | MBCI Double-Lok: 1/4:12 | Seams, end laps, closures, penetrations, and movement details |
| Snap-together standing seam | Clips or a product-specific flange | MBCI LokSeam: 3:12 | Seam engagement and terminations; verify support rating |
| Stone-coated steel | Product-specific concealed attachment | DECRA Shake XD: 3:12; Shingle XD: 4:12 | Interlocks, cut panels, valleys, and penetration flashings |
| Exposed-fastener panels | Gasketed screws through sheet | MBCI sealed-lap PBR: 1/2:12; Everlast PBR: 1:12 | Washers, screw seating, lap seals, corrosion, and closures |
How do I choose a metal roof type?
Choosing a metal roof comes down to five things weighed together: slope, what is under the roof, budget, look, and climate. Take slope first: MBCI permits Double-Lok down to 1/4:12 and sealed-lap PBR down to 1/2:12, so both concealed and exposed attachments have low-slope applications. A steep slope opens up more systems, including shingles. Open purlins with no deck require a structural panel; a solid deck supports nonstructural panels and the specified shingle assemblies.
Budget and life come next. Compare panel supply, clips, seaming, and future attachment and joint maintenance over the owner's planned holding period. The look decides between the modern vertical line of standing seam and the traditional shingle, shake, or tile of stone-coated steel. High wind requires an assembly whose tested capacity meets the design demand, whether its fasteners are concealed or exposed.
Coastal selection must address salt exposure in both the metal specification and the warranty. McElroy's MM613 and MM601 forms exclude panels exposed to salt spray or installed within 1,500 feet of a saltwater environment. For freezing climates, MBCI's Double-Lok manual recommends field-seamed panels and details that limit ice dams; snow retention and drainage also need to follow the roof design.
No single type wins every job. The honest answer is to let the slope and the structure narrow the field, then let budget, look, and climate pick within it.
Metal over an existing roof
A metal roof can often go over an existing roof rather than after a tear-off, which saves the cost and the disruption of stripping the old one and keeps the building dry during the work. Metal over an old shingle roof usually runs on battens or a recover board that gives a flat plane and the airspace the panel wants. Metal over an old metal roof uses retrofit sub-purlins, hat channels or notched zee members, that nest over the existing ribs and fasten through to the structure below, creating a new level plane to carry a new standing seam or exposed-fastener roof above the old one. The cavity between can hold insulation or stay a ventilated air space.
This is a re-roof and an engineered call, because the existing structure has to carry the added load and the local code has to allow the recover. It is not the same as restoring the existing metal roof in place by coating it. When the old metal is sound enough to keep, restoring it is the cheaper path, worked in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/). When it is too far gone to coat but the building cannot take a tear-off, the metal-over-metal recover is the answer.
Commercial and data-center metal roofs
Big commercial and institutional buildings lean on metal for the same reasons a house does, plus span and uptime. The acres of roof over a distribution center, a manufacturing plant, or a data hall are commonly structural standing seam over open purlins, because the panel spans the framing and skips the cost of a solid deck across a huge area. Where the building is insured or institutional, an FM-approved assembly is often required, and that requirement reaches down to the clip spacing and the fasteners.
Over a critical building the tolerance for a leak is different. A leak over a data white space or a packed warehouse aisle is downtime or ruined stock, not a stained ceiling tile, so the seam type runs to a mechanically double-locked seam, the uplift assembly is matched tight to the wind zone, and the QC is closer.
These roofs also get coated or restored in place rather than torn off when they age, because taking the roof off an operating facility is the expensive, disruptive option. That restoration work over a live building is covered in the [metal roof restoration and coating guide](/field-guides/roofing/metal-roof-restoration-coating/).
What to document
Choosing a metal roof type is a decision someone will question later, when the roof is being warrantied, re-roofed, or sold, so the selection is worth a record. The file is what tells the next person why this panel, this metal, this slope, and what the roof is rated to.
