# Anvilfield - codes & standards corpus The 181 published codes and standards cited across the Anvilfield field guides, each with the exact sections referenced and the guides that apply them. Quote with attribution to Anvilfield (https://anvilfield.com/standards/). ## NEC - National Fire Protection Association https://anvilfield.com/standards/nec/ The U.S. standard for electrical wiring and installation, published by the NFPA as NFPA 70. Sections cited: NEC 100, NEC 100.2, NEC 100.8, NEC 101.8, NEC 107.40, NEC 109.5, NEC 109.50, NEC 110, NEC 110.3, NEC 110.3(B), NEC 110.5(H), NEC 110.9, NEC 110.10, NEC 110.14, NEC 110.14(C), NEC 110.14(D), NEC 110.15, NEC 110.21(B), NEC 110.24, NEC 110.24(B), NEC 110.25, NEC 110.26, NEC 110.26(A), NEC 110.26(C), NEC 110.26(D), NEC 110.26(E), NEC 112.5, NEC 120, NEC 120.6, NEC 120.7, NEC 120.7(B), NEC 120.7(C)(1), NEC 123.93, NEC 124.54, NEC 125.66, NEC 126.315, NEC 130, NEC 130.5, NEC 130.5(F), NEC 130.5(H), NEC 130.7, NEC 132.7, NEC 133.3, NEC 142.5, NEC 151.711, NEC 156.8, NEC 161.28, NEC 169.23, NEC 172.50, NEC 173.6, NEC 175.731, NEC 180.6, NEC 180.555, NEC 183.20, NEC 186.27, NEC 186.82, NEC 195.20, NEC 200, NEC 200.6, NEC 206.2, NEC 210, NEC 210.4, NEC 210.4(B), NEC 210.5, NEC 210.8, NEC 210.8(A), NEC 210.8(B), NEC 210.9, NEC 210.12, NEC 210.12(E), NEC 210.19, NEC 210.19(A), NEC 210.20, NEC 210.20(A), NEC 210.21(B), NEC 211.5, NEC 215, NEC 215.2, NEC 215.2(A), NEC 215.3, NEC 215.10, NEC 215.12, NEC 220, NEC 220.12, NEC 220.14, NEC 220.42, NEC 220.43, NEC 220.52, NEC 220.53, NEC 220.54, NEC 220.55, NEC 220.56, NEC 220.60, NEC 220.61, NEC 220.70, NEC 220.82, NEC 220.87, NEC 224.489, NEC 225.30, NEC 225.31, NEC 225.32, NEC 227.466, NEC 230, NEC 230.24, NEC 230.42, NEC 230.67, NEC 230.70, NEC 230.71, NEC 230.85, NEC 230.85(A), NEC 230.85(B), NEC 230.85(C), NEC 230.85(E), NEC 230.95, NEC 230.95(C), NEC 234.5, NEC 240, NEC 240.4, NEC 240.4(B), NEC 240.4(D), NEC 240.6, NEC 240.13, NEC 240.15, NEC 240.15(B), NEC 240.21, NEC 240.21(B), NEC 240.21(B)(1), NEC 240.21(B)(2), NEC 240.21(B)(3), NEC 240.21(B)(4), NEC 240.21(B)(5), NEC 240.21(C), NEC 240.21(C)(2), NEC 240.21(C)(6), NEC 240.24, NEC 240.67, NEC 240.86, NEC 240.86(C), NEC 240.87, NEC 242, NEC 248.0, NEC 249.09, NEC 249.088, NEC 250, NEC 250.4, NEC 250.4(A), NEC 250.4(A)(1), NEC 250.4(A)(5), NEC 250.6, NEC 250.6(A), NEC 250.6(B), NEC 250.6(C), NEC 250.12, NEC 250.24, NEC 250.24(A)(5), NEC 250.24(B), NEC 250.24(C), NEC 250.28, NEC 250.30, NEC 250.30(A), NEC 250.30(A)(1), NEC 250.30(A)(4), NEC 250.30(A)(5), NEC 250.32, NEC 250.32(A), NEC 250.32(B)(1), NEC 250.32(E), NEC 250.34, NEC 250.50, NEC 250.52, NEC 250.52(A)(1), NEC 250.52(A)(3), NEC 250.52(A)(4), NEC 250.53, NEC 250.53(A)(2), NEC 250.53(A)(3), NEC 250.53(A)(4), NEC 250.53(C), NEC 250.53(D)(1), NEC 250.53(D)(2), NEC 250.53(F), NEC 250.60, NEC 250.64, NEC 250.64(A), NEC 250.64(C), NEC 250.64(E), NEC 250.66, NEC 250.66(A), NEC 250.66(B), NEC 250.66(C), NEC 250.68, NEC 250.68(B), NEC 250.68(C)(1), NEC 250.70, NEC 250.94, NEC 250.96, NEC 250.96(A), NEC 250.96(B), NEC 250.98, NEC 250.102, NEC 250.102(D), NEC 250.104, NEC 250.104(A), NEC 250.104(A)(1), NEC 250.104(A)(2), NEC 250.104(A)(3), NEC 250.106, NEC 250.118, NEC 250.119, NEC 250.122, NEC 250.122(B), NEC 250.122(C), NEC 250.122(F), NEC 250.146, NEC 250.146(D), NEC 250.194, NEC 272.7, NEC 275.5, NEC 275.50, NEC 276.92, NEC 285, NEC 293.1, NEC 300.4, NEC 300.4(G), NEC 300.5, NEC 300.6, NEC 300.7, NEC 300.13, NEC 300.13(B), NEC 300.20(A), NEC 310, NEC 310.10, NEC 310.10(G), NEC 310.10(H), NEC 310.12, NEC 310.15, NEC 310.15(B), NEC 310.15(C), NEC 310.15(C)(1), NEC 310.15(E), NEC 310.16, NEC 310.60, NEC 312.6, NEC 314, NEC 314.2, NEC 314.16, NEC 314.16(A), NEC 314.16(B), NEC 314.16(C), NEC 314.23, NEC 314.28, NEC 314.71, NEC 320, NEC 326.40, NEC 330, NEC 330.2, NEC 334, NEC 334.80, NEC 342, NEC 342.26, NEC 344, NEC 344.26, NEC 348, NEC 350, NEC 352, NEC 352.26, NEC 352.44, NEC 356, NEC 358, NEC 358.26, NEC 366, NEC 366.6, NEC 368, NEC 368.17(A), NEC 368.17(B), NEC 376, NEC 376.22, NEC 376.22(A), NEC 376.22(B), NEC 378, NEC 392, NEC 392.18, NEC 392.18(F), NEC 392.22, NEC 392.22(B), NEC 392.30, NEC 392.60, NEC 392.80, NEC 394, NEC 400.2, NEC 402.50, NEC 403.3, NEC 404, NEC 404.2, NEC 404.2(C), NEC 404.9, NEC 406, NEC 406.3, NEC 406.3(D), NEC 406.9, NEC 406.12, NEC 408, NEC 408.3(E), NEC 408.4, NEC 408.40, NEC 408.41, NEC 409, NEC 409.22, NEC 409.110, NEC 410, NEC 411, NEC 427, NEC 430, NEC 430.5, NEC 430.6, NEC 430.6(A), NEC 430.22, NEC 430.24, NEC 430.32, NEC 430.52, NEC 430.62, NEC 430.98, NEC 430.99, NEC 430.102, NEC 430.102(A), NEC 430.102(B), NEC 430.107, NEC 430.110, NEC 430.122, NEC 430.248, NEC 430.250, NEC 431.96, NEC 431.97(d), NEC 440, NEC 440.10, NEC 440.14, NEC 445, NEC 445.20, NEC 448.831, NEC 450, NEC 450.3, NEC 450.3(B), NEC 450.5, NEC 450.9, NEC 450.21, NEC 460, NEC 460.15, NEC 465.882, NEC 480, NEC 491.50, NEC 500, NEC 501, NEC 501.15, NEC 502, NEC 503, NEC 505, NEC 506, NEC 514.50, NEC 517, NEC 533.3, NEC 555, NEC 568.0, NEC 568.1, NEC 568.2, NEC 568.3, NEC 571.43, NEC 584.62, NEC 587.50, NEC 590, NEC 590.6, NEC 590.6(A), NEC 600, NEC 600.6, NEC 610, NEC 610.43(A), NEC 622.448, NEC 625, NEC 625.4, NEC 625.5, NEC 625.14, NEC 625.22, NEC 625.41, NEC 625.42, NEC 625.42(A), NEC 625.43, NEC 625.48, NEC 625.54, NEC 645, NEC 645.5, NEC 645.10, NEC 646, NEC 652.8, NEC 670.5, NEC 675, NEC 680, NEC 680.23, NEC 680.23(A)(5), NEC 680.26, NEC 680.26(B), NEC 680.26(B)(2), NEC 685, NEC 690, NEC 690.7, NEC 690.8, NEC 690.8(A), NEC 690.8(B), NEC 690.11, NEC 690.12, NEC 690.56, NEC 690.56(C), NEC 695, NEC 700, NEC 700.3, NEC 700.4(B), NEC 700.12, NEC 700.12(H), NEC 700.27, NEC 700.28, NEC 700.32, NEC 701, NEC 701.18, NEC 701.32, NEC 702, NEC 702.7, NEC 705, NEC 705.12, NEC 706, NEC 708, NEC 708.5, NEC 708.54, NEC 712.88, NEC 724.35, NEC 725, NEC 725.14, NEC 725.25, NEC 725.136, NEC 725.144, NEC 727.50, NEC 749.33, NEC 750, NEC 750.30, NEC 760, NEC 770, NEC 790.15, NEC 800, NEC 800.25, NEC 800.113, NEC 800.179, NEC 802.3, NEC 828.57, NEC 840, NEC 896.1, NEC Table 110.26, NEC Table 220.55, NEC Table 220.56, NEC Table 250.66, NEC Table 250.102, NEC Table 250.122, NEC Table 300.5, NEC Table 310.15, NEC Table 310.16, NEC Table 312.6, NEC Table 314.16, NEC Table 392.22, NEC Table 392.60, NEC Table 430.7, NEC Table 430.250, NEC Table 450.3, NEC Table 725.144 Applied in 181 Anvilfield field guides, including: - AEGCP field guide [https://anvilfield.com/field-guides/electrical/assured-equipment-grounding-aegcp/] - ATS commissioning field guide [https://anvilfield.com/field-guides/electrical/automatic-transfer-switch-commissioning/] - Aboveground tank inspection [https://anvilfield.com/field-guides/plumbing/aboveground-storage-tank-inspection-api-653-sti-sp001/] - Aluminum branch wiring [https://anvilfield.com/field-guides/electrical/aluminum-branch-wiring-hazards-remediation/] - Arc energy reduction methods [https://anvilfield.com/field-guides/electrical/arc-energy-reduction-methods-240-87/] - Arc flash study and labels [https://anvilfield.com/field-guides/electrical/arc-flash-study-labels/] - Automatic gate operator field guide [https://anvilfield.com/field-guides/electrical/automatic-gate-operator-installation/] - Available fault current study [https://anvilfield.com/field-guides/electrical/short-circuit-available-fault-current-study/] - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Boat dock and marina construction [https://anvilfield.com/field-guides/landscaping/boat-dock-marina-construction/] - Buck-boost transformer guide [https://anvilfield.com/field-guides/electrical/buck-boost-transformer-voltage-adjustment/] - Busway installation field guide [https://anvilfield.com/field-guides/electrical/busway-busduct-installation/] ## OSHA 1926 - U.S. OSHA https://anvilfield.com/standards/osha-1926/ OSHA construction industry safety and health standards (29 CFR Part 1926). Sections cited: 29 CFR 1926, 29 CFR 1926.62, 29 CFR 1926.404, 29 CFR 1926.416, 29 CFR 1926.417, 29 CFR 1926.450, 29 CFR 1926.501, 29 CFR 1926.502, 29 CFR 1926.651, 29 CFR 1926.701, 29 CFR 1926.706, 29 CFR 1926.758, 29 CFR 1926.1101, 29 CFR 1926.1153, 29 CFR 1926.1202, 29 CFR 1926.1203, 29 CFR 1926.1402, 29 CFR 1926.1417, 29 CFR 1926.1425, OSHA 1926 Subpart AA, OSHA 1926 Subpart CC, OSHA 1926 Subpart K, OSHA 1926 Subpart R, OSHA 1926 Subpart T, OSHA 1926.25, OSHA 1926.32, OSHA 1926.52, OSHA 1926.62, OSHA 1926.251, OSHA 1926.404, OSHA 1926.405, OSHA 1926.416, OSHA 1926.500, OSHA 1926.501, OSHA 1926.502, OSHA 1926.704, OSHA 1926.706, OSHA 1926.756, OSHA 1926.758, OSHA 1926.760, OSHA 1926.1053, OSHA 1926.1101, OSHA 1926.1153, OSHA 1926.1402, OSHA 1926.1408, OSHA 1926.1412 Applied in 74 Anvilfield field guides, including: - AEGCP field guide [https://anvilfield.com/field-guides/electrical/assured-equipment-grounding-aegcp/] - Asbestos abatement procedures [https://anvilfield.com/field-guides/concrete/asbestos-abatement-removal-procedures/] - Building demolition planning [https://anvilfield.com/field-guides/concrete/building-demolition-methods-planning/] - C1583 pull-off interpretation [https://anvilfield.com/field-guides/concrete/concrete-repair-pull-off-testing-c1583/] - CMU block wall construction [https://anvilfield.com/field-guides/concrete/concrete-masonry-cmu-block-wall-construction/] - Calcium silicate board [https://anvilfield.com/field-guides/concrete/calcium-silicate-board/] - Cell tower and antenna install [https://anvilfield.com/field-guides/electrical/cell-tower-construction-antenna-installation/] - Chloride profiles and service life [https://anvilfield.com/field-guides/concrete/concrete-chloride-profile-service-life/] - Coastal metal roof corrosion checks [https://anvilfield.com/field-guides/roofing/marine-exposure-roof-corrosion-survey/] - Commercial RTU replacement cost by ton [https://anvilfield.com/field-guides/hvac/rtu-replacement-cost-by-ton-installed-scope/] - Commercial exterior paint takeoff with PCA P10 [https://anvilfield.com/field-guides/concrete/commercial-exterior-paint-quantity-pca-p10/] - Commercial exterior repaint intervals [https://anvilfield.com/field-guides/concrete/commercial-exterior-repaint-interval-table/] - Commercial skylight replacement cost [https://anvilfield.com/field-guides/roofing/commercial-skylight-replacement-cost-quantity/] - Commissioning subcontract labor and retests [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-subcontract-scope-retests/] - Concealed-cavity drying verification [https://anvilfield.com/field-guides/plumbing/concealed-cavity-drying-verification/] ## IPC - International Code Council https://anvilfield.com/standards/ipc/ International Plumbing Code. Applied in 65 Anvilfield field guides, including: - AAV and island vent guide [https://anvilfield.com/field-guides/plumbing/air-admittance-valve-island-vent/] - Backflow assembly types [https://anvilfield.com/field-guides/plumbing/backflow-preventer-assembly-types/] - Backflow failed test repair guide [https://anvilfield.com/field-guides/plumbing/backflow-failed-test-repair-checklist/] - Backflow test procedure guide [https://anvilfield.com/field-guides/plumbing/backflow-assembly-test-procedure/] - Backwater valve field guide [https://anvilfield.com/field-guides/plumbing/backwater-valve-sewer-backup-protection/] - Blue roof controlled-flow drainage [https://anvilfield.com/field-guides/roofing/blue-roof-controlled-flow-drainage/] - Booster and PRV system guide [https://anvilfield.com/field-guides/plumbing/water-pressure-booster-prv-system/] - Building sewer lateral field guide [https://anvilfield.com/field-guides/plumbing/sanitary-building-sewer-lateral-connection/] - CIPP lateral acceptance and reinstatement [https://anvilfield.com/field-guides/plumbing/sewer-lateral-lining-acceptance-reinstatement/] - Commercial ice machine field guide [https://anvilfield.com/field-guides/hvac/commercial-ice-machine-installation-service/] - Condensate neutralizer field guide [https://anvilfield.com/field-guides/hvac/condensate-neutralizer-condensing-appliance/] - DWV venting and pipe sizing guide [https://anvilfield.com/field-guides/plumbing/dwv-venting-pipe-sizing/] - Drain cleaning field guide [https://anvilfield.com/field-guides/plumbing/drain-cleaning-jetting-snaking/] - Fixture carriers and supports guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-carriers-supports/] - Fixture rough-in and setting guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-rough-in-setting/] ## Uptime Institute - Standards body https://anvilfield.com/standards/uptime-institute/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 64 Anvilfield field guides, including: - AI GPU rack readiness [https://anvilfield.com/field-guides/datacenter/ai-gpu-rack-power-cooling-readiness/] - AI cluster commissioning [https://anvilfield.com/field-guides/datacenter/ai-cluster-commissioning-burn-in/] - Adiabatic and evaporative cooling [https://anvilfield.com/field-guides/datacenter/data-center-adiabatic-evaporative-cooling/] - Airflow management and blanking panels [https://anvilfield.com/field-guides/datacenter/data-center-airflow-management-blanking-panels/] - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - CDU commissioning [https://anvilfield.com/field-guides/datacenter/cdu-coolant-distribution-unit-commissioning/] - CRAC/CRAH airflow setup [https://anvilfield.com/field-guides/datacenter/crac-crah-static-pressure-airflow/] - Colocation fit-out field guide [https://anvilfield.com/field-guides/datacenter/colocation-cage-cabinet-fit-out/] - Colocation usable power evidence [https://anvilfield.com/field-guides/datacenter/colocation-power-capacity-evidence-register/] - Commissioning duration benchmarks [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-duration-benchmark/] - Cooling ride-through thermal buffer [https://anvilfield.com/field-guides/datacenter/data-center-cooling-ride-through-thermal-buffer/] - DCIM and asset management [https://anvilfield.com/field-guides/datacenter/dcim-monitoring-asset-management/] - Data center MOP SOP EOP [https://anvilfield.com/field-guides/datacenter/data-center-mop-sop-eop-procedures/] - Data center PM program [https://anvilfield.com/field-guides/datacenter/data-center-maintenance-management-pm-program/] ## ASHRAE TC 9.9 - ASHRAE https://anvilfield.com/standards/ashrae-tc-9-9/ A published standard from ASHRAE, referenced across the Anvilfield field guides below. Applied in 62 Anvilfield field guides, including: - AI GPU rack readiness [https://anvilfield.com/field-guides/datacenter/ai-gpu-rack-power-cooling-readiness/] - AI cluster commissioning [https://anvilfield.com/field-guides/datacenter/ai-cluster-commissioning-burn-in/] - Adiabatic and evaporative cooling [https://anvilfield.com/field-guides/datacenter/data-center-adiabatic-evaporative-cooling/] - Air duct cleaning field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-cleaning-nadca-iaq/] - Air filtration and MERV field guide [https://anvilfield.com/field-guides/hvac/air-filtration-merv-iaq/] - Airflow management and blanking panels [https://anvilfield.com/field-guides/datacenter/data-center-airflow-management-blanking-panels/] - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - CDU commissioning [https://anvilfield.com/field-guides/datacenter/cdu-coolant-distribution-unit-commissioning/] - CRAC/CRAH airflow setup [https://anvilfield.com/field-guides/datacenter/crac-crah-static-pressure-airflow/] - Centrifugal chiller surge control [https://anvilfield.com/field-guides/hvac/centrifugal-chiller-surge-control/] - Chilled beam commissioning [https://anvilfield.com/field-guides/hvac/chilled-beam-active-passive-commissioning/] - Cold-plate retrofit acceptance [https://anvilfield.com/field-guides/datacenter/cold-plate-retrofit-oem-acceptance-responsibility/] - Colocation fit-out field guide [https://anvilfield.com/field-guides/datacenter/colocation-cage-cabinet-fit-out/] - Conductor ampacity derating, NEC [https://anvilfield.com/field-guides/electrical/conductor-ampacity-derating-nec/] ## IBC - International Code Council https://anvilfield.com/standards/ibc/ International Building Code. Applied in 61 Anvilfield field guides, including: - Access control system field guide [https://anvilfield.com/field-guides/electrical/access-control-system-installation/] - Adhesive anchor installation [https://anvilfield.com/field-guides/concrete/adhesive-epoxy-anchor-installation/] - Anchor bolt and baseplate grout QA [https://anvilfield.com/field-guides/datacenter/anchor-bolt-baseplate-grout-qa/] - Blue roof controlled-flow drainage [https://anvilfield.com/field-guides/roofing/blue-roof-controlled-flow-drainage/] - Building movement joint systems [https://anvilfield.com/field-guides/concrete/building-expansion-movement-joint-systems/] - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Calcium silicate board [https://anvilfield.com/field-guides/concrete/calcium-silicate-board/] - Commercial lighting design [https://anvilfield.com/field-guides/electrical/commercial-lighting-design-footcandles-controls/] - Commercial roof replacement cost in 2026 [https://anvilfield.com/field-guides/roofing/commercial-roof-replacement-cost-2026/] - Commercial wall cladding [https://anvilfield.com/field-guides/roofing/wall-cladding-systems-commercial-buildings/] - Concrete anchor installation [https://anvilfield.com/field-guides/concrete/concrete-anchor-fastener-installation/] - Construction QA/QC program [https://anvilfield.com/field-guides/concrete/construction-quality-control-qa-qc-program/] - Curtain wall and glazing [https://anvilfield.com/field-guides/concrete/curtain-wall-glazing-storefront-installation/] - Data center seismic anchoring field guide [https://anvilfield.com/field-guides/datacenter/data-center-seismic-anchoring-equipment/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] ## UPC - International Code Council https://anvilfield.com/standards/upc/ Uniform Plumbing Code. Applied in 61 Anvilfield field guides, including: - 400G and 800G fiber reuse [https://anvilfield.com/field-guides/datacenter/data-center-fiber-reuse-qualification-400g-800g/] - AAV and island vent guide [https://anvilfield.com/field-guides/plumbing/air-admittance-valve-island-vent/] - Backflow assembly types [https://anvilfield.com/field-guides/plumbing/backflow-preventer-assembly-types/] - Backflow failed test repair guide [https://anvilfield.com/field-guides/plumbing/backflow-failed-test-repair-checklist/] - Backflow test procedure guide [https://anvilfield.com/field-guides/plumbing/backflow-assembly-test-procedure/] - Booster and PRV system guide [https://anvilfield.com/field-guides/plumbing/water-pressure-booster-prv-system/] - Building sewer lateral field guide [https://anvilfield.com/field-guides/plumbing/sanitary-building-sewer-lateral-connection/] - Commercial ice machine field guide [https://anvilfield.com/field-guides/hvac/commercial-ice-machine-installation-service/] - Condensate neutralizer field guide [https://anvilfield.com/field-guides/hvac/condensate-neutralizer-condensing-appliance/] - DWV venting and pipe sizing guide [https://anvilfield.com/field-guides/plumbing/dwv-venting-pipe-sizing/] - Data center fiber types [https://anvilfield.com/field-guides/datacenter/data-center-fiber-cabling-types-singlemode-multimode/] - Drain cleaning field guide [https://anvilfield.com/field-guides/plumbing/drain-cleaning-jetting-snaking/] - Fiber end-face inspection and cleaning [https://anvilfield.com/field-guides/datacenter/fiber-connector-end-face-inspection-cleaning/] - Fixture carriers and supports guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-carriers-supports/] - Fixture rough-in and setting guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-rough-in-setting/] ## OSHA 1910 - U.S. OSHA https://anvilfield.com/standards/osha-1910/ OSHA general industry safety and health standards (29 CFR Part 1910). Sections cited: 29 CFR 1910, 29 CFR 1910.119, 29 CFR 1910.134, 29 CFR 1910.146, 29 CFR 1910.147, 29 CFR 1910.178, 29 CFR 1910.212, 29 CFR 1910.242, 29 CFR 1910.269, 29 CFR 1910.272, 29 CFR 1910.304, 29 CFR 1910.307, 29 CFR 1910.333, 29 CFR 1910.334, 29 CFR 1910.1030, 29 CFR 1910.1053, OSHA 1910.26, OSHA 1910.28, OSHA 1910.95, OSHA 1910.134, OSHA 1910.137, OSHA 1910.146, OSHA 1910.147, OSHA 1910.212, OSHA 1910.253, OSHA 1910.268, OSHA 1910.269, OSHA 1910.272, OSHA 1910.307, OSHA 1910.331, OSHA 1910.332, OSHA 1910.333, OSHA 1910.334, OSHA 1910.1030 Applied in 52 Anvilfield field guides, including: - 800 V DC fault protection [https://anvilfield.com/field-guides/datacenter/data-center-800v-dc-fault-protection-2026/] - ASHRAE 180 and OEM RTU schedules [https://anvilfield.com/field-guides/hvac/rtu-maintenance-interval-ashrae180-oem-crosswalk/] - Aboveground tank inspection [https://anvilfield.com/field-guides/plumbing/aboveground-storage-tank-inspection-api-653-sti-sp001/] - Air locks and low-flow diagnosis [https://anvilfield.com/field-guides/datacenter/liquid-cooling-air-lock-low-flow-diagnosis/] - Arc flash PPE and clothing [https://anvilfield.com/field-guides/electrical/arc-flash-ppe-categories-clothing/] - Arc flash study and labels [https://anvilfield.com/field-guides/electrical/arc-flash-study-labels/] - Asbestos abatement procedures [https://anvilfield.com/field-guides/concrete/asbestos-abatement-removal-procedures/] - BESS thermal acceptance [https://anvilfield.com/field-guides/hvac/bess-container-thermal-uniformity-acceptance/] - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Biohazard and trauma cleanup guide [https://anvilfield.com/field-guides/plumbing/biohazard-trauma-sewage-cleanup/] - CRAC EC fan retrofit acceptance [https://anvilfield.com/field-guides/hvac/crac-ec-fan-retrofit-acceptance/] - Cell tower and antenna install [https://anvilfield.com/field-guides/electrical/cell-tower-construction-antenna-installation/] - Cold plate blockage diagnosis [https://anvilfield.com/field-guides/datacenter/cold-plate-blockage-pressure-drop-diagnosis/] - Cold storage and refrigerated warehouse design [https://anvilfield.com/field-guides/hvac/cold-storage-refrigerated-warehouse-design/] - Compressed gas cylinder safety [https://anvilfield.com/field-guides/concrete/compressed-gas-cylinder-safety-handling/] ## ASHRAE 90.1 - ASHRAE https://anvilfield.com/standards/ashrae-90-1/ Energy Standard for Buildings Except Low-Rise Residential Buildings. Applied in 51 Anvilfield field guides, including: - Air curtain field guide [https://anvilfield.com/field-guides/hvac/air-curtain-door-heater-systems/] - Air handling unit (AHU) field guide [https://anvilfield.com/field-guides/hvac/air-handling-unit-ahu-components-operation/] - BAS and DDC controls field guide [https://anvilfield.com/field-guides/hvac/hvac-bas-ddc-controls-fundamentals/] - Boiler startup commissioning [https://anvilfield.com/field-guides/hvac/boiler-startup-commissioning/] - Building insulation and air sealing [https://anvilfield.com/field-guides/roofing/building-insulation-air-sealing-envelope/] - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - Centrifugal chiller surge control [https://anvilfield.com/field-guides/hvac/centrifugal-chiller-surge-control/] - Chilled water pumping field guide [https://anvilfield.com/field-guides/hvac/chilled-water-pumping-primary-secondary-variable/] - Chilled water vs DX cooling [https://anvilfield.com/field-guides/hvac/chilled-water-vs-dx-cooling-comparison/] - Chiller plant sequencing optimization [https://anvilfield.com/field-guides/hvac/chiller-plant-sequencing-optimization/] - Chiller plant startup commissioning [https://anvilfield.com/field-guides/hvac/chiller-plant-startup-commissioning/] - Chiller types and selection [https://anvilfield.com/field-guides/hvac/chiller-types-selection-centrifugal-screw-scroll/] - Commercial exhaust ventilation guide [https://anvilfield.com/field-guides/hvac/commercial-exhaust-fan-ventilation/] - Commercial lighting design [https://anvilfield.com/field-guides/electrical/commercial-lighting-design-footcandles-controls/] - Cool roof reflectivity and energy [https://anvilfield.com/field-guides/roofing/cool-roof-reflectivity-energy/] ## ACI 318 - American Concrete Institute https://anvilfield.com/standards/aci-318/ Building Code Requirements for Structural Concrete. Sections cited: ACI 318-19 Applied in 42 Anvilfield field guides, including: - Adhesive anchor installation [https://anvilfield.com/field-guides/concrete/adhesive-epoxy-anchor-installation/] - Air entrainment [https://anvilfield.com/field-guides/concrete/air-entrainment-freeze-thaw-durability/] - Anchor bolt and baseplate grout QA [https://anvilfield.com/field-guides/datacenter/anchor-bolt-baseplate-grout-qa/] - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete admixtures [https://anvilfield.com/field-guides/concrete/concrete-admixtures-types-guide/] - Concrete anchor installation [https://anvilfield.com/field-guides/concrete/concrete-anchor-fastener-installation/] - Concrete crack types and causes [https://anvilfield.com/field-guides/concrete/concrete-crack-types-causes-prevention/] - Concrete curb, gutter, and sidewalk [https://anvilfield.com/field-guides/paving/concrete-curb-gutter-sidewalk-flatwork/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete diagnostic test selection [https://anvilfield.com/field-guides/concrete/concrete-diagnostic-test-selection/] - Concrete driveway installation [https://anvilfield.com/field-guides/concrete/concrete-driveway-installation/] - Concrete estimating and takeoff [https://anvilfield.com/field-guides/concrete/concrete-estimating-takeoff/] - Concrete maturity method [https://anvilfield.com/field-guides/concrete/concrete-maturity-method-temperature-monitoring/] - Concrete scanning before you drill [https://anvilfield.com/field-guides/datacenter/concrete-scanning-gpr-before-drill/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] ## TIA-942 - Standards body https://anvilfield.com/standards/tia-942/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 40 Anvilfield field guides, including: - AI GPU rack readiness [https://anvilfield.com/field-guides/datacenter/ai-gpu-rack-power-cooling-readiness/] - AI cluster commissioning [https://anvilfield.com/field-guides/datacenter/ai-cluster-commissioning-burn-in/] - Airflow management and blanking panels [https://anvilfield.com/field-guides/datacenter/data-center-airflow-management-blanking-panels/] - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Colocation fit-out field guide [https://anvilfield.com/field-guides/datacenter/colocation-cage-cabinet-fit-out/] - Cross-connect patch records [https://anvilfield.com/field-guides/datacenter/cross-connect-patch-record-mmr/] - DCIM and asset management [https://anvilfield.com/field-guides/datacenter/dcim-monitoring-asset-management/] - Data center airflow management [https://anvilfield.com/field-guides/datacenter/datacenter-cooling-airflow-overview/] - Data center buildout phases [https://anvilfield.com/field-guides/datacenter/data-center-construction-buildout-phases/] - Data center cabinet and rack types [https://anvilfield.com/field-guides/datacenter/data-center-cabinet-rack-types-selection/] - Data center cooling system types [https://anvilfield.com/field-guides/datacenter/data-center-cooling-systems-types-overview/] - Data center disaster recovery [https://anvilfield.com/field-guides/datacenter/data-center-disaster-recovery-business-continuity/] - Data center fiber types [https://anvilfield.com/field-guides/datacenter/data-center-fiber-cabling-types-singlemode-multimode/] - Data center physical security field guide [https://anvilfield.com/field-guides/datacenter/data-center-physical-security-access-control/] ## NFPA 70E - National Fire Protection Association https://anvilfield.com/standards/nfpa-70e/ Standard for Electrical Safety in the Workplace, covering arc-flash and shock protection. Applied in 38 Anvilfield field guides, including: - Arc energy reduction methods [https://anvilfield.com/field-guides/electrical/arc-energy-reduction-methods-240-87/] - Arc flash PPE and clothing [https://anvilfield.com/field-guides/electrical/arc-flash-ppe-categories-clothing/] - Arc flash study and labels [https://anvilfield.com/field-guides/electrical/arc-flash-study-labels/] - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Coordination study field guide [https://anvilfield.com/field-guides/datacenter/protective-relay-coordination-study/] - Data center MOP SOP EOP [https://anvilfield.com/field-guides/datacenter/data-center-mop-sop-eop-procedures/] - Data center PM program [https://anvilfield.com/field-guides/datacenter/data-center-maintenance-management-pm-program/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - Data center buildout phases [https://anvilfield.com/field-guides/datacenter/data-center-construction-buildout-phases/] - Data center decommissioning [https://anvilfield.com/field-guides/datacenter/data-center-decommissioning-equipment-removal/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - Disconnect switch types and requirements [https://anvilfield.com/field-guides/electrical/electrical-disconnect-switch-types-requirements/] - Distribution equipment guide [https://anvilfield.com/field-guides/electrical/distribution-equipment-switchgear-switchboard-panelboard/] ## ASCE 7 - American Society of Civil Engineers https://anvilfield.com/standards/asce-7/ Minimum Design Loads and Associated Criteria for Buildings and Other Structures. Applied in 36 Anvilfield field guides, including: - Ballasted roof systems [https://anvilfield.com/field-guides/roofing/ballasted-roof-system-installation/] - Blue roof controlled-flow drainage [https://anvilfield.com/field-guides/roofing/blue-roof-controlled-flow-drainage/] - Boat dock and marina construction [https://anvilfield.com/field-guides/landscaping/boat-dock-marina-construction/] - Data center cabinet and rack types [https://anvilfield.com/field-guides/datacenter/data-center-cabinet-rack-types-selection/] - Data center seismic anchoring field guide [https://anvilfield.com/field-guides/datacenter/data-center-seismic-anchoring-equipment/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - EPDM rubber roof installation [https://anvilfield.com/field-guides/roofing/epdm-rubber-roof-installation/] - Electric sign installation [https://anvilfield.com/field-guides/electrical/electric-sign-channel-letter-installation/] - Ice dams and snow load [https://anvilfield.com/field-guides/roofing/roof-ice-dam-snow-load-management/] - Interior storm drainage piping sizing [https://anvilfield.com/field-guides/plumbing/storm-drainage-interior-piping-sizing/] - Metal roof types compared [https://anvilfield.com/field-guides/roofing/metal-roof-types-comparison/] - Pergola and shade structure guide [https://anvilfield.com/field-guides/landscaping/pergola-gazebo-shade-structure-construction/] - Pipe hangers and seismic bracing guide [https://anvilfield.com/field-guides/plumbing/pipe-hangers-supports-seismic-bracing/] - Prefab module seismic certification [https://anvilfield.com/field-guides/datacenter/seismic-certification-prefab-data-center-modules/] - Rack readiness field guide [https://anvilfield.com/field-guides/datacenter/rack-readiness-floor-load-layout/] ## NFPA 110 - National Fire Protection Association https://anvilfield.com/standards/nfpa-110/ Standard for Emergency and Standby Power Systems. Applied in 30 Anvilfield field guides, including: - ATS commissioning field guide [https://anvilfield.com/field-guides/electrical/automatic-transfer-switch-commissioning/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Data center PM program [https://anvilfield.com/field-guides/datacenter/data-center-maintenance-management-pm-program/] - Data center buildout phases [https://anvilfield.com/field-guides/datacenter/data-center-construction-buildout-phases/] - Data center commissioning levels [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-levels-process/] - Data center commissioning process [https://anvilfield.com/field-guides/datacenter/datacenter-commissioning-operations-overview/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center generator sizing [https://anvilfield.com/field-guides/datacenter/data-center-generator-sizing-selection/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - Elevator modernization and maintenance [https://anvilfield.com/field-guides/electrical/elevator-modernization-maintenance/] - Emergency and egress lighting [https://anvilfield.com/field-guides/electrical/emergency-egress-lighting-inverter/] - Emergency and standby power systems [https://anvilfield.com/field-guides/electrical/emergency-standby-power-systems-nec-700/] - Fire pump acceptance test [https://anvilfield.com/field-guides/datacenter/fire-pump-acceptance-test/] - Fire pump and standpipe guide [https://anvilfield.com/field-guides/plumbing/fire-pump-standpipe-system-design/] - Generator acceptance and turnover [https://anvilfield.com/field-guides/datacenter/generator-acceptance-loadbank-turnover/] ## ASHRAE 62.1 - ASHRAE https://anvilfield.com/standards/ashrae-62-1/ Ventilation for Acceptable Indoor Air Quality. Applied in 27 Anvilfield field guides, including: - Air balancing report field guide [https://anvilfield.com/field-guides/hvac/air-balancing-report-procedure/] - Air duct cleaning field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-cleaning-nadca-iaq/] - Air filtration and MERV field guide [https://anvilfield.com/field-guides/hvac/air-filtration-merv-iaq/] - Air handling unit (AHU) field guide [https://anvilfield.com/field-guides/hvac/air-handling-unit-ahu-components-operation/] - Building insulation and air sealing [https://anvilfield.com/field-guides/roofing/building-insulation-air-sealing-envelope/] - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - Commercial building heat pumps [https://anvilfield.com/field-guides/hvac/heat-pumps-for-commercial-buildings/] - Commercial exhaust ventilation guide [https://anvilfield.com/field-guides/hvac/commercial-exhaust-fan-ventilation/] - DOAS field guide [https://anvilfield.com/field-guides/hvac/dedicated-outdoor-air-system-doas/] - Desiccant dehumidification field guide [https://anvilfield.com/field-guides/hvac/hvac-desiccant-dehumidification-systems/] - Diffusers, grilles, and registers