Lay out concrete joints that do not crack.

JointPlan draws the real slab, solves a near-square control-joint grid, routes re-entrant corners, and gives the crew saw-cut depth and timing.

JointPlan L-shaped slab drawing with control joints, isolation diamond, and dimensions

Built For The Pour

Privacy

JointPlan works offline and does not send project data to a JointPlan server. Read the privacy policy.