Shower Pan & Roof Flood Test Privacy Policy
Effective date: July 17, 2026
Shower Pan & Roof Flood Test is an Android field-record app published by Anvilfield. Contact [email protected] for privacy or support questions.
Local records
Shower Pan & Roof Flood Test stores project names, area names, keyed readings, event notes, gauge photos, witness signatures, exports, backups, and settings on the device. The app does not run a backend, create accounts, or sync project records to Anvilfield.
Device features
The app may use device features when you choose them:
- Camera, for gauge and site photos.
- Local notifications, for reading-due and hold-end prompts.
- Boot-completed handling, to re-register local prompts after a device restart.
- Vibration, for haptic feedback on depth entry, verdict changes, and refusals.
- Android share and system file pickers, for user-directed exports, backups, and restores.
- Google Play in-app review, for an optional rating or review prompt. Google Play handles that surface; the app cannot read whether you entered a rating or review.
Exports and sharing
Exported PDF observation records, CSV files, status images, backups, and shared files leave the device only when you choose to export, share, print, or restore them through Android system surfaces. Those services are governed by their own policies.
No ads or analytics
No ads. No analytics. No telemetry. No account. No backend. No cloud sync. No remote config.
Shower Pan & Roof Flood Test does not sell personal data. It does not include third-party ads, telemetry, analytics SDKs, remote config, or an Anvilfield network service.
Local deletion
Local records remain until you delete the project in the app, clear the local project record in Settings, clear the app's Android storage, or uninstall the app. Copies already exported, printed, backed up, or shared outside the app remain with the destination you selected until you delete them there. Anvilfield has no app account or server-side project copy to delete.
Field-aid scope
This app is a field aid. It is not a structural-load authority, does not locate a leak, and does not replace electronic leak detection.
Children, changes, and contact
This professional field-record app is not directed to children. Anvilfield may update this policy when the app or its data practices change; a material change will be reflected in the effective date above.
For privacy questions, contact [email protected].