field guide [https://anvilfield.com/field-guides/hvac/hvac-air-distribution-diffusers-grilles-registers/] - ERV commissioning field guide [https://anvilfield.com/field-guides/hvac/energy-recovery-ventilator-erv-commissioning/] - Economizer and DCV field guide [https://anvilfield.com/field-guides/hvac/economizer-demand-control-ventilation/] - External static pressure field guide [https://anvilfield.com/field-guides/hvac/duct-static-pressure/] - HVAC coil cleaning and maintenance guide [https://anvilfield.com/field-guides/hvac/hvac-coil-types-cleaning-maintenance/] ## IRC - International Code Council https://anvilfield.com/standards/irc/ International Residential Code. Applied in 24 Anvilfield field guides, including: - Building insulation and air sealing [https://anvilfield.com/field-guides/roofing/building-insulation-air-sealing-envelope/] - Commercial fence and gate install [https://anvilfield.com/field-guides/landscaping/commercial-fence-gate-installation/] - Deck construction field guide [https://anvilfield.com/field-guides/landscaping/wood-composite-deck-construction/] - Drainage, grading, and slope [https://anvilfield.com/field-guides/landscaping/drainage-grading-slope/] - Fascia, soffit, and eave trim [https://anvilfield.com/field-guides/roofing/fascia-soffit-eave-trim-installation/] - Foundation types and footings [https://anvilfield.com/field-guides/concrete/concrete-foundation-types-footings-design/] - Gutters and downspouts [https://anvilfield.com/field-guides/roofing/gutter-downspout-exterior-drainage/] - Hardscape drainage [https://anvilfield.com/field-guides/landscaping/hardscape-drainage-patio-retaining/] - Metal railing and guardrail fabrication [https://anvilfield.com/field-guides/concrete/metal-railing-guardrail-fabrication/] - Outdoor fire feature guide [https://anvilfield.com/field-guides/landscaping/outdoor-fire-feature-pit-fireplace/] - Pergola and shade structure guide [https://anvilfield.com/field-guides/landscaping/pergola-gazebo-shade-structure-construction/] - Reroof: recover vs tear-off [https://anvilfield.com/field-guides/roofing/roof-tear-off-reroof-recover-decision/] - Retaining wall types and selection [https://anvilfield.com/field-guides/landscaping/retaining-wall-types-selection/] - Roof attic ventilation [https://anvilfield.com/field-guides/roofing/roof-attic-ventilation-intake-exhaust/] - Roof blister investigation [https://anvilfield.com/field-guides/roofing/roof-blister-investigation-repair-boundaries/] ## NETA - InterNational Electrical Testing Association https://anvilfield.com/standards/neta/ InterNational Electrical Testing Association acceptance and maintenance testing specs (ATS/MTS). Sections cited: NETA ATS, NETA MTS Applied in 24 Anvilfield field guides, including: - ATS commissioning field guide [https://anvilfield.com/field-guides/electrical/automatic-transfer-switch-commissioning/] - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - Busway receiving and megger QA [https://anvilfield.com/field-guides/datacenter/busway-receiving-megger-qa/] - Commissioning subcontract labor and retests [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-subcontract-scope-retests/] - Coordination study field guide [https://anvilfield.com/field-guides/datacenter/protective-relay-coordination-study/] - Data center commissioning levels [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-levels-process/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - EPMS and power metering [https://anvilfield.com/field-guides/datacenter/epms-power-monitoring-metering/] - Generator acceptance and turnover [https://anvilfield.com/field-guides/datacenter/generator-acceptance-loadbank-turnover/] - Generator paralleling switchgear [https://anvilfield.com/field-guides/datacenter/generator-paralleling-switchgear/] - Infrared thermography field guide [https://anvilfield.com/field-guides/electrical/infrared-thermography-inspection/] - Load bank test acceptance criteria [https://anvilfield.com/field-guides/datacenter/load-bank-test-acceptance-criteria/] - MCC commissioning [https://anvilfield.com/field-guides/electrical/motor-control-center-mcc-commissioning/] - MV cable termination and testing [https://anvilfield.com/field-guides/datacenter/mv-cable-termination-testing/] - MV switchgear maintenance and testing [https://anvilfield.com/field-guides/electrical/medium-voltage-switchgear-maintenance-testing/] ## SMACNA - SMACNA https://anvilfield.com/standards/smacna/ Sheet Metal and Air Conditioning Contractors' National Association standards. Applied in 24 Anvilfield field guides, including: - Air balancing report field guide [https://anvilfield.com/field-guides/hvac/air-balancing-report-procedure/] - Air handling unit (AHU) field guide [https://anvilfield.com/field-guides/hvac/air-handling-unit-ahu-components-operation/] - CRAC/CRAH airflow setup [https://anvilfield.com/field-guides/datacenter/crac-crah-static-pressure-airflow/] - Commercial exhaust ventilation guide [https://anvilfield.com/field-guides/hvac/commercial-exhaust-fan-ventilation/] - Data center seismic anchoring field guide [https://anvilfield.com/field-guides/datacenter/data-center-seismic-anchoring-equipment/] - Diffusers, grilles, and registers field guide [https://anvilfield.com/field-guides/hvac/hvac-air-distribution-diffusers-grilles-registers/] - Duct insulation field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-insulation-wrap-liner/] - Duct leakage pressure testing [https://anvilfield.com/field-guides/datacenter/duct-leakage-pressure-testing/] - Duct leakage testing field guide [https://anvilfield.com/field-guides/hvac/duct-leakage-testing-sealing/] - Ductwork types field guide [https://anvilfield.com/field-guides/hvac/ductwork-types-sheet-metal-flex-ductboard/] - External static pressure field guide [https://anvilfield.com/field-guides/hvac/duct-static-pressure/] - Gutters and downspouts [https://anvilfield.com/field-guides/roofing/gutter-downspout-exterior-drainage/] - HVAC estimating and bidding field guide [https://anvilfield.com/field-guides/hvac/hvac-estimating-bidding/] - HVAC vibration isolation field guide [https://anvilfield.com/field-guides/hvac/hvac-vibration-isolation-equipment-mounting/] - HVAC zoning systems field guide [https://anvilfield.com/field-guides/hvac/hvac-zoning-systems-dampers-thermostats/] ## IECC - International Code Council https://anvilfield.com/standards/iecc/ International Energy Conservation Code. Applied in 23 Anvilfield field guides, including: - Air curtain field guide [https://anvilfield.com/field-guides/hvac/air-curtain-door-heater-systems/] - Building insulation and air sealing [https://anvilfield.com/field-guides/roofing/building-insulation-air-sealing-envelope/] - Chilled water pumping field guide [https://anvilfield.com/field-guides/hvac/chilled-water-pumping-primary-secondary-variable/] - Chiller plant sequencing optimization [https://anvilfield.com/field-guides/hvac/chiller-plant-sequencing-optimization/] - Commercial lighting design [https://anvilfield.com/field-guides/electrical/commercial-lighting-design-footcandles-controls/] - Cool roof reflectivity and energy [https://anvilfield.com/field-guides/roofing/cool-roof-reflectivity-energy/] - DOAS field guide [https://anvilfield.com/field-guides/hvac/dedicated-outdoor-air-system-doas/] - Duct insulation field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-insulation-wrap-liner/] - Duct leakage testing field guide [https://anvilfield.com/field-guides/hvac/duct-leakage-testing-sealing/] - Ductwork types field guide [https://anvilfield.com/field-guides/hvac/ductwork-types-sheet-metal-flex-ductboard/] - ERV commissioning field guide [https://anvilfield.com/field-guides/hvac/energy-recovery-ventilator-erv-commissioning/] - Economizer fault detection field guide [https://anvilfield.com/field-guides/hvac/air-side-economizer-fault-detection/] - LED lighting retrofit [https://anvilfield.com/field-guides/electrical/led-lighting-retrofit-upgrade/] - Lighting controls and dimming [https://anvilfield.com/field-guides/electrical/lighting-controls-dimming-0-10v-dali/] - Makeup air unit field guide [https://anvilfield.com/field-guides/hvac/makeup-air-unit-kitchen-ventilation/] ## ACI 301 - American Concrete Institute https://anvilfield.com/standards/aci-301/ Specifications for Concrete Construction. Applied in 19 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete admixtures [https://anvilfield.com/field-guides/concrete/concrete-admixtures-types-guide/] - Concrete crack types and causes [https://anvilfield.com/field-guides/concrete/concrete-crack-types-causes-prevention/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete estimating and takeoff [https://anvilfield.com/field-guides/concrete/concrete-estimating-takeoff/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Development length and lap splices [https://anvilfield.com/field-guides/concrete/rebar-development-length-lap-splices/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Formwork types and systems [https://anvilfield.com/field-guides/concrete/concrete-formwork-types-systems/] - Foundation types and footings [https://anvilfield.com/field-guides/concrete/concrete-foundation-types-footings-design/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mass concrete thermal control [https://anvilfield.com/field-guides/concrete/mass-concrete-thermal-control-cracking/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] ## IMC - International Code Council https://anvilfield.com/standards/imc/ International Mechanical Code. Applied in 18 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - Commercial exhaust ventilation guide [https://anvilfield.com/field-guides/hvac/commercial-exhaust-fan-ventilation/] - Condensate drain and trap field guide [https://anvilfield.com/field-guides/hvac/condensate-drain-trap-management/] - Conduit bending fundamentals [https://anvilfield.com/field-guides/electrical/conduit-bending-fundamentals/] - Conduit bodies and fittings [https://anvilfield.com/field-guides/electrical/conduit-bodies-fittings-installation/] - Conduit fill, NEC Chapter 9 [https://anvilfield.com/field-guides/electrical/conduit-fill-nec-chapter-9/] - DOAS field guide [https://anvilfield.com/field-guides/hvac/dedicated-outdoor-air-system-doas/] - Ductless mini-split install field guide [https://anvilfield.com/field-guides/hvac/ductless-mini-split-multi-zone-install/] - External static pressure field guide [https://anvilfield.com/field-guides/hvac/duct-static-pressure/] - Fire and smoke damper field guide [https://anvilfield.com/field-guides/hvac/fire-smoke-damper-installation-testing/] - Hazardous classified locations [https://anvilfield.com/field-guides/electrical/electrical-hazardous-classified-locations/] - Kitchen equipment install field guide [https://anvilfield.com/field-guides/hvac/commercial-kitchen-equipment-installation/] - Makeup air unit field guide [https://anvilfield.com/field-guides/hvac/makeup-air-unit-kitchen-ventilation/] - Pipe hangers and seismic bracing guide [https://anvilfield.com/field-guides/plumbing/pipe-hangers-supports-seismic-bracing/] ## NFPA 72 - National Fire Protection Association https://anvilfield.com/standards/nfpa-72/ National Fire Alarm and Signaling Code. Applied in 17 Anvilfield field guides, including: - Access control system field guide [https://anvilfield.com/field-guides/electrical/access-control-system-installation/] - Aspirating smoke detection [https://anvilfield.com/field-guides/datacenter/aspirating-smoke-detection-vesda/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Clean agent room integrity [https://anvilfield.com/field-guides/datacenter/clean-agent-suppression-room-integrity/] - DAS and public-safety radio [https://anvilfield.com/field-guides/electrical/das-in-building-wireless-public-safety/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Dry-pipe and pre-action trip test [https://anvilfield.com/field-guides/datacenter/dry-pipe-preaction-trip-test/] - EPO testing field guide [https://anvilfield.com/field-guides/datacenter/emergency-power-off-epo-testing/] - Fire alarm install and test [https://anvilfield.com/field-guides/electrical/fire-alarm-system-installation-testing/] - Fire protection retrofit demand [https://anvilfield.com/field-guides/market-intelligence/firestop-and-fire-protection-equipment-makers-retrofit-demand-in-existing-buildings/] - Intercom and paging design field guide [https://anvilfield.com/field-guides/electrical/commercial-av-intercom-system-design/] - Intrusion alarm field guide [https://anvilfield.com/field-guides/electrical/intrusion-alarm-system-installation/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - RTU install and startup field guide [https://anvilfield.com/field-guides/hvac/rooftop-unit-rtu-installation-startup/] ## ACI 302 - American Concrete Institute https://anvilfield.com/standards/aci-302/ Guide to Concrete Floor and Slab Construction. Sections cited: ACI 302.1R-15 Applied in 14 Anvilfield field guides, including: - Concrete crack types and causes [https://anvilfield.com/field-guides/concrete/concrete-crack-types-causes-prevention/] - Concrete curb, gutter, and sidewalk [https://anvilfield.com/field-guides/paving/concrete-curb-gutter-sidewalk-flatwork/] - Concrete driveway installation [https://anvilfield.com/field-guides/concrete/concrete-driveway-installation/] - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Control joint layout [https://anvilfield.com/field-guides/concrete/construction-control-joint-layout/] - Evaporation rate and plastic cracking [https://anvilfield.com/field-guides/concrete/concrete-evaporation-rate-plastic-cracking/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Floor flatness and levelness [https://anvilfield.com/field-guides/datacenter/floor-flatness-levelness-ff-fl/] - Laser screed and screeding methods [https://anvilfield.com/field-guides/concrete/laser-screed-concrete-screeding-methods/] - Polished concrete grind and densify [https://anvilfield.com/field-guides/concrete/polished-concrete-floor-grind-densify/] - Slab curling and warping control [https://anvilfield.com/field-guides/concrete/concrete-slab-curling-warping-control/] - Slab on grade design and thickness [https://anvilfield.com/field-guides/concrete/slab-on-grade-design-thickness/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] - Under-slab vapor barrier and slab moisture [https://anvilfield.com/field-guides/concrete/under-slab-vapor-barrier-moisture/] ## ASHRAE Guideline 0 - ASHRAE https://anvilfield.com/standards/ashrae-guideline-0/ The Commissioning Process. Applied in 14 Anvilfield field guides, including: - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Boiler startup commissioning [https://anvilfield.com/field-guides/hvac/boiler-startup-commissioning/] - Chiller plant sequencing optimization [https://anvilfield.com/field-guides/hvac/chiller-plant-sequencing-optimization/] - Chiller plant startup commissioning [https://anvilfield.com/field-guides/hvac/chiller-plant-startup-commissioning/] - Data center buildout phases [https://anvilfield.com/field-guides/datacenter/data-center-construction-buildout-phases/] - Data center commissioning levels [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-levels-process/] - Data center commissioning process [https://anvilfield.com/field-guides/datacenter/datacenter-commissioning-operations-overview/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - Integrated systems test (IST) [https://anvilfield.com/field-guides/datacenter/integrated-systems-test-ist-commissioning/] - Leak detection commissioning [https://anvilfield.com/field-guides/datacenter/leak-detection-system-commissioning/] - Proof packet assembly [https://anvilfield.com/field-guides/datacenter/proof-packet-assembly-turnover/] - Punch list and closeout [https://anvilfield.com/field-guides/datacenter/punch-list-closeout-turnover/] - Retro-commissioning existing buildings [https://anvilfield.com/field-guides/hvac/retro-commissioning-existing-buildings/] - VAV box commissioning field guide [https://anvilfield.com/field-guides/hvac/vav-box-commissioning-airflow/] ## TIA-568 - Standards body https://anvilfield.com/standards/tia-568/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 14 Anvilfield field guides, including: - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Cat6A certification field guide [https://anvilfield.com/field-guides/datacenter/copper-cat6a-certification/] - Cross-connect patch records [https://anvilfield.com/field-guides/datacenter/cross-connect-patch-record-mmr/] - Data center fiber types [https://anvilfield.com/field-guides/datacenter/data-center-fiber-cabling-types-singlemode-multimode/] - Data center rack cable management [https://anvilfield.com/field-guides/datacenter/data-center-rack-cable-management/] - Data center structured cabling [https://anvilfield.com/field-guides/datacenter/datacenter-structured-cabling-overview/] - Fiber OTDR certification [https://anvilfield.com/field-guides/datacenter/fiber-otdr-bidirectional-certification/] - Fiber splice loss budget [https://anvilfield.com/field-guides/datacenter/fiber-splice-loss-budget/] - GPU