Capture the panel type and profile, the fastening method, the metal and gauge, the coating and its warranty, the seam type for standing seam, the panel's minimum slope against the actual roof slope, the substrate it sits on, and the tested uplift rating the assembly was installed to. If the choice was driven by a constraint, a low slope, a coastal exposure, an open-framing structure, write down the constraint, because it explains the call. A tool like FieldOS is built to hold this kind of by-area record, the spec, the photos, and the ratings tied to a place, so the file is the one the warranty inspection runs against.
| Field to record | Why it matters |
|---|---|
| Panel type and profile | Sets the slope limit, the clips, and the life |
| Fastening method | Concealed vs through-fastened drives the leak path |
| Metal, gauge, and coating | Drives corrosion life, oil canning, and warranty |
| Seam type (standing seam) | Snap vs mechanical sets the low-slope and weather limit |
| Panel minimum slope vs roof slope | Confirms product eligibility and the specified lap and seam details |
| Substrate: deck or open framing | Confirms the structural vs architectural match |
| Tested uplift rating (UL/FM/E1592) | Ties the roof to the wind design |
Common mistakes
- Putting an exposed-fastener or snap-lock panel below its minimum slope, where the unsealed joints take on water.
- Pinning a panel that needs to float, so it oil-cans, wallows its fastener holes, and leaks.
- Mixing dissimilar metals, draining copper onto Galvalume or aluminum, or using incompatible fasteners.
- Using a fixed clip where a floating clip belongs, or setting the fixed point in the wrong place.
- Putting an architectural panel or metal shingle over open framing with no solid deck.
- Treating the longest paint warranty as proof of the best color retention, without comparing its chalk and fade limits.
- Buying on install price alone and ignoring the re-screw and recoat an exposed-fastener roof needs to reach the same age.
- Carrying a slope minimum, a gauge, or a warranty term from one manufacturer onto another's panel.
Field checklist
Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.
Standards and references
The panel manufacturer governs more of a metal roof than any published standard. The slope minimums, the gauges and coatings, the clip type and spacing, the seam and sealant, and the warranties all come from the specific product line, and they do not transfer between brands. Read the manufacturer's data and details for the exact panel first, because that document is what the warranty inspection runs against.
Around that, a few bodies set the framework. The Metal Construction Association, the MCA, publishes guidance on metal roof systems, oil canning, clips, and thermal movement. SMACNA, the Sheet Metal and Air Conditioning Contractors' National Association, sets the architectural sheet metal standards behind the flashings and trims, and MBCI and similar manufacturers publish the panel profiles and load tables. The NRCA covers roofing practice generally. For finishes, use the metal and coating product specifications; FGIA's AAMA 2605 concerns coatings on aluminum extrusions and panels, not a universal warranty class for painted steel roofing. For uplift, ASTM E1592 testing, UL 580 classifications such as Class 90, and FM assembly approvals rate the assembly against the design wind pressure the building code sets through ASCE 7.
Record the document revision and the system it covers. The project design must meet the adopted code and the manufacturer's installation requirements, including stricter project-specific limits. The matrix below identifies the documents used for this comparison and the date they were checked.
Manufacturer-document matrix, checked November 6, 2026
Use the product manual and the project's approved details together. Every document below was checked on 2026-11-06; a document revision is listed separately from that access date. Keep the selected files with the submittal so a future repair uses the same panel and detail basis.
