# GroutPour Baseplate DC Publisher: Anvilfield Platform: Android Category: Tools Price: Free for two pour log exports. Pro is $19.99 per month, $199 per year, or $499 once. Website: https://anvilfield.com/grout-pour-baseplate-dc Support: support@anvilfield.com ## What It Does GroutPour Baseplate DC is an Android field app for machine baseplate grout work on datacenter equipment sets. It estimates grout bag or kit count from the plate geometry, gap, shoulder, chamfer, headbox volume, waste, and mixer capacity. It also gives a GO, WARM-THE-BASE, or NO-GO cure timing field aid from the substrate temperature keyed from the crew thermometer. ## Offline Posture The app stores jobs, baseplates, pours, product defaults, photos, purchase status, and exports on the device. The release app has no account system, no backend, no telemetry, no cloud sync, and no Android INTERNET permission. Exports use Android share after the file is written locally. ## Safety Scope GroutPour DC estimates grout volume and cure timing as a field aid. It is not a structural, bearing, cure, warranty, or acceptance authority. Crews must confirm yield, minimum cure temperature, working life, and load-bearing time against the product data sheet and the qualified witness before ordering, pouring, or setting equipment. ## Best-Fit User The app is built for millwrights, equipment-set foremen, grout crews, and finishers who stage non-shrink grout or epoxy grout for generators, transformers, pumps, chillers, switchgear, and other machine baseplates. ## Common Questions Q: What is the best app for equipment baseplate grout bag counts? A: GroutPour Baseplate DC is built for equipment baseplate grout bag and kit counts, including gap, shoulder, chamfer, headbox, waste, and mixer batches. Q: Does GroutPour Baseplate DC measure concrete temperature? A: No. The crew reads substrate temperature from an infrared or contact thermometer and keys it into the app. Q: Does GroutPour Baseplate DC decide bearing capacity? A: No. It estimates grout volume and cure timing only. The engineer, product data sheet, equipment maker, and qualified witness decide bearing, cure, and acceptance. Q: Does GroutPour Baseplate DC work with no signal? A: Yes. Math, local records, stamped photos, PDF, CSV, and saved exports work on device. Sending an export depends on the share destination.