network optics and cabling [https://anvilfield.com/field-guides/datacenter/data-center-gpu-network-optics-cabling/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - MPO/MTP polarity methods [https://anvilfield.com/field-guides/datacenter/mpo-mtp-polarity-methods/] - PoE voltage drop and heat [https://anvilfield.com/field-guides/electrical/poe-voltage-drop-and-heat-quick-check/] - Spine-leaf network architecture [https://anvilfield.com/field-guides/datacenter/data-center-network-architecture-spine-leaf/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] ## NFPA 54 - National Fire Protection Association https://anvilfield.com/standards/nfpa-54/ National Fuel Gas Code (also ANSI Z223.1). Applied in 13 Anvilfield field guides, including: - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - Combustion analysis field guide [https://anvilfield.com/field-guides/hvac/combustion-analysis-flue-gas-tuning/] - Gas furnace field guide [https://anvilfield.com/field-guides/hvac/gas-furnace-operation-troubleshooting/] - Gas piping sizing and install guide [https://anvilfield.com/field-guides/plumbing/natural-gas-piping-sizing-install/] - Infrared radiant heater field guide [https://anvilfield.com/field-guides/hvac/hvac-infrared-radiant-tube-heater/] - Kitchen equipment install field guide [https://anvilfield.com/field-guides/hvac/commercial-kitchen-equipment-installation/] - Outdoor fire feature guide [https://anvilfield.com/field-guides/landscaping/outdoor-fire-feature-pit-fireplace/] - Outdoor kitchen construction guide [https://anvilfield.com/field-guides/landscaping/outdoor-kitchen-construction-installation/] - Plumbing estimating and takeoff guide [https://anvilfield.com/field-guides/plumbing/plumbing-estimating-takeoff/] - Propane LP-gas system install guide [https://anvilfield.com/field-guides/plumbing/propane-lp-gas-system-install/] - Unit heater field guide [https://anvilfield.com/field-guides/hvac/hvac-unit-heater-gas-electric/] - Water heater maintenance [https://anvilfield.com/field-guides/plumbing/water-heater-maintenance-anode-flushing/] - Water heater venting and combustion air [https://anvilfield.com/field-guides/plumbing/water-heater-venting-combustion-air/] ## ASTM C1153 - ASTM International https://anvilfield.com/standards/astm-c1153/ Practice for Locating Wet Insulation in Roofing Systems Using Infrared Imaging. Sections cited: ASTM C1153-23 Applied in 12 Anvilfield field guides, including: - 100-building roofing prospect list [https://anvilfield.com/field-guides/roofing/commercial-roofing-prospect-list/] - Drone inspection field guide [https://anvilfield.com/field-guides/roofing/drone-uav-roof-facade-inspection/] - Find older commercial roofs [https://anvilfield.com/field-guides/roofing/find-older-commercial-roofs/] - Infrared roof moisture confirmation [https://anvilfield.com/field-guides/roofing/infrared-roof-moisture-survey-interpretation/] - PCA findings to capital needs [https://anvilfield.com/field-guides/roofing/property-condition-assessment-capital-needs/] - Roof asset management [https://anvilfield.com/field-guides/roofing/roof-asset-management-capital-planning/] - Roof blister investigation [https://anvilfield.com/field-guides/roofing/roof-blister-investigation-repair-boundaries/] - Roof coating restoration system [https://anvilfield.com/field-guides/roofing/low-slope-roof-coating-restoration-system/] - Roof evidence for a property sale [https://anvilfield.com/field-guides/roofing/roof-condition-property-transaction-evidence/] - Roof maintenance program [https://anvilfield.com/field-guides/roofing/roof-inspection-maintenance-program/] - Roof repair or replacement: 10-year break-even [https://anvilfield.com/field-guides/roofing/roof-repair-replace-ten-year-break-even/] - USACE ROOFER condition worksheet [https://anvilfield.com/field-guides/roofing/roofer-roof-condition-rating-worksheet/] ## ASTM C39 - ASTM International https://anvilfield.com/standards/astm-c39/ Test Method for Compressive Strength of Cylindrical Concrete Specimens. Applied in 12 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete estimating and takeoff [https://anvilfield.com/field-guides/concrete/concrete-estimating-takeoff/] - Concrete pavement jointing and curing [https://anvilfield.com/field-guides/paving/concrete-pavement-jointing-curing/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Construction QA/QC program [https://anvilfield.com/field-guides/concrete/construction-quality-control-qa-qc-program/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Lightweight concrete [https://anvilfield.com/field-guides/concrete/lightweight-concrete-structural-insulating/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Placement and consolidation [https://anvilfield.com/field-guides/concrete/concrete-placement-consolidation-vibration/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM F2170 - ASTM International https://anvilfield.com/standards/astm-f2170/ Test Method for Relative Humidity in Concrete Floor Slabs Using in-situ Probes. Applied in 12 Anvilfield field guides, including: - Commercial resilient flooring install [https://anvilfield.com/field-guides/concrete/commercial-flooring-resilient-installation/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete overlay and resurfacing [https://anvilfield.com/field-guides/concrete/concrete-overlay-resurfacing-decorative/] - Concrete sealers and coatings [https://anvilfield.com/field-guides/concrete/concrete-sealers-coatings-protection/] - Epoxy resinous floor coating install [https://anvilfield.com/field-guides/concrete/epoxy-resinous-floor-coating-install/] - Moisture meter scales and corrections [https://anvilfield.com/field-guides/plumbing/restoration-moisture-meter-scale-corrections/] - Polished concrete grind and densify [https://anvilfield.com/field-guides/concrete/polished-concrete-floor-grind-densify/] - Self-leveling underlayment floor prep [https://anvilfield.com/field-guides/concrete/self-leveling-underlayment-floor-prep/] - Slab moisture testing for flooring [https://anvilfield.com/field-guides/concrete/slab-moisture-testing-flooring-rh/] - Terrazzo flooring install and polish [https://anvilfield.com/field-guides/concrete/terrazzo-flooring-installation-polishing/] - Traffic deck coating [https://anvilfield.com/field-guides/roofing/traffic-deck-waterproofing-coating/] - Under-slab vapor barrier and slab moisture [https://anvilfield.com/field-guides/concrete/under-slab-vapor-barrier-moisture/] ## NFPA 70B - National Fire Protection Association https://anvilfield.com/standards/nfpa-70b/ Standard for Electrical Equipment Maintenance. Applied in 12 Anvilfield field guides, including: - Busway receiving and megger QA [https://anvilfield.com/field-guides/datacenter/busway-receiving-megger-qa/] - Clean agent room integrity [https://anvilfield.com/field-guides/datacenter/clean-agent-suppression-room-integrity/] - Data center PM program [https://anvilfield.com/field-guides/datacenter/data-center-maintenance-management-pm-program/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - Generator load bank testing [https://anvilfield.com/field-guides/electrical/electrical-generator-load-bank-testing/] - Infrared thermography field guide [https://anvilfield.com/field-guides/electrical/infrared-thermography-inspection/] - MV switchgear maintenance and testing [https://anvilfield.com/field-guides/electrical/medium-voltage-switchgear-maintenance-testing/] - Padmount transformer energization [https://anvilfield.com/field-guides/datacenter/padmount-transformer-receiving-energization/] - Parallel conductor current imbalance [https://anvilfield.com/field-guides/electrical/parallel-conductor-current-imbalance/] - Switchgear receiving inspection [https://anvilfield.com/field-guides/datacenter/switchgear-receiving-inspection-checklist/] - Termination torque QA field guide [https://anvilfield.com/field-guides/electrical/termination-torque-qa/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## NFPA 75 - National Fire Protection Association https://anvilfield.com/standards/nfpa-75/ Standard for the Fire Protection of Information Technology Equipment. Applied in 12 Anvilfield field guides, including: - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - Aspirating smoke detection [https://anvilfield.com/field-guides/datacenter/aspirating-smoke-detection-vesda/] - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Data center decommissioning [https://anvilfield.com/field-guides/datacenter/data-center-decommissioning-equipment-removal/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Dry-pipe and pre-action trip test [https://anvilfield.com/field-guides/datacenter/dry-pipe-preaction-trip-test/] - EPO testing field guide [https://anvilfield.com/field-guides/datacenter/emergency-power-off-epo-testing/] - Immersion cooling acceptance [https://anvilfield.com/field-guides/datacenter/immersion-cooling-tank-acceptance/] - Raised access floor installation [https://anvilfield.com/field-guides/datacenter/raised-access-floor-installation/] - Raised floor acceptance packet [https://anvilfield.com/field-guides/datacenter/raised-floor-acceptance-packet/] - Two-phase cooling [https://anvilfield.com/field-guides/datacenter/data-center-two-phase-cooling/] ## NFPA 855 - National Fire Protection Association https://anvilfield.com/standards/nfpa-855/ Standard for the Installation of Stationary Energy Storage Systems. Applied in 12 Anvilfield field guides, including: - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - BESS thermal acceptance [https://anvilfield.com/field-guides/hvac/bess-container-thermal-uniformity-acceptance/] - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery monitoring for VRLA and lithium [https://anvilfield.com/field-guides/datacenter/data-center-battery-monitoring-system-vrla-lithium/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] - Rack BBU and ride-through [https://anvilfield.com/field-guides/datacenter/rack-bbu-energy-storage-ride-through/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] - UPS types and technologies [https://anvilfield.com/field-guides/datacenter/ups-types-online-line-interactive-standby/] ## TIA-606 - Standards body https://anvilfield.com/standards/tia-606/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 12 Anvilfield field guides, including: - Cross-connect patch records [https://anvilfield.com/field-guides/datacenter/cross-connect-patch-record-mmr/] - DCIM and asset management [https://anvilfield.com/field-guides/datacenter/dcim-monitoring-asset-management/] - Data center buildout phases [https://anvilfield.com/field-guides/datacenter/data-center-construction-buildout-phases/] - Data center fiber types [https://anvilfield.com/field-guides/datacenter/data-center-fiber-cabling-types-singlemode-multimode/] - Data center rack cable management [https://anvilfield.com/field-guides/datacenter/data-center-rack-cable-management/] - Data center structured cabling [https://anvilfield.com/field-guides/datacenter/datacenter-structured-cabling-overview/] - Fiber end-face inspection and cleaning [https://anvilfield.com/field-guides/datacenter/fiber-connector-end-face-inspection-cleaning/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - Rack readiness field guide [https://anvilfield.com/field-guides/datacenter/rack-readiness-floor-load-layout/] - Rack-and-stack deployment field guide [https://anvilfield.com/field-guides/datacenter/it-equipment-rack-stack-deployment-migration/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] - White space and gray space field guide [https://anvilfield.com/field-guides/datacenter/data-center-white-space-gray-space-layout/] ## ASHRAE 15 - ASHRAE https://anvilfield.com/standards/ashrae-15/ Safety Standard for Refrigeration Systems. Applied in 11 Anvilfield field guides, including: - Chiller plant startup commissioning [https://anvilfield.com/field-guides/hvac/chiller-plant-startup-commissioning/] - Chiller types and selection [https://anvilfield.com/field-guides/hvac/chiller-types-selection-centrifugal-screw-scroll/] - Cold storage and refrigerated warehouse design [https://anvilfield.com/field-guides/hvac/cold-storage-refrigerated-warehouse-design/] - Commercial building heat pumps [https://anvilfield.com/field-guides/hvac/heat-pumps-for-commercial-buildings/] - HVAC compressor types [https://anvilfield.com/field-guides/hvac/compressor-types-scroll-screw-reciprocating/] - HVAC system types field guide [https://anvilfield.com/field-guides/hvac/hvac-system-types-overview/] - Refrigerant leak detection field guide [https://anvilfield.com/field-guides/hvac/refrigerant-leak-detection-recovery/] - Refrigerant line sizing field guide [https://anvilfield.com/field-guides/hvac/refrigerant-piping-line-sizing-design/] - Refrigerant types and A2L [https://anvilfield.com/field-guides/hvac/refrigerant-types-a2l-transition/] - Refrigeration accessories field guide [https://anvilfield.com/field-guides/hvac/refrigeration-accessories-filter-drier-sight-glass/] - VRF commissioning field guide [https://anvilfield.com/field-guides/hvac/vrf-system-commissioning-startup/] ## ASTM C31 - ASTM International https://anvilfield.com/standards/astm-c31/ Practice for Making and Curing Concrete Test Specimens in the Field. Applied in 10 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Construction QA/QC program [https://anvilfield.com/field-guides/concrete/construction-quality-control-qa-qc-program/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Placement and consolidation [https://anvilfield.com/field-guides/concrete/concrete-placement-consolidation-vibration/] - Ready-mix ordering and delivery [https://anvilfield.com/field-guides/concrete/ready-mix-concrete-ordering-delivery/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM D6433 - ASTM International https://anvilfield.com/standards/astm-d6433/ Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys. Sections cited: ASTM D6433-24 Applied in 10 Anvilfield field guides, including: - Asphalt distress and crack diagnosis [https://anvilfield.com/field-guides/paving/asphalt-pavement-distress-crack-diagnosis/] - Fog seal and rejuvenator preservation [https://anvilfield.com/field-guides/paving/fog-seal-rejuvenator-pavement-preservation/] - Industrial yard paving and drainage [https://anvilfield.com/field-guides/paving/industrial-yard-paving-drainage/] - PCA findings to capital needs [https://anvilfield.com/field-guides/roofing/property-condition-assessment-capital-needs/] - Parking lot survey priority [https://anvilfield.com/field-guides/paving/parking-lot-sealcoat-prospect-priority/] - Pavement condition assessment (PCI) [https://anvilfield.com/field-guides/paving/pavement-condition-assessment-pci/] - Pavement preservation treatments [https://anvilfield.com/field-guides/paving/pavement-preservation-treatments-overview/] - Portfolio capital budget dependency model [https://anvilfield.com/field-guides/roofing/portfolio-capital-budget-dependency-model/] - Sealcoat and crack seal maintenance [https://anvilfield.com/field-guides/paving/sealcoat-crack-seal-maintenance/] - Ten-year parking lot maintenance budget [https://anvilfield.com/field-guides/paving/parking-lot-ten-year-maintenance-budget/] ## ASTM E1155 - ASTM International https://anvilfield.com/standards/astm-e1155/ Test Method for Determining Floor Flatness and Levelness (FF/FL). Applied in 10 Anvilfield field guides, including: - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Construction layout [https://anvilfield.com/field-guides/concrete/construction-layout-total-station-gps/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Floor flatness and levelness [https://anvilfield.com/field-guides/datacenter/floor-flatness-levelness-ff-fl/] - Laser screed and screeding methods [https://anvilfield.com/field-guides/concrete/laser-screed-concrete-screeding-methods/] - Quality control and the ITP [https://anvilfield.com/field-guides/datacenter/quality-control-itp-inspection-test-plan/] - Self-leveling underlayment floor prep [https://anvilfield.com/field-guides/concrete/self-leveling-underlayment-floor-prep/] - Slab curling and warping control [https://anvilfield.com/field-guides/concrete/concrete-slab-curling-warping-control/] - Slab on grade design and thickness [https://anvilfield.com/field-guides/concrete/slab-on-grade-design-thickness/] ## ASTM F1869 - ASTM International https://anvilfield.com/standards/astm-f1869/ Test Method for Measuring Moisture Vapor Emission Rate (calcium chloride). Sections cited: ASTM F1869-23 Applied in 10 Anvilfield field guides, including: - Commercial resilient flooring install [https://anvilfield.com/field-guides/concrete/commercial-flooring-resilient-installation/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete overlay and resurfacing [https://anvilfield.com/field-guides/concrete/concrete-overlay-resurfacing-decorative/] - Concrete sealers and coatings [https://anvilfield.com/field-guides/concrete/concrete-sealers-coatings-protection/] - Epoxy resinous floor coating install [https://anvilfield.com/field-guides/concrete/epoxy-resinous-floor-coating-install/] - Self-leveling