| Manufacturer document | Document revision | Selection or inspection use | Checked |
|---|---|---|---|
| [MBCI Double-Lok Technical/Installation Information](https://www.mbci.com/wp-content/uploads/Widen%20Assets/Manuals/MBCI22_DoubleLok-Installation-Manual_0704229991104_RevA_MS_0722_WEB.pdf) | Rev. A, 07/22 | Minimum slope, sliding clips, sealant, closure and penetration details | 2026-11-06 |
| [MBCI LokSeam Technical/Installation Information](https://www.mbci.com/wp-content/uploads/Widen%20Assets/ManualsMBCI25_LokSeam-Manual_0707249991102_RevE_MS_1225_WEB.pdf) | Rev. E, 12/25; pages marked Rev. 00.05 | Minimum slope, structural support, end seals, and oil-canning provisions | 2026-11-06 |
| [MBCI PBR/PBU installation manual, hosted by Robertson Building Systems](https://www.robertsonbuildings.com/wp-content/uploads/2017/01/PBR-PBU-Manual_AUG_2016.pdf) | August 2016 file; pages marked Rev. 00.00 | PBR minimum slope, tape-sealed side/end laps, and attachment locations | 2026-11-06 |
| [MBCI PBR product page](https://www.mbci.com/products/pbr/) | Undated web page | Current published PBR minimum slope and profile dimensions | 2026-11-06 |
| [Everlast Metals PBR sell sheet](https://everlastmetals.com/wp-content/uploads/2025/06/EM_PBRSS_PBR_SellSheet.pdf) | Undated PDF | PBR minimum slope differs from MBCI | 2026-11-06 |
| [DECRA Shake XD guide specification](https://www.decra.com/hubfs/FINAL%20--%20DECRA%20Shake%20XD%20Roof%20Panels%20-%20Guide%20Specification%20-%2010aug2018%20-%20EDIT%20march2024.pdf) | March 2024 | Roof-covering slope and decorative-use distinction | 2026-11-06 |
| [DECRA Shingle XD guide specification](https://www.decra.com/hubfs/FINAL%20--%20DECRA%20Shingle%20XD%20Roof%20Panels%20-%20Guide%20Specification%20-%2010aug2018%20-%20EDIT%20march2024.pdf) | March 2024 | Roof-covering slope and decorative-use distinction | 2026-11-06 |
| [McElroy MM613 PVDF coating warranty without substrate](https://www.mcelroymetal.com/hubfs/assets/MM613-Fluropon-Kynar-500-PVDF-Coating-without-Substrate.pdf) | Rev. 6/23 | Adhesion, chalk/fade terms and special-color exceptions | 2026-11-06 |
| [McElroy MM601 SMP and Crinkle Finish warranty without substrate](https://www.mcelroymetal.com/hubfs/assets/MM601-SMP-%26-Crinkle-Finish-without-Substrate.pdf) | Rev. 11/23 | Roof and wall appearance thresholds and color exceptions | 2026-11-06 |
| [McElroy MM321 Kynar 500 PVDF vs SMP](https://www.mcelroymetal.com/hubfs/assets/MM321%20Kynar%20vs%20SMP%20Flyer%200426.pdf) | 04/26 | Manufacturer field photographs, including the Louisiana residence | 2026-11-06 |
| [Construction Metal Products Nail Strip panel](https://cmpmetalsystems.com/cmp-product/nail-strip-panel/) | Undated web page | Slotted securement flange allows expansion and contraction | 2026-11-06 |
Units, terms, and references
Metal roofing carries its own vocabulary, and the same part or number reads differently across a data sheet, a spec, and a drawing.
Gauge describes steel thickness, where a higher number is thinner metal, while aluminum is sold by decimal inch like .032 in. Slope is written as rise over run, a 3/12 meaning 3 in of rise per 12 in of run, and sometimes as a percent or in degrees. Coating weight on Galvalume is given as AZ followed by a number, AZ55 a common roofing grade. Paint comparisons use the specified coating, substrate, chalk and color-change limits, and exposure conditions. Panel coverage is the finished width each panel covers. Service life is in years, and the warranty splits into a paint warranty and a separate substrate corrosion warranty.
- Standing seam
- A metal panel system with a raised, interlocking seam and concealed main attachments; movement is controlled by the clip or flange design
- Exposed / through-fastener panel
- A panel screwed through its face with a gasketed washer at each hole, the common leak point
- Stone-coated steel
- A steel panel surfaced with bonded stone granules to mimic tile, shake, or shingle
- Structural vs architectural
- Structural panels have load capacity over open framing; nonstructural architectural panels rely on a supporting deck. Minimum slope follows the selected system.
- Galvalume
- An aluminum-zinc alloy coating on steel, roughly 55 percent aluminum, for corrosion resistance
- PVDF / Kynar vs SMP
- PVDF is a fluoropolymer coating; SMP is silicone-modified polyester. Compare each finish's chalk and color-change limits and observed weathering.
- Snap-lock vs mechanical seam
- Snap seams press together by hand; mechanical seams are folded closed by a powered seamer
- Hydrostatic vs hydrokinetic
- Hydrostatic assemblies use sealed joints to resist water pressure; hydrokinetic assemblies shed water down the slope. Both require drainage.
Citation and update record
Updated 2026-11-06: corrected minimum slopes, attachment and leakage descriptions, and finish warranty comparisons; added manufacturer document dates, observed performance evidence, and a worked slope selection.
How to cite this page: Anvilfield, Metal roof types compared: standing seam, exposed fastener, and shingles, 2026, https://anvilfield.com/field-guides/roofing/metal-roof-types-comparison/.
FAQ
What is the difference between standing seam and exposed fastener?
Standing seam conceals its main attachments beneath raised seams; exposed-fastener panels use gasketed screws through the sheet. The MBMA guidance published by IBHS notes that standing seam still uses through-fasteners at some end laps and penetrations. Inspect washers on screw-down roofs and inspect seams, laps, closures, and penetrations on both systems.
What is standing seam?
Standing seam is a metal roof system with raised panel joints and concealed main attachments. Clip and flange details control thermal movement. MBCI's mechanically seamed Double-Lok and snap-together LokSeam have different minimum slopes and installation details despite sharing the standing seam category.
Which metal roof lasts longest?
MCA projects more than 60 years for comparable low-slope, unpainted Galvalume standing seam roofs built using best practices. Its assessment inspected 14 roofs with up to 35 years in service. Use that as an assembly-specific projection, and budget component repairs from the condition of the actual roof.
What is oil canning?
Oil canning is visible waviness in the flat of a metal panel. MBCI's LokSeam manual states that it is not a cause for rejection and identifies narrower panels, heavier gauges, striations, and embossing as ways to minimize it. Distinguish appearance waviness from damage to panels or attachments.
How much more does a standing seam roof cost than exposed fastener?
Standing seam adds concealed attachments and, for mechanically seamed systems, field seaming to the work. Compare panel supply, clips, seaming, trim, access, and future joint and fastener repairs in the project estimate. The MBMA guidance published by IBHS describes the attachment and maintenance details behind that comparison.
What is stone-coated steel roofing?
Stone-coated steel is a steel roof panel surfaced with bonded stone granules to resemble tile, shake, or shingle. DECRA's March 2024 specifications set Shake XD at 3:12 minimum and Shingle XD at 4:12 as roof coverings. Fire, wind, and impact classifications follow the specified product and assembly.
What is the minimum slope for a metal roof?
MBCI specifies 1/4:12 for Double-Lok, 1/2:12 for PBR with lap sealant, and 3:12 for LokSeam. Everlast Metals specifies 1:12 for its PBR. DECRA specifies 3:12 for Shake XD and 4:12 for Shingle XD as roof coverings. Use the exact panel's minimum and installation details.
Do I need a solid deck under a metal roof?
MBCI permits structural LokSeam panels directly over purlins or bar joists; Construction Metal Products specifies solid substrates for its Nail Strip panel. DECRA's Shingle XD specification describes direct-to-deck installation. Support requirements and minimum slope are separate checks: match the selected panel's load tables, deck, underlayment, and slope details.
Is aluminum or steel better for a metal roof?
Steel, coated with Galvalume, is the common and lower-cost choice and holds up well inland. Aluminum costs more and dents easier but never red-rusts, which makes it the better pick on the coast and in corrosive, salt-laden air. Aluminum also moves more with heat. Match the metal to the exposure, not the price alone.
What do I do if my screw-down metal roof is leaking?
Locate the entry path before selecting the repair: washer and screw seating, side or end lap, closure, or penetration flashing. The MBMA guidance published by IBHS covers fastener, sealant, flashing, and corrosion maintenance. Repair damaged attachments and joints to the panel details; a coating does not restore stripped screw engagement or replace failed metal.
People also ask
Codes cited in this guide
This guide is written and reviewed against the published standards below. Always confirm the current adopted edition with the authority having jurisdiction.