underlayment floor prep [https://anvilfield.com/field-guides/concrete/self-leveling-underlayment-floor-prep/] - Slab moisture testing for flooring [https://anvilfield.com/field-guides/concrete/slab-moisture-testing-flooring-rh/] - Terrazzo flooring install and polish [https://anvilfield.com/field-guides/concrete/terrazzo-flooring-installation-polishing/] - Traffic deck coating [https://anvilfield.com/field-guides/roofing/traffic-deck-waterproofing-coating/] - Under-slab vapor barrier and slab moisture [https://anvilfield.com/field-guides/concrete/under-slab-vapor-barrier-moisture/] ## IICRC S500 - IICRC https://anvilfield.com/standards/iicrc-s500/ Standard for Professional Water Damage Restoration. Applied in 10 Anvilfield field guides, including: - Biohazard and trauma cleanup guide [https://anvilfield.com/field-guides/plumbing/biohazard-trauma-sewage-cleanup/] - Concealed-cavity drying verification [https://anvilfield.com/field-guides/plumbing/concealed-cavity-drying-verification/] - Contents pack-out and inventory [https://anvilfield.com/field-guides/plumbing/contents-pack-out-restoration-inventory/] - Fire and smoke damage restoration field guide [https://anvilfield.com/field-guides/plumbing/fire-smoke-damage-restoration-iicrc-s700/] - Mitigation equipment runtime evidence [https://anvilfield.com/field-guides/plumbing/mitigation-equipment-runtime-evidence/] - Moisture meter scales and corrections [https://anvilfield.com/field-guides/plumbing/restoration-moisture-meter-scale-corrections/] - Restoration dehumidifier field capacity [https://anvilfield.com/field-guides/plumbing/restoration-dehumidifier-capacity-field-performance/] - Water damage restoration field guide [https://anvilfield.com/field-guides/plumbing/water-damage-restoration-mitigation-iicrc-s500/] - Water mitigation and drying guide [https://anvilfield.com/field-guides/plumbing/water-damage-mitigation-structural-drying/] - Water-loss cause evidence register [https://anvilfield.com/field-guides/plumbing/water-loss-cause-evidence-register/] ## NFPA 13 - National Fire Protection Association https://anvilfield.com/standards/nfpa-13/ Standard for the Installation of Sprinkler Systems. Applied in 10 Anvilfield field guides, including: - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - Aspirating smoke detection [https://anvilfield.com/field-guides/datacenter/aspirating-smoke-detection-vesda/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Data center seismic anchoring field guide [https://anvilfield.com/field-guides/datacenter/data-center-seismic-anchoring-equipment/] - Dry-pipe and pre-action trip test [https://anvilfield.com/field-guides/datacenter/dry-pipe-preaction-trip-test/] - Fire sprinkler system design guide [https://anvilfield.com/field-guides/plumbing/fire-sprinkler-system-design-nfpa13/] - Pipe hangers and seismic bracing guide [https://anvilfield.com/field-guides/plumbing/pipe-hangers-supports-seismic-bracing/] - Pipe joining methods [https://anvilfield.com/field-guides/plumbing/pipe-joining-methods-solder-press-solvent/] - Plumbing pressure test guide [https://anvilfield.com/field-guides/plumbing/hydrostatic-pressure-test-plumbing/] ## ANSI A300 - ANSI https://anvilfield.com/standards/ansi-a300/ American National Standard for Tree Care Operations. Applied in 9 Anvilfield field guides, including: - Plant health care (PHC) [https://anvilfield.com/field-guides/landscaping/plant-health-care-phc-program/] - Tree and shrub planting [https://anvilfield.com/field-guides/landscaping/tree-shrub-planting-establishment/] - Tree cabling and bracing [https://anvilfield.com/field-guides/landscaping/tree-cabling-bracing-structural-support/] - Tree establishment and aftercare [https://anvilfield.com/field-guides/landscaping/tree-planting-staking-establishment/] - Tree pruning and maintenance [https://anvilfield.com/field-guides/landscaping/tree-pruning-maintenance-ansi-a300/] - Tree removal and stump grinding [https://anvilfield.com/field-guides/landscaping/tree-removal-stump-grinding/] - Tree risk assessment [https://anvilfield.com/field-guides/landscaping/tree-risk-assessment-hazard-trees/] - Tree staking and guying [https://anvilfield.com/field-guides/landscaping/tree-staking-guying-support/] - Tree transplanting [https://anvilfield.com/field-guides/landscaping/tree-transplanting-large-tree-moving/] ## ASHRAE 188 - ASHRAE https://anvilfield.com/standards/ashrae-188/ Legionellosis: Risk Management for Building Water Systems. Applied in 9 Anvilfield field guides, including: - Adiabatic and evaporative cooling [https://anvilfield.com/field-guides/datacenter/data-center-adiabatic-evaporative-cooling/] - Chiller plant startup commissioning [https://anvilfield.com/field-guides/hvac/chiller-plant-startup-commissioning/] - Cooling tower commissioning [https://anvilfield.com/field-guides/hvac/cooling-tower-commissioning-water-treatment/] - Cooling tower types and operation [https://anvilfield.com/field-guides/hvac/cooling-tower-types-operation/] - Evaporative cooling and swamp coolers [https://anvilfield.com/field-guides/hvac/evaporative-cooling-swamp-cooler-systems/] - Healthcare HVAC ventilation field guide [https://anvilfield.com/field-guides/hvac/healthcare-hospital-hvac-ventilation-ashrae-170/] - Hot water recirculation loops [https://anvilfield.com/field-guides/plumbing/water-heater-recirculation-sizing/] - Mixing valves, scald, and Legionella [https://anvilfield.com/field-guides/plumbing/thermostatic-mixing-valve-scald-legionella/] - Water heater sizing and selection [https://anvilfield.com/field-guides/plumbing/water-heater-sizing-selection/] ## ASME A112 - ASME https://anvilfield.com/standards/asme-a112/ Standards for plumbing materials and fixtures (the ASME A112 series). Sections cited: ASME A112.6, ASME A112.6.2, ASME A112.6.3, ASME A112.6.7, ASME A112.14.1, ASME A112.14.3, ASME A112.14.4, ASME A112.18.1, ASME A112.19.2, ASME A112.19.8, ASME A112.19.17, ASME A112.1037 Applied in 9 Anvilfield field guides, including: - Backwater valve field guide [https://anvilfield.com/field-guides/plumbing/backwater-valve-sewer-backup-protection/] - Commercial pool construction [https://anvilfield.com/field-guides/concrete/commercial-pool-construction-shotcrete-shell/] - Fixture carriers and supports guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-carriers-supports/] - Fixture rough-in and setting guide [https://anvilfield.com/field-guides/plumbing/plumbing-fixture-rough-in-setting/] - Fixtures and water efficiency [https://anvilfield.com/field-guides/plumbing/plumbing-fixtures-types-water-efficiency/] - Floor and trench drain installation guide [https://anvilfield.com/field-guides/plumbing/floor-drain-trench-drain-installation/] - Flushometer flush valve types [https://anvilfield.com/field-guides/plumbing/flushometer-flush-valve-types/] - Grease interceptor field guide [https://anvilfield.com/field-guides/plumbing/grease-interceptor-sizing-maintenance/] - Pool and spa mechanical systems [https://anvilfield.com/field-guides/plumbing/swimming-pool-spa-mechanical-systems/] ## ASME B31 - ASME https://anvilfield.com/standards/asme-b31/ Code for Pressure Piping. Sections cited: ASME B31.1, ASME B31.3, ASME B31.9 Applied in 9 Anvilfield field guides, including: - CDU commissioning [https://anvilfield.com/field-guides/datacenter/cdu-coolant-distribution-unit-commissioning/] - Chilled water hydro test package [https://anvilfield.com/field-guides/datacenter/chilled-water-hydro-test-package/] - Compressed air piping design [https://anvilfield.com/field-guides/plumbing/compressed-air-piping-system-design/] - Data center free cooling and economizers [https://anvilfield.com/field-guides/datacenter/data-center-free-cooling-economizer/] - Immersion cooling acceptance [https://anvilfield.com/field-guides/datacenter/immersion-cooling-tank-acceptance/] - Industrial process piping [https://anvilfield.com/field-guides/plumbing/industrial-process-piping-systems/] - Liquid cooling commissioning [https://anvilfield.com/field-guides/datacenter/liquid-cooling-loop-commissioning/] - Pipe joining methods [https://anvilfield.com/field-guides/plumbing/pipe-joining-methods-solder-press-solvent/] - Rear-door heat exchanger commissioning [https://anvilfield.com/field-guides/datacenter/rear-door-heat-exchanger-commissioning/] ## IEEE 1584 - IEEE https://anvilfield.com/standards/ieee-1584/ Guide for Performing Arc-Flash Hazard Calculations. Applied in 9 Anvilfield field guides, including: - 800 V DC fault protection [https://anvilfield.com/field-guides/datacenter/data-center-800v-dc-fault-protection-2026/] - Arc energy reduction methods [https://anvilfield.com/field-guides/electrical/arc-energy-reduction-methods-240-87/] - Arc flash study and labels [https://anvilfield.com/field-guides/electrical/arc-flash-study-labels/] - Available fault current study [https://anvilfield.com/field-guides/electrical/short-circuit-available-fault-current-study/] - Coordination study field guide [https://anvilfield.com/field-guides/datacenter/protective-relay-coordination-study/] - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - One-line diagram field guide [https://anvilfield.com/field-guides/electrical/electrical-one-line-diagram-reading-symbols/] - Panelboard installation [https://anvilfield.com/field-guides/electrical/panelboard-installation-circuit-directory/] - Selective coordination field guide [https://anvilfield.com/field-guides/electrical/selective-coordination-overcurrent/] ## UL 9540A - Underwriters Laboratories https://anvilfield.com/standards/ul-9540a/ Test Method for Thermal Runaway Fire Propagation in Battery Energy Storage Systems. Applied in 9 Anvilfield field guides, including: - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - BESS thermal acceptance [https://anvilfield.com/field-guides/hvac/bess-container-thermal-uniformity-acceptance/] - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] - Rack BBU and ride-through [https://anvilfield.com/field-guides/datacenter/rack-bbu-energy-storage-ride-through/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] - UPS types and technologies [https://anvilfield.com/field-guides/datacenter/ups-types-online-line-interactive-standby/] ## ANSI Z223.1 - ANSI https://anvilfield.com/standards/ansi-z223-1/ National Fuel Gas Code (also NFPA 54). Applied in 8 Anvilfield field guides, including: - Combustion analysis field guide [https://anvilfield.com/field-guides/hvac/combustion-analysis-flue-gas-tuning/] - Gas furnace field guide [https://anvilfield.com/field-guides/hvac/gas-furnace-operation-troubleshooting/] - Gas piping sizing and install guide [https://anvilfield.com/field-guides/plumbing/natural-gas-piping-sizing-install/] - Infrared radiant heater field guide [https://anvilfield.com/field-guides/hvac/hvac-infrared-radiant-tube-heater/] - Outdoor fire feature guide [https://anvilfield.com/field-guides/landscaping/outdoor-fire-feature-pit-fireplace/] - Propane LP-gas system install guide [https://anvilfield.com/field-guides/plumbing/propane-lp-gas-system-install/] - Unit heater field guide [https://anvilfield.com/field-guides/hvac/hvac-unit-heater-gas-electric/] - Water heater venting and combustion air [https://anvilfield.com/field-guides/plumbing/water-heater-venting-combustion-air/] ## ASHRAE 90.4 - ASHRAE https://anvilfield.com/standards/ashrae-90-4/ Energy Standard for Data Centers. Applied in 8 Anvilfield field guides, including: - Aisle containment QA [https://anvilfield.com/field-guides/datacenter/hot-cold-aisle-containment-qa/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - CRAC/CRAH airflow setup [https://anvilfield.com/field-guides/datacenter/crac-crah-static-pressure-airflow/] - Data center cooling system types [https://anvilfield.com/field-guides/datacenter/data-center-cooling-systems-types-overview/] - Data center free cooling and economizers [https://anvilfield.com/field-guides/datacenter/data-center-free-cooling-economizer/] - Data center humidity control [https://anvilfield.com/field-guides/datacenter/data-center-humidity-control-environmental-envelope/] - Delta-T and return temperature [https://anvilfield.com/field-guides/datacenter/delta-t-return-temperature-management/] - In-row cooling commissioning [https://anvilfield.com/field-guides/datacenter/in-row-close-coupled-cooling-commissioning/] ## IEEE 802.3 - IEEE https://anvilfield.com/standards/ieee-802-3/ Standard for Ethernet. Applied in 8 Anvilfield field guides, including: - CCTV system design field guide [https://anvilfield.com/field-guides/electrical/video-surveillance-cctv-system-design/] - Cat6A certification field guide [https://anvilfield.com/field-guides/datacenter/copper-cat6a-certification/] - Fiber splice loss budget [https://anvilfield.com/field-guides/datacenter/fiber-splice-loss-budget/] - GPU network optics and cabling [https://anvilfield.com/field-guides/datacenter/data-center-gpu-network-optics-cabling/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - MPO/MTP polarity methods [https://anvilfield.com/field-guides/datacenter/mpo-mtp-polarity-methods/] - Optical circuit switch and photonics [https://anvilfield.com/field-guides/datacenter/optical-circuit-switch-photonics/] - Spine-leaf network architecture [https://anvilfield.com/field-guides/datacenter/data-center-network-architecture-spine-leaf/] ## NFPA 101 - National Fire Protection Association https://anvilfield.com/standards/nfpa-101/ Life Safety Code. Applied in 8 Anvilfield field guides, including: - Access control system field guide [https://anvilfield.com/field-guides/electrical/access-control-system-installation/] - Commercial lighting design [https://anvilfield.com/field-guides/electrical/commercial-lighting-design-footcandles-controls/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Data center physical security field guide [https://anvilfield.com/field-guides/datacenter/data-center-physical-security-access-control/] - Emergency and egress lighting [https://anvilfield.com/field-guides/electrical/emergency-egress-lighting-inverter/] - Emergency and standby power systems [https://anvilfield.com/field-guides/electrical/emergency-standby-power-systems-nec-700/] - Whitespace footcandle verification [https://anvilfield.com/field-guides/datacenter/whitespace-footcandle-verification/] ## NFPA 25 - National Fire Protection Association https://anvilfield.com/standards/nfpa-25/ Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. Applied in 8 Anvilfield field guides, including: - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Dry-pipe and pre-action trip test [https://anvilfield.com/field-guides/datacenter/dry-pipe-preaction-trip-test/] - Fire protection retrofit demand [https://anvilfield.com/field-guides/market-intelligence/firestop-and-fire-protection-equipment-makers-retrofit-demand-in-existing-buildings/] - Fire pump acceptance test [https://anvilfield.com/field-guides/datacenter/fire-pump-acceptance-test/] - Fire pump and standpipe guide [https://anvilfield.com/field-guides/plumbing/fire-pump-standpipe-system-design/] - Fire sprinkler system design guide [https://anvilfield.com/field-guides/plumbing/fire-sprinkler-system-design-nfpa13/] - Fire watch and impairment [https://anvilfield.com/field-guides/datacenter/fire-watch-patrol-impairment/] ## NFPA 96 - National Fire Protection Association https://anvilfield.com/standards/nfpa-96/ Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. Applied in 8 Anvilfield field guides, including: - Air duct cleaning field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-cleaning-nadca-iaq/] - Ductwork types field guide [https://anvilfield.com/field-guides/hvac/ductwork-types-sheet-metal-flex-ductboard/] - Hood suppression semi-annual guide [https://anvilfield.com/field-guides/hvac/kitchen-hood-suppression-semiannual/] - Kitchen equipment install field guide [https://anvilfield.com/field-guides/hvac/commercial-kitchen-equipment-installation/] - Kitchen grease duct field guide [https://anvilfield.com/field-guides/hvac/kitchen-exhaust-grease-duct-nfpa96/] - Makeup air unit field guide [https://anvilfield.com/field-guides/hvac/makeup-air-unit-kitchen-ventilation/] - Sheet metal duct fabrication field guide [https://anvilfield.com/field-guides/hvac/sheet-metal-duct-fabrication-installation/] - Tenant improvement fit-out [https://anvilfield.com/field-guides/concrete/tenant-improvement-fit-out-buildout/] ## Tier III - Standards body https://anvilfield.com/standards/tier-iii/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 8 Anvilfield field guides, including: - Colocation usable power evidence [https://anvilfield.com/field-guides/datacenter/colocation-power-capacity-evidence-register/] - Data center MOP SOP EOP [https://anvilfield.com/field-guides/datacenter/data-center-mop-sop-eop-procedures/] - Data center PM program [https://anvilfield.com/field-guides/datacenter/data-center-maintenance-management-pm-program/] - Data center power distribution chain [https://anvilfield.com/field-guides/datacenter/data-center-power-distribution-chain/] - Data center tier classification [https://anvilfield.com/field-guides/datacenter/data-center-tier-classification-uptime/] - Data center types field guide [https://anvilfield.com/field-guides/datacenter/data-center-types-enterprise-colo-hyperscale-edge/] - Liquid cooling concurrent maintainability [https://anvilfield.com/field-guides/datacenter/liquid-cooling-redundancy-concurrent-maintenance/] - UPS topology and redundancy design [https://anvilfield.com/field-guides/datacenter/ups-topology-redundancy-design/] ## Tier IV - Standards body https://anvilfield.com/standards/tier-iv/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 8 Anvilfield field guides, including: - Colocation usable power evidence [https://anvilfield.com/field-guides/datacenter/colocation-power-capacity-evidence-register/] - Cooling ride-through thermal buffer [https://anvilfield.com/field-guides/datacenter/data-center-cooling-ride-through-thermal-buffer/] - Data center disaster recovery [https://anvilfield.com/field-guides/datacenter/data-center-disaster-recovery-business-continuity/] - Data center power distribution chain [https://anvilfield.com/field-guides/datacenter/data-center-power-distribution-chain/] - Data center tier classification [https://anvilfield.com/field-guides/datacenter/data-center-tier-classification-uptime/] - Data center types field guide [https://anvilfield.com/field-guides/datacenter/data-center-types-enterprise-colo-hyperscale-edge/] - Liquid cooling concurrent maintainability [https://anvilfield.com/field-guides/datacenter/liquid-cooling-redundancy-concurrent-maintenance/] - UPS topology and redundancy design [https://anvilfield.com/field-guides/datacenter/ups-topology-redundancy-design/] ## UL 9540 - Underwriters Laboratories https://anvilfield.com/standards/ul-9540/ Standard for Energy Storage Systems and Equipment. Applied in 8 Anvilfield field guides, including: - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] - Rack BBU and ride-through [https://anvilfield.com/field-guides/datacenter/rack-bbu-energy-storage-ride-through/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] - UPS types and technologies [https://anvilfield.com/field-guides/datacenter/ups-types-online-line-interactive-standby/] ## ACI 330 - American Concrete Institute https://anvilfield.com/standards/aci-330/ Guide for the Design and Construction of Concrete Parking Lots. Sections cited: ACI 330R Applied in 7 Anvilfield field guides, including: - Asphalt vs concrete pavement [https://anvilfield.com/field-guides/paving/asphalt-vs-concrete-pavement-comparison/] - Concrete curb, gutter, and sidewalk [https://anvilfield.com/field-guides/paving/concrete-curb-gutter-sidewalk-flatwork/] - Concrete driveway installation [https://anvilfield.com/field-guides/concrete/concrete-driveway-installation/] - Concrete pavement jointing and curing [https://anvilfield.com/field-guides/paving/concrete-pavement-jointing-curing/] - Concrete pavement types [https://anvilfield.com/field-guides/paving/concrete-pavement-types-jpcp-crcp/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Slab on grade design and thickness [https://anvilfield.com/field-guides/concrete/slab-on-grade-design-thickness/] ## ACI 360 - American Concrete Institute https://anvilfield.com/standards/aci-360/ Guide to Design of Slabs-on-Ground. Sections cited: ACI 360R, ACI 360R-10 Applied in 7 Anvilfield field guides, including: - Concrete crack types and causes [https://anvilfield.com/field-guides/concrete/concrete-crack-types-causes-prevention/] - Concrete driveway installation [https://anvilfield.com/field-guides/concrete/concrete-driveway-installation/] - Control joint layout [https://anvilfield.com/field-guides/concrete/construction-control-joint-layout/] - Fiber-reinforced concrete [https://anvilfield.com/field-guides/concrete/fiber-reinforced-concrete-design-use/] - RV wheel and outrigger slab inputs [https://anvilfield.com/field-guides/concrete/rv-slab-wheel-outrigger-design-inputs/] - Slab curling and warping control [https://anvilfield.com/field-guides/concrete/concrete-slab-curling-warping-control/] - Slab on grade design and thickness [https://anvilfield.com/field-guides/concrete/slab-on-grade-design-thickness/] ## ASHRAE 180 - ASHRAE https://anvilfield.com/standards/ashrae-180/ A published standard from ASHRAE, referenced across the Anvilfield field guides below. Applied in 7 Anvilfield field guides, including: - ASHRAE 180 and OEM RTU schedules [https://anvilfield.com/field-guides/hvac/rtu-maintenance-interval-ashrae180-oem-crosswalk/] - Commercial RTU maintenance agreement pricing [https://anvilfield.com/field-guides/hvac/price-commercial-rtu-maintenance-agreement/] - Commercial RTU service life [https://anvilfield.com/field-guides/hvac/commercial-rtu-service-life-ashrae-table/] - First school HVAC bid checklist [https://anvilfield.com/field-guides/hvac/first-school-hvac-bid-checklist/] - HVAC preventive maintenance guide [https://anvilfield.com/field-guides/hvac/hvac-preventive-maintenance-program/] - Hydronic water and glycol field guide [https://anvilfield.com/field-guides/hvac/hydronic-makeup-water-glycol-treatment/] - Maintenance service-level measurement [https://anvilfield.com/field-guides/hvac/maintenance-service-level-measurement/] ## ASHRAE 34 - ASHRAE https://anvilfield.com/standards/ashrae-34/ Designation and Safety Classification of Refrigerants. Applied in 7 Anvilfield field guides, including: - Chiller types and selection [https://anvilfield.com/field-guides/hvac/chiller-types-selection-centrifugal-screw-scroll/] - Refrigerant charging field guide [https://anvilfield.com/field-guides/hvac/refrigerant-charging-subcool-superheat/] - Refrigerant leak detection field guide [https://anvilfield.com/field-guides/hvac/refrigerant-leak-detection-recovery/] - Refrigerant line sizing field guide [https://anvilfield.com/field-guides/hvac/refrigerant-piping-line-sizing-design/] - Refrigerant types and A2L [https://anvilfield.com/field-guides/hvac/refrigerant-types-a2l-transition/] - Refrigeration cycle field guide [https://anvilfield.com/field-guides/hvac/refrigeration-cycle-fundamentals/] - VRF commissioning field guide [https://anvilfield.com/field-guides/hvac/vrf-system-commissioning-startup/] ## ASHRAE Guideline 36 - ASHRAE https://anvilfield.com/standards/ashrae-guideline-36/ High-Performance Sequences of Operation for HVAC Systems. Applied in 7 Anvilfield field guides, including: - BAS and DDC controls field guide [https://anvilfield.com/field-guides/hvac/hvac-bas-ddc-controls-fundamentals/] - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Data center free cooling and economizers [https://anvilfield.com/field-guides/datacenter/data-center-free-cooling-economizer/] - Economizer fault detection field guide [https://anvilfield.com/field-guides/hvac/air-side-economizer-fault-detection/] - FDD and building analytics field guide [https://anvilfield.com/field-guides/hvac/building-automation-fault-detection-diagnostics/] - VAV box commissioning field guide [https://anvilfield.com/field-guides/hvac/vav-box-commissioning-airflow/] - VAV vs CAV air distribution [https://anvilfield.com/field-guides/hvac/vav-cav-air-distribution-systems/] ## ASTM C143 - ASTM International https://anvilfield.com/standards/astm-c143/ Test Method for Slump of Hydraulic-Cement Concrete. Applied in 7 Anvilfield field guides, including: - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Placement and consolidation [https://anvilfield.com/field-guides/concrete/concrete-placement-consolidation-vibration/] - Ready-mix ordering and delivery [https://anvilfield.com/field-guides/concrete/ready-mix-concrete-ordering-delivery/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM C1583 - ASTM International https://anvilfield.com/standards/astm-c1583/ Test Method for Tensile Strength of Concrete Surfaces (pull-off) for repair bond. Sections cited: ASTM C1583/C1583M-25 Applied in 7 Anvilfield field guides, including: - C1583 pull-off interpretation [https://anvilfield.com/field-guides/concrete/concrete-repair-pull-off-testing-c1583/] - Concrete diagnostic test selection [https://anvilfield.com/field-guides/concrete/concrete-diagnostic-test-selection/] - Concrete overlay and resurfacing [https://anvilfield.com/field-guides/concrete/concrete-overlay-resurfacing-decorative/] - Concrete sealers and coatings [https://anvilfield.com/field-guides/concrete/concrete-sealers-coatings-protection/] - Concrete spall repair [https://anvilfield.com/field-guides/concrete/concrete-repair-spall-restoration/] - Corroded PT tendon repair scope [https://anvilfield.com/field-guides/concrete/post-tension-tendon-corrosion-repair/] - Parking structure restoration [https://anvilfield.com/field-guides/concrete/parking-structure-restoration-repair/] ## ASTM C309 - ASTM International https://anvilfield.com/standards/astm-c309/ Specification for Liquid Membrane-Forming Compounds for Curing Concrete. Applied in 7 Anvilfield field guides, including: - Concrete coloring and staining [https://anvilfield.com/field-guides/concrete/concrete-coloring-staining-decorative/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete pavement jointing and curing [https://anvilfield.com/field-guides/paving/concrete-pavement-jointing-curing/] - Concrete sealers and coatings [https://anvilfield.com/field-guides/concrete/concrete-sealers-coatings-protection/] - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] ## IFGC - International Code Council https://anvilfield.com/standards/ifgc/ International Fuel Gas Code. Applied in 7 Anvilfield field guides, including: - Building pressurization field guide [https://anvilfield.com/field-guides/hvac/building-pressurization-control-makeup-air/] - Combustion analysis field guide [https://anvilfield.com/field-guides/hvac/combustion-analysis-flue-gas-tuning/] - Gas piping sizing and install guide [https://anvilfield.com/field-guides/plumbing/natural-gas-piping-sizing-install/] - Outdoor kitchen construction guide [https://anvilfield.com/field-guides/landscaping/outdoor-kitchen-construction-installation/] - Plumbing permit and inspection guide [https://anvilfield.com/field-guides/plumbing/plumbing-permit-inspection-process/] - Propane LP-gas system install guide [https://anvilfield.com/field-guides/plumbing/propane-lp-gas-system-install/] - Water heater venting and combustion air [https://anvilfield.com/field-guides/plumbing/water-heater-venting-combustion-air/] ## ISO/IEC 30134 - Standards body https://anvilfield.com/standards/iso-iec-30134/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 7 Anvilfield field guides, including: - Data center PUE and energy efficiency [https://anvilfield.com/field-guides/datacenter/data-center-pue-energy-efficiency/] - Data center TCO cost model [https://anvilfield.com/field-guides/datacenter/data-center-tco-cost-model/] - Data center sustainability reporting [https://anvilfield.com/field-guides/datacenter/data-center-sustainability-reporting-metrics/] - Data center water use and WUE [https://anvilfield.com/field-guides/datacenter/data-center-water-use-cooling-wue/] - Idle GPU facility cost [https://anvilfield.com/field-guides/datacenter/gpu-idle-power-facility-cost-model/] - Meter-to-IT electrical loss budget [https://anvilfield.com/field-guides/datacenter/data-center-electrical-loss-budget/] - Power density and capacity planning [https://anvilfield.com/field-guides/datacenter/data-center-power-density-capacity-planning/] ## NFPA 99 - National Fire Protection Association https://anvilfield.com/standards/nfpa-99/ Health Care Facilities Code. Applied in 7 Anvilfield field guides, including: - Emergency and standby power systems [https://anvilfield.com/field-guides/electrical/emergency-standby-power-systems-nec-700/] - Generator load bank testing [https://anvilfield.com/field-guides/electrical/electrical-generator-load-bank-testing/] - Lab and process vacuum systems [https://anvilfield.com/field-guides/plumbing/laboratory-process-vacuum-system/] - Medical gas piping field guide [https://anvilfield.com/field-guides/plumbing/medical-gas-piping-install-certification/] - PEX, copper, and CPVC methods [https://anvilfield.com/field-guides/plumbing/pex-copper-cpvc-piping-methods/] - Pipe joining methods [https://anvilfield.com/field-guides/plumbing/pipe-joining-methods-solder-press-solvent/] - Plumbing pressure test guide [https://anvilfield.com/field-guides/plumbing/hydrostatic-pressure-test-plumbing/] ## TIA-607 - Standards body https://anvilfield.com/standards/tia-607/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 7 Anvilfield field guides, including: - Data center cabinet and rack types [https://anvilfield.com/field-guides/datacenter/data-center-cabinet-rack-types-selection/] - Data center grounding and SRG [https://anvilfield.com/field-guides/datacenter/data-center-grounding-signal-reference-grid/] - Data center structured cabling [https://anvilfield.com/field-guides/datacenter/datacenter-structured-cabling-overview/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - Rack readiness field guide [https://anvilfield.com/field-guides/datacenter/rack-readiness-floor-load-layout/] - Rack-and-stack deployment field guide [https://anvilfield.com/field-guides/datacenter/it-equipment-rack-stack-deployment-migration/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] ## ACI 117 - American Concrete Institute https://anvilfield.com/standards/aci-117/ Specification for Tolerances for Concrete Construction and Materials. Applied in 6 Anvilfield field guides, including: - Construction layout [https://anvilfield.com/field-guides/concrete/construction-layout-total-station-gps/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Floor flatness and levelness [https://anvilfield.com/field-guides/datacenter/floor-flatness-levelness-ff-fl/] - Laser screed and screeding methods [https://anvilfield.com/field-guides/concrete/laser-screed-concrete-screeding-methods/] - Rebar pre-pour inspection [https://anvilfield.com/field-guides/concrete/rebar-placement-cover-inspection/] - Slab curling and warping control [https://anvilfield.com/field-guides/concrete/concrete-slab-curling-warping-control/] ## ACI 305 - American Concrete Institute https://anvilfield.com/standards/aci-305/ Guide to Hot Weather Concreting. Sections cited: ACI 305.1, ACI 305.1-14, ACI 305R Applied in 6 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Evaporation rate and plastic cracking [https://anvilfield.com/field-guides/concrete/concrete-evaporation-rate-plastic-cracking/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] ## ACI 306 - American Concrete Institute https://anvilfield.com/standards/aci-306/ Guide to Cold Weather Concreting. Sections cited: ACI 306.1, ACI 306R Applied in 6 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Evaporation rate and plastic cracking [https://anvilfield.com/field-guides/concrete/concrete-evaporation-rate-plastic-cracking/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] ## ACI 308 - American Concrete Institute https://anvilfield.com/standards/aci-308/ Guide to External Curing of Concrete. Applied in 6 Anvilfield field guides, including: - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete driveway installation [https://anvilfield.com/field-guides/concrete/concrete-driveway-installation/] - Concrete surface defects diagnosis [https://anvilfield.com/field-guides/concrete/concrete-surface-defects-diagnosis/] - Evaporation rate and plastic cracking [https://anvilfield.com/field-guides/concrete/concrete-evaporation-rate-plastic-cracking/] - Flatwork finishing sequence [https://anvilfield.com/field-guides/concrete/flatwork-finishing-sequence/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] ## ASTM C1074 - ASTM International https://anvilfield.com/standards/astm-c1074/ Practice for Estimating Concrete Strength by the Maturity Method. Applied in 6 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete maturity method [https://anvilfield.com/field-guides/concrete/concrete-maturity-method-temperature-monitoring/] - Concrete pavement jointing and curing [https://anvilfield.com/field-guides/paving/concrete-pavement-jointing-curing/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Connected jobsite and RTLS [https://anvilfield.com/field-guides/datacenter/jobsite-iot-rtls-connected-jobsite/] ## ASTM C876 - ASTM International https://anvilfield.com/standards/astm-c876/ Test Method for Corrosion Potentials of Uncoated Reinforcing Steel in Concrete. Sections cited: ASTM C876-09 Applied in 6 Anvilfield field guides, including: - Concrete diagnostic test selection [https://anvilfield.com/field-guides/concrete/concrete-diagnostic-test-selection/] - Concrete spall repair [https://anvilfield.com/field-guides/concrete/concrete-repair-spall-restoration/] - Corroded PT tendon repair scope [https://anvilfield.com/field-guides/concrete/post-tension-tendon-corrosion-repair/] - Half-cell potential survey interpretation [https://anvilfield.com/field-guides/concrete/half-cell-potential-survey-interpretation/] - Parking structure restoration [https://anvilfield.com/field-guides/concrete/parking-structure-restoration-repair/] - Rebar