Sources checked
- MBCI Double-Lok Technical/Installation Information, Rev. A, 07/22 Reopened with curl for final review 2026-11-06. DL-15 gives the 1/4:12 minimum; DL-25 states the below-minimum material-warranty exclusion. Also checked sliding clips, sealants, closures, penetrations, and the freezing-climate recommendations. Publication code confirms Rev. A, 07/22.
- MBCI LokSeam Technical/Installation Information, Rev. E, 12/25; pages marked Rev. 00.05 Reopened with curl for final review 2026-11-06. LS-5 and LS-6 confirm the 3:12 minimum, structural support over purlins or bar joists, 1.75 in seam, end seals, and oil-canning provisions. Back-cover publication code confirms Rev. E, 12/25; page revision is 00.05.
- MBCI PBR/PBU installation manual, hosted by Robertson Building Systems, August 2016 file; pages marked Rev. 00.00 Reopened with curl for final review 2026-11-06. PB-2 confirms 1/2:12 and field-applied tape sealant at side and end laps; PB-10 and PB-11 show attachment locations and lap details. August 2016 identifies the hosted file; pages are marked Rev. 00.00.
- MBCI PBR product page, Undated web page Opened with curl 2026-11-06. Current published PBR minimum slope and profile dimensions.
- Everlast Metals PBR sell sheet, Undated PDF Opened with curl 2026-11-06. PBR minimum slope differs from MBCI.
- DECRA Shake XD guide specification, March 2024 Opened with curl 2026-11-06. Roof-covering slope and decorative-use distinction.
- DECRA Shingle XD guide specification, March 2024 Opened with curl 2026-11-06. Roof-covering slope and decorative-use distinction.
- McElroy MM613 PVDF coating warranty without substrate, Rev. 6/23 Reopened with curl for final review 2026-11-06. Rev. 6/23 confirms 40-year adhesion and 30-year chalk/fade terms from shipment, minimum chalk rating 8, maximum 5 Hunter delta-E units, and the listed color exceptions. Also checked substrate-corrosion exclusion and the salt-spray/1,500-foot coastal exclusion.
- McElroy MM601 SMP and Crinkle Finish warranty without substrate, Rev. 11/23 Reopened with curl for final review 2026-11-06. Rev. 11/23 confirms 30-year terms from shipment, roof chalk rating 6, roof fade limit 7 Hunter delta-E units, and Charcoal/Matte Black roof fade limit 11. Also checked substrate-corrosion exclusion and the salt-spray/1,500-foot coastal exclusion.
- McElroy MM321 Kynar 500 PVDF vs SMP, 04/26 Opened with curl 2026-11-06. Manufacturer field photographs, including the Louisiana residence.
- Construction Metal Products Nail Strip panel, Undated web page Opened with curl 2026-11-06. Slotted securement flange allows expansion and contraction.
- Metal Construction Association, Service Life Assessment of Low-Slope Metal Roof Systems, public summary; listing published 10/2018 Opened with curl 2026-11-06. Public summary: 14 inspected roofs with up to 35 years of service; more-than-60-year projection for like-in-kind unpainted Galvalume standing seam roofs using best practices.
- MBMA Low-Slope Metal guidance, published by IBHS, undated web guide Opened with curl 2026-11-06. Concealed and through-fastened attachment, washers, standing seam penetrations and end laps, support, drainage, and maintenance.
- FGIA Publication Catalog, public AAMA 2605 scope Opened with curl 2026-11-06. AAMA 2605 scope covers organic coatings on aluminum extrusions and panels, with a coil coating appendix.
- Wheeling-Nippon Steel, Galvalume steel sheet product data, undated web page Opened with curl 2026-11-06. Galvalume composition and availability in AZ50 and AZ55 coating weights.
- New Zealand Metal Roofing Manufacturers, Code of Practice v26.09, section 7.3 Thermal Expansion and Contraction Opened with curl 2026-11-06. Steel expansion formula, relative aluminum expansion, and fastener/support response to thermal movement. Used for the material calculation, not as a US installation requirement.