corrosion protection [https://anvilfield.com/field-guides/concrete/rebar-corrosion-protection-epoxy-galvanized/] ## ASTM D2041 - ASTM International https://anvilfield.com/standards/astm-d2041/ Test Method for Theoretical Maximum Specific Gravity of Asphalt Mixtures (Rice). Applied in 6 Anvilfield field guides, including: - Asphalt compaction window [https://anvilfield.com/field-guides/paving/asphalt-compaction-window-guide/] - Asphalt density testing [https://anvilfield.com/field-guides/paving/asphalt-density-compaction-testing/] - Asphalt mill and overlay [https://anvilfield.com/field-guides/paving/asphalt-mill-overlay-resurfacing/] - Asphalt paving inspection [https://anvilfield.com/field-guides/paving/asphalt-paving-inspection-quality-control/] - Cold-weather asphalt paving [https://anvilfield.com/field-guides/paving/asphalt-paving-cold-weather-temperature-limits/] - Warm mix asphalt (WMA) [https://anvilfield.com/field-guides/paving/warm-mix-asphalt-wma/] ## ASTM D2950 - ASTM International https://anvilfield.com/standards/astm-d2950/ Test Method for Density of Asphalt Mixtures in Place by Nuclear Methods. Applied in 6 Anvilfield field guides, including: - Asphalt compaction window [https://anvilfield.com/field-guides/paving/asphalt-compaction-window-guide/] - Asphalt density testing [https://anvilfield.com/field-guides/paving/asphalt-density-compaction-testing/] - Asphalt mill and overlay [https://anvilfield.com/field-guides/paving/asphalt-mill-overlay-resurfacing/] - Asphalt paving inspection [https://anvilfield.com/field-guides/paving/asphalt-paving-inspection-quality-control/] - Cold-weather asphalt paving [https://anvilfield.com/field-guides/paving/asphalt-paving-cold-weather-temperature-limits/] - Warm mix asphalt (WMA) [https://anvilfield.com/field-guides/paving/warm-mix-asphalt-wma/] ## ASTM D6083 - ASTM International https://anvilfield.com/standards/astm-d6083/ Specification for Liquid-Applied Acrylic Coating Used in Roofing. Sections cited: ASTM D6083/D6083M-24 Applied in 6 Anvilfield field guides, including: - ASTM roof coating ratings [https://anvilfield.com/field-guides/roofing/astm-roof-coating-properties-field-meaning/] - Coated-roof maintenance and renewal [https://anvilfield.com/field-guides/roofing/roof-coating-recoat-interval-condition-table/] - Roof coating adhesion tests [https://anvilfield.com/field-guides/roofing/roof-coating-adhesion-test-comparison/] - Roof coating mils and yield [https://anvilfield.com/field-guides/roofing/roof-coating-mil-thickness-yield/] - Roof coating restoration system [https://anvilfield.com/field-guides/roofing/low-slope-roof-coating-restoration-system/] - SPF roof field guide [https://anvilfield.com/field-guides/roofing/spray-polyurethane-foam-spf-roof/] ## NFPA 76 - National Fire Protection Association https://anvilfield.com/standards/nfpa-76/ Standard for the Fire Protection of Telecommunications Facilities. Applied in 6 Anvilfield field guides, including: - Aspirating smoke detection [https://anvilfield.com/field-guides/datacenter/aspirating-smoke-detection-vesda/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] - Dry-pipe and pre-action trip test [https://anvilfield.com/field-guides/datacenter/dry-pipe-preaction-trip-test/] - EPO testing field guide [https://anvilfield.com/field-guides/datacenter/emergency-power-off-epo-testing/] - Raised floor acceptance packet [https://anvilfield.com/field-guides/datacenter/raised-floor-acceptance-packet/] ## ANSI Z60.1 - ANSI https://anvilfield.com/standards/ansi-z60-1/ American Standard for Nursery Stock. Applied in 5 Anvilfield field guides, including: - Landscape design and plant selection [https://anvilfield.com/field-guides/landscaping/landscape-design-principles-plant-selection/] - Landscape estimating and bidding [https://anvilfield.com/field-guides/landscaping/landscape-estimating-bidding/] - Tree and shrub planting [https://anvilfield.com/field-guides/landscaping/tree-shrub-planting-establishment/] - Tree staking and guying [https://anvilfield.com/field-guides/landscaping/tree-staking-guying-support/] - Tree transplanting [https://anvilfield.com/field-guides/landscaping/tree-transplanting-large-tree-moving/] ## ASHRAE 202 - ASHRAE https://anvilfield.com/standards/ashrae-202/ Commissioning Process for Buildings and Systems. Applied in 5 Anvilfield field guides, including: - BMS and DDC controls commissioning [https://anvilfield.com/field-guides/datacenter/bms-ddc-controls-commissioning/] - Data center commissioning levels [https://anvilfield.com/field-guides/datacenter/data-center-commissioning-levels-process/] - Data center commissioning process [https://anvilfield.com/field-guides/datacenter/datacenter-commissioning-operations-overview/] - Integrated systems test (IST) [https://anvilfield.com/field-guides/datacenter/integrated-systems-test-ist-commissioning/] - Retro-commissioning existing buildings [https://anvilfield.com/field-guides/hvac/retro-commissioning-existing-buildings/] ## ASHRAE 55 - ASHRAE https://anvilfield.com/standards/ashrae-55/ Thermal Environmental Conditions for Human Occupancy. Applied in 5 Anvilfield field guides, including: - DOAS field guide [https://anvilfield.com/field-guides/hvac/dedicated-outdoor-air-system-doas/] - Diffusers, grilles, and registers field guide [https://anvilfield.com/field-guides/hvac/hvac-air-distribution-diffusers-grilles-registers/] - Humidity control field guide [https://anvilfield.com/field-guides/hvac/humidification-dehumidification-control/] - IAQ investigation and testing field guide [https://anvilfield.com/field-guides/hvac/indoor-air-quality-investigation-testing/] - Psychrometric chart [https://anvilfield.com/field-guides/hvac/psychrometric-chart-reading-field-guide/] ## ASTM C1064 - ASTM International https://anvilfield.com/standards/astm-c1064/ Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete. Applied in 5 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Evaporation rate and plastic cracking [https://anvilfield.com/field-guides/concrete/concrete-evaporation-rate-plastic-cracking/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] ## ASTM C1152 - ASTM International https://anvilfield.com/standards/astm-c1152/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM C1152/C1152M, ASTM C1152/C1152M-20 Applied in 5 Anvilfield field guides, including: - Chloride profiles and service life [https://anvilfield.com/field-guides/concrete/concrete-chloride-profile-service-life/] - Concrete diagnostic test selection [https://anvilfield.com/field-guides/concrete/concrete-diagnostic-test-selection/] - Corroded PT tendon repair scope [https://anvilfield.com/field-guides/concrete/post-tension-tendon-corrosion-repair/] - Half-cell potential survey interpretation [https://anvilfield.com/field-guides/concrete/half-cell-potential-survey-interpretation/] - Parking structure restoration [https://anvilfield.com/field-guides/concrete/parking-structure-restoration-repair/] ## ASTM C138 - ASTM International https://anvilfield.com/standards/astm-c138/ Test Method for Density (Unit Weight), Yield, and Air Content of Concrete. Applied in 5 Anvilfield field guides, including: - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Lightweight concrete [https://anvilfield.com/field-guides/concrete/lightweight-concrete-structural-insulating/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM C231 - ASTM International https://anvilfield.com/standards/astm-c231/ Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method. Applied in 5 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] ## ASTM C94 - ASTM International https://anvilfield.com/standards/astm-c94/ Specification for Ready-Mixed Concrete. Applied in 5 Anvilfield field guides, including: - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Ready-mix ordering and delivery [https://anvilfield.com/field-guides/concrete/ready-mix-concrete-ordering-delivery/] ## ASTM D6694 - ASTM International https://anvilfield.com/standards/astm-d6694/ Specification for Liquid-Applied Silicone Coating Used in Spray Polyurethane Foam Roofing. Sections cited: ASTM D6694/D6694M-25 Applied in 5 Anvilfield field guides, including: - ASTM roof coating ratings [https://anvilfield.com/field-guides/roofing/astm-roof-coating-properties-field-meaning/] - Roof coating adhesion tests [https://anvilfield.com/field-guides/roofing/roof-coating-adhesion-test-comparison/] - Roof coating mils and yield [https://anvilfield.com/field-guides/roofing/roof-coating-mil-thickness-yield/] - Roof coating restoration system [https://anvilfield.com/field-guides/roofing/low-slope-roof-coating-restoration-system/] - SPF roof field guide [https://anvilfield.com/field-guides/roofing/spray-polyurethane-foam-spf-roof/] ## ASTM D7954 - ASTM International https://anvilfield.com/standards/astm-d7954/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM D7954/D7954M Applied in 5 Anvilfield field guides, including: - Infrared roof moisture confirmation [https://anvilfield.com/field-guides/roofing/infrared-roof-moisture-survey-interpretation/] - Roof blister investigation [https://anvilfield.com/field-guides/roofing/roof-blister-investigation-repair-boundaries/] - Roof evidence for a property sale [https://anvilfield.com/field-guides/roofing/roof-condition-property-transaction-evidence/] - Roof repair or replacement: 10-year break-even [https://anvilfield.com/field-guides/roofing/roof-repair-replace-ten-year-break-even/] - Roof restoration prospect qualification [https://anvilfield.com/field-guides/roofing/qualify-roof-restoration-prospects/] ## ASTM E1745 - ASTM International https://anvilfield.com/standards/astm-e1745/ Specification for Water Vapor Retarders Used Under Concrete Slabs on Grade. Applied in 5 Anvilfield field guides, including: - Below-grade waterproofing [https://anvilfield.com/field-guides/concrete/below-grade-foundation-waterproofing/] - Slab moisture testing for flooring [https://anvilfield.com/field-guides/concrete/slab-moisture-testing-flooring-rh/] - Slab on grade design and thickness [https://anvilfield.com/field-guides/concrete/slab-on-grade-design-thickness/] - Terrazzo flooring install and polish [https://anvilfield.com/field-guides/concrete/terrazzo-flooring-installation-polishing/] - Under-slab vapor barrier and slab moisture [https://anvilfield.com/field-guides/concrete/under-slab-vapor-barrier-moisture/] ## IEEE 1547 - IEEE https://anvilfield.com/standards/ieee-1547/ Standard for Interconnection of Distributed Energy Resources with Electric Power Systems. Applied in 5 Anvilfield field guides, including: - BESS commissioning punch list [https://anvilfield.com/field-guides/datacenter/bess-commissioning-punch-list/] - Data center grid flexibility [https://anvilfield.com/field-guides/datacenter/data-center-grid-flexibility-demand-response/] - Data center on-site generation [https://anvilfield.com/field-guides/datacenter/data-center-onsite-generation-fuel-cell-microgrid/] - Generator paralleling [https://anvilfield.com/field-guides/electrical/electrical-generator-paralleling-synchronization/] - Solar and diesel transfer acceptance [https://anvilfield.com/field-guides/electrical/solar-diesel-transfer-acceptance/] ## IFC - International Code Council https://anvilfield.com/standards/ifc/ International Fire Code. Applied in 5 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Building movement joint systems [https://anvilfield.com/field-guides/concrete/building-expansion-movement-joint-systems/] - DAS and public-safety radio [https://anvilfield.com/field-guides/electrical/das-in-building-wireless-public-safety/] - Rooftop solar mounting and racking [https://anvilfield.com/field-guides/roofing/rooftop-solar-pv-mounting-racking/] - Solar-ready roof provisions [https://anvilfield.com/field-guides/roofing/solar-ready-pv-roof-provisions/] ## IICRC S520 - IICRC https://anvilfield.com/standards/iicrc-s520/ Standard for Professional Mold Remediation. Applied in 5 Anvilfield field guides, including: - Concealed-cavity drying verification [https://anvilfield.com/field-guides/plumbing/concealed-cavity-drying-verification/] - Fire and smoke damage restoration field guide [https://anvilfield.com/field-guides/plumbing/fire-smoke-damage-restoration-iicrc-s700/] - Mold remediation field guide [https://anvilfield.com/field-guides/hvac/mold-remediation-iaq-iicrc-s520/] - Water damage restoration field guide [https://anvilfield.com/field-guides/plumbing/water-damage-restoration-mitigation-iicrc-s500/] - Water mitigation and drying guide [https://anvilfield.com/field-guides/plumbing/water-damage-mitigation-structural-drying/] ## NFPA 780 - National Fire Protection Association https://anvilfield.com/standards/nfpa-780/ Standard for the Installation of Lightning Protection Systems. Applied in 5 Anvilfield field guides, including: - Data center grounding and SRG [https://anvilfield.com/field-guides/datacenter/data-center-grounding-signal-reference-grid/] - Grounding vs bonding explained [https://anvilfield.com/field-guides/electrical/grounding-vs-bonding-explained/] - Lightning protection (NFPA 780) [https://anvilfield.com/field-guides/electrical/lightning-protection-system-nfpa780/] - SPD installation field guide [https://anvilfield.com/field-guides/datacenter/surge-protection-spd-installation/] - Surge protection (SPD) field guide [https://anvilfield.com/field-guides/electrical/electrical-surge-protection-spd-types-nec/] ## TIA-569 - Standards body https://anvilfield.com/standards/tia-569/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 5 Anvilfield field guides, including: - Cable tray fill and copper takeoff [https://anvilfield.com/field-guides/datacenter/cable-tray-fill-copper-takeoff/] - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Data center structured cabling [https://anvilfield.com/field-guides/datacenter/datacenter-structured-cabling-overview/] - Low-voltage and Class 2 cabling [https://anvilfield.com/field-guides/electrical/low-voltage-class2-systems-cabling/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] ## ACI 355 - American Concrete Institute https://anvilfield.com/standards/aci-355/ Anchorage to concrete: qualification and design of cast-in and post-installed anchors. Sections cited: ACI 355.2, ACI 355.4 Applied in 4 Anvilfield field guides, including: - Anchor bolt and baseplate grout QA [https://anvilfield.com/field-guides/datacenter/anchor-bolt-baseplate-grout-qa/] - Concrete anchor installation [https://anvilfield.com/field-guides/concrete/concrete-anchor-fastener-installation/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Metal railing and guardrail fabrication [https://anvilfield.com/field-guides/concrete/metal-railing-guardrail-fabrication/] ## ANSI/ESD S20.20 - ANSI https://anvilfield.com/standards/ansi-esd-s20-20/ A published standard from ANSI, referenced across the Anvilfield field guides below. Applied in 4 Anvilfield field guides, including: - ESD floor testing field guide [https://anvilfield.com/field-guides/datacenter/esd-floor-testing-s20-20/] - Raised access floor installation [https://anvilfield.com/field-guides/datacenter/raised-access-floor-installation/] - Raised floor acceptance packet [https://anvilfield.com/field-guides/datacenter/raised-floor-acceptance-packet/] - Raised floor load rating test [https://anvilfield.com/field-guides/datacenter/raised-floor-load-rating-test/] ## ASHRAE Guideline 12 - ASHRAE https://anvilfield.com/standards/ashrae-guideline-12/ Managing the Risk of Legionellosis Associated with Building Water Systems. Applied in 4 Anvilfield field guides, including: - Cooling tower commissioning [https://anvilfield.com/field-guides/hvac/cooling-tower-commissioning-water-treatment/] - Hot water recirculation loops [https://anvilfield.com/field-guides/plumbing/water-heater-recirculation-sizing/] - Mixing valves, scald, and Legionella [https://anvilfield.com/field-guides/plumbing/thermostatic-mixing-valve-scald-legionella/] - Water heater sizing and selection [https://anvilfield.com/field-guides/plumbing/water-heater-sizing-selection/] ## ASTM C172 - ASTM International https://anvilfield.com/standards/astm-c172/ Practice for Sampling Freshly Mixed Concrete. Applied in 4 Anvilfield field guides, including: - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM C173 - ASTM International https://anvilfield.com/standards/astm-c173/ Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method. Applied in 4 Anvilfield field guides, including: - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] ## ASTM C260 - ASTM International https://anvilfield.com/standards/astm-c260/ Specification for Air-Entraining Admixtures for Concrete. Applied in 4 Anvilfield field guides, including: - Air entrainment [https://anvilfield.com/field-guides/concrete/air-entrainment-freeze-thaw-durability/] - Cold weather concreting [https://anvilfield.com/field-guides/concrete/cold-weather-concreting-protection/] - Concrete admixtures [https://anvilfield.com/field-guides/concrete/concrete-admixtures-types-guide/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] ## ASTM C42 - ASTM International https://anvilfield.com/standards/astm-c42/ Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete. Sections cited: ASTM C42/C42M-20 Applied in 4 Anvilfield field guides, including: - Concrete diagnostic test selection [https://anvilfield.com/field-guides/concrete/concrete-diagnostic-test-selection/] - Concrete strength testing with cylinders [https://anvilfield.com/field-guides/concrete/concrete-strength-testing-cylinders/] - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Strength cylinders and acceptance [https://anvilfield.com/field-guides/datacenter/slab-strength-acceptance-cylinders/] ## ASTM D226 - ASTM International https://anvilfield.com/standards/astm-d226/ Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing. Applied in 4 Anvilfield field guides, including: - Roofing underlayment types [https://anvilfield.com/field-guides/roofing/roofing-underlayment-types-felt-synthetic/] - Siding installation [https://anvilfield.com/field-guides/roofing/siding-installation-vinyl-fiber-cement/] - Steep-slope shingle roofing [https://anvilfield.com/field-guides/roofing/steep-slope-asphalt-shingle-roofing/] - Wood shake and shingle roofing [https://anvilfield.com/field-guides/roofing/wood-shake-shingle-roof-installation/] ## ASTM D7234 - ASTM International https://anvilfield.com/standards/astm-d7234/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM D7234-22 Applied in 4 Anvilfield field guides, including: - C1583 pull-off interpretation [https://anvilfield.com/field-guides/concrete/concrete-repair-pull-off-testing-c1583/] - Epoxy resinous floor coating install [https://anvilfield.com/field-guides/concrete/epoxy-resinous-floor-coating-install/] - Exterior paint peeling: find the failed layer [https://anvilfield.com/field-guides/concrete/exterior-paint-peeling-failure-diagnosis/] - Roof coating adhesion tests [https://anvilfield.com/field-guides/roofing/roof-coating-adhesion-test-comparison/] ## ASTM E1105 - ASTM International https://anvilfield.com/standards/astm-e1105/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM E1105-26 Applied in 4 Anvilfield field guides, including: - Commercial skylight replacement cost [https://anvilfield.com/field-guides/roofing/commercial-skylight-replacement-cost-quantity/] - Commercial wall cladding [https://anvilfield.com/field-guides/roofing/wall-cladding-systems-commercial-buildings/] - Curtain wall and glazing [https://anvilfield.com/field-guides/concrete/curtain-wall-glazing-storefront-installation/] - Water-loss cause evidence register [https://anvilfield.com/field-guides/plumbing/water-loss-cause-evidence-register/] ## ASTM E119 - ASTM International https://anvilfield.com/standards/astm-e119/ Test Methods for Fire Tests of Building Construction and Materials. Applied in 4 Anvilfield field guides, including: - Calcium silicate board [https://anvilfield.com/field-guides/concrete/calcium-silicate-board/] - Drywall and gypsum board finishing [https://anvilfield.com/field-guides/concrete/drywall-gypsum-board-finishing/] - SPF roof field guide [https://anvilfield.com/field-guides/roofing/spray-polyurethane-foam-spf-roof/] - Structural fireproofing [https://anvilfield.com/field-guides/concrete/structural-fireproofing-sfrm-intumescent/] ## ASTM E2018 - ASTM International https://anvilfield.com/standards/astm-e2018/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM E2018-24 Applied in 4 Anvilfield field guides, including: - FCI: comparable backlog and replacement values [https://anvilfield.com/field-guides/roofing/facility-condition-index-comparable-inputs/] - PCA findings to capital needs [https://anvilfield.com/field-guides/roofing/property-condition-assessment-capital-needs/] - Roof asset management [https://anvilfield.com/field-guides/roofing/roof-asset-management-capital-planning/] - Roof evidence for a property sale [https://anvilfield.com/field-guides/roofing/roof-condition-property-transaction-evidence/] ## ASTM E2393 - ASTM International https://anvilfield.com/standards/astm-e2393/ Practice for On-Site Inspection of Installed Fire-Resistive Joint Systems and Perimeter Fire Barriers. Sections cited: ASTM E2393-24 Applied in 4 Anvilfield field guides, including: - Building movement joint systems [https://anvilfield.com/field-guides/concrete/building-expansion-movement-joint-systems/] - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Pipe penetration firestop guide [https://anvilfield.com/field-guides/plumbing/pipe-penetration-firestop-sleeves/] ## ASTM E814 - ASTM International https://anvilfield.com/standards/astm-e814/ Test Method for Fire Tests of Penetration Firestop Systems. Applied in 4 Anvilfield field guides, including: - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Drywall and gypsum board finishing [https://anvilfield.com/field-guides/concrete/drywall-gypsum-board-finishing/] - Pipe penetration firestop guide [https://anvilfield.com/field-guides/plumbing/pipe-penetration-firestop-sleeves/] - Structural fireproofing [https://anvilfield.com/field-guides/concrete/structural-fireproofing-sfrm-intumescent/] ## ASTM F2200 - ASTM International https://anvilfield.com/standards/astm-f2200/ Specification for Automated Vehicular Gate Construction. Applied in 4 Anvilfield field guides, including: - Automatic gate operator field guide [https://anvilfield.com/field-guides/electrical/automatic-gate-operator-installation/] - Commercial fence and gate install [https://anvilfield.com/field-guides/landscaping/commercial-fence-gate-installation/] - Industrial fence and perimeter demand [https://anvilfield.com/field-guides/market-intelligence/fencing-manufacturers-industrial-yard-and-perimeter-demand/] - Overhead door and dock leveler field guide [https://anvilfield.com/field-guides/electrical/overhead-door-dock-leveler-installation/] ## ASTM F710 - ASTM International https://anvilfield.com/standards/astm-f710/ Practice for Preparing Concrete Floors to Receive Resilient Flooring. Sections cited: ASTM F710-26 Applied in 4 Anvilfield field guides, including: - Commercial resilient flooring install [https://anvilfield.com/field-guides/concrete/commercial-flooring-resilient-installation/] - Epoxy resinous floor coating install [https://anvilfield.com/field-guides/concrete/epoxy-resinous-floor-coating-install/] - Self-leveling underlayment floor prep [https://anvilfield.com/field-guides/concrete/self-leveling-underlayment-floor-prep/] - Slab moisture testing for flooring [https://anvilfield.com/field-guides/concrete/slab-moisture-testing-flooring-rh/] ## AWS D1.1 - American Welding Society https://anvilfield.com/standards/aws-d1-1/ Structural Welding Code, Steel. Applied in 4 Anvilfield field guides, including: - Data center structural QA [https://anvilfield.com/field-guides/datacenter/datacenter-concrete-steel-qa-overview/] - Precast erection and connections [https://anvilfield.com/field-guides/concrete/precast-concrete-erection-connections/] - Steel erection and connections [https://anvilfield.com/field-guides/concrete/structural-steel-erection-connections/] - Weld heat input and CWI acceptance [https://anvilfield.com/field-guides/datacenter/weld-heat-input-cwi-acceptance/] ## IEEE 1100 - IEEE https://anvilfield.com/standards/ieee-1100/ Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book). Applied in 4 Anvilfield field guides, including: - Data center grounding and SRG [https://anvilfield.com/field-guides/datacenter/data-center-grounding-signal-reference-grid/] - Grounding vs bonding explained [https://anvilfield.com/field-guides/electrical/grounding-vs-bonding-explained/] - Isolated ground receptacles [https://anvilfield.com/field-guides/electrical/isolated-ground-receptacle-sensitive-equipment/] - PDU and RPP commissioning [https://anvilfield.com/field-guides/datacenter/pdu-rpp-commissioning/] ## IEEE 1184 - IEEE https://anvilfield.com/standards/ieee-1184/ Guide for Batteries for Uninterruptible Power Supply Systems. Applied in 4 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - UPS and STS commissioning hold points [https://anvilfield.com/field-guides/datacenter/ups-sts-commissioning-hold-points/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## IEEE 1188 - IEEE https://anvilfield.com/standards/ieee-1188/ Recommended Practice for Maintenance, Testing, and Replacement of VRLA Batteries. Applied in 4 Anvilfield field guides, including: - Battery monitoring for VRLA and lithium [https://anvilfield.com/field-guides/datacenter/data-center-battery-monitoring-system-vrla-lithium/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - UPS and STS commissioning hold points [https://anvilfield.com/field-guides/datacenter/ups-sts-commissioning-hold-points/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## IEEE 142 - IEEE https://anvilfield.com/standards/ieee-142/ Recommended Practice for Grounding of Industrial and Commercial Power Systems (Green Book). Applied in 4 Anvilfield field guides, including: - Data center power commissioning [https://anvilfield.com/field-guides/datacenter/datacenter-electrical-commissioning-power-qa/] - Ground resistance testing [https://anvilfield.com/field-guides/datacenter/ground-resistance-bonding-testing/] - Grounding vs bonding explained [https://anvilfield.com/field-guides/electrical/grounding-vs-bonding-explained/] - SPD installation field guide [https://anvilfield.com/field-guides/datacenter/surge-protection-spd-installation/] ## IEEE 400 - IEEE https://anvilfield.com/standards/ieee-400/ Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems. Applied in 4 Anvilfield field guides, including: - Cable fault locating field guide [https://anvilfield.com/field-guides/electrical/electrical-cable-fault-locating-tdr/] - Insulation resistance testing field guide [https://anvilfield.com/field-guides/electrical/electrical-insulation-resistance-megger-testing/] - MV cable termination and testing [https://anvilfield.com/field-guides/datacenter/mv-cable-termination-testing/] - MV termination and splicing [https://anvilfield.com/field-guides/electrical/medium-voltage-cable-termination-splicing/] ## IEEE 802 - IEEE https://anvilfield.com/standards/ieee-802/ A published standard from IEEE, referenced across the Anvilfield field guides below. Applied in 4 Anvilfield field guides, including: - 400G and 800G fiber reuse [https://anvilfield.com/field-guides/datacenter/data-center-fiber-reuse-qualification-400g-800g/] - Data center interconnect (DCI) [https://anvilfield.com/field-guides/datacenter/data-center-interconnect-dci-transport/] - PoE voltage drop and heat [https://anvilfield.com/field-guides/electrical/poe-voltage-drop-and-heat-quick-check/] - Spine-leaf network architecture [https://anvilfield.com/field-guides/datacenter/data-center-network-architecture-spine-leaf/] ## ISO 8528 - Standards body https://anvilfield.com/standards/iso-8528/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 4 Anvilfield field guides, including: - Colocation usable power evidence [https://anvilfield.com/field-guides/datacenter/colocation-power-capacity-evidence-register/] - Data center generator sizing [https://anvilfield.com/field-guides/datacenter/data-center-generator-sizing-selection/] - GPU power transient tests [https://anvilfield.com/field-guides/datacenter/gpu-power-transient-test-plan/] - Generator load bank testing [https://anvilfield.com/field-guides/electrical/electrical-generator-load-bank-testing/] ## ISO/IEC 11801 - Standards body https://anvilfield.com/standards/iso-iec-11801/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 4 Anvilfield field guides, including: - Cat6A certification field guide [https://anvilfield.com/field-guides/datacenter/copper-cat6a-certification/] - Data center fiber types [https://anvilfield.com/field-guides/datacenter/data-center-fiber-cabling-types-singlemode-multimode/] - Data center structured cabling [https://anvilfield.com/field-guides/datacenter/datacenter-structured-cabling-overview/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] ## ISO/IEC 14763 - Standards body https://anvilfield.com/standards/iso-iec-14763/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 4 Anvilfield field guides, including: - 400G and 800G fiber reuse [https://anvilfield.com/field-guides/datacenter/data-center-fiber-reuse-qualification-400g-800g/] - Fiber OTDR certification [https://anvilfield.com/field-guides/datacenter/fiber-otdr-bidirectional-certification/] - Fiber splice loss budget [https://anvilfield.com/field-guides/datacenter/fiber-splice-loss-budget/] - TIA-606 labeling and administration [https://anvilfield.com/field-guides/datacenter/tia-606-labeling-administration/] ## NFPA 2001 - National Fire Protection Association https://anvilfield.com/standards/nfpa-2001/ Standard on Clean Agent Fire Extinguishing Systems. Applied in 4 Anvilfield field guides, including: - Aspirating smoke detection [https://anvilfield.com/field-guides/datacenter/aspirating-smoke-detection-vesda/] - Clean agent room integrity [https://anvilfield.com/field-guides/datacenter/clean-agent-suppression-room-integrity/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Data center fire suppression compared [https://anvilfield.com/field-guides/datacenter/data-center-fire-suppression-systems-comparison/] ## NFPA 30 - National Fire Protection Association https://anvilfield.com/standards/nfpa-30/ Flammable and Combustible Liquids Code. Applied in 4 Anvilfield field guides, including: - Fuel storage tank field guide [https://anvilfield.com/field-guides/plumbing/fuel-storage-tank-ust-ast-systems/] - Generator fuel system and day tank [https://anvilfield.com/field-guides/datacenter/generator-fuel-system-day-tank/] - Immersion cooling acceptance [https://anvilfield.com/field-guides/datacenter/immersion-cooling-tank-acceptance/] - Two-phase cooling [https://anvilfield.com/field-guides/datacenter/data-center-two-phase-cooling/] ## UL 1479 - Underwriters Laboratories https://anvilfield.com/standards/ul-1479/ Standard for Fire Tests of Penetration Firestops. Applied in 4 Anvilfield field guides, including: - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Drywall and gypsum board finishing [https://anvilfield.com/field-guides/concrete/drywall-gypsum-board-finishing/] - Pipe penetration firestop guide [https://anvilfield.com/field-guides/plumbing/pipe-penetration-firestop-sleeves/] - Structural fireproofing [https://anvilfield.com/field-guides/concrete/structural-fireproofing-sfrm-intumescent/] ## UL 325 - Underwriters Laboratories https://anvilfield.com/standards/ul-325/ Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems. Applied in 4 Anvilfield field guides, including: - Automatic gate operator field guide [https://anvilfield.com/field-guides/electrical/automatic-gate-operator-installation/] - Commercial fence and gate install [https://anvilfield.com/field-guides/landscaping/commercial-fence-gate-installation/] - Industrial fence and perimeter demand [https://anvilfield.com/field-guides/market-intelligence/fencing-manufacturers-industrial-yard-and-perimeter-demand/] - Overhead door and dock leveler field guide [https://anvilfield.com/field-guides/electrical/overhead-door-dock-leveler-installation/] ## UL 489 - Underwriters Laboratories https://anvilfield.com/standards/ul-489/ Standard for Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures. Applied in 4 Anvilfield field guides, including: - Available fault current study [https://anvilfield.com/field-guides/electrical/short-circuit-available-fault-current-study/] - Distribution equipment guide [https://anvilfield.com/field-guides/electrical/distribution-equipment-switchgear-switchboard-panelboard/] - Overcurrent protection guide [https://anvilfield.com/field-guides/electrical/overcurrent-protection-breakers-fuses/] - UL 508A control panel and SCCR [https://anvilfield.com/field-guides/electrical/control-panel-ul508a-sccr-build/] ## ACI 224 - American Concrete Institute https://anvilfield.com/standards/aci-224/ Guide to control of cracking in concrete structures. Sections cited: ACI 224.1R, ACI 224.1R-07, ACI 224R Applied in 3 Anvilfield field guides, including: - Concrete crack injection [https://anvilfield.com/field-guides/concrete/epoxy-crack-injection-structural-repair/] - Concrete crack movement monitoring [https://anvilfield.com/field-guides/concrete/concrete-crack-monitoring-movement/] - Concrete crack types and causes [https://anvilfield.com/field-guides/concrete/concrete-crack-types-causes-prevention/] ## ACI 347 - American Concrete Institute https://anvilfield.com/standards/aci-347/ Guide to Formwork for Concrete. Sections cited: ACI 347.2R, ACI 347R Applied in 3 Anvilfield field guides, including: - Formwork types and systems [https://anvilfield.com/field-guides/concrete/concrete-formwork-types-systems/] - Formwork, shoring, and reshoring [https://anvilfield.com/field-guides/concrete/concrete-formwork-shoring-reshoring/] - Self-consolidating concrete [https://anvilfield.com/field-guides/concrete/self-consolidating-concrete-scc/] ## ACI 522 - American Concrete Institute https://anvilfield.com/standards/aci-522/ Report on Pervious Concrete. Sections cited: ACI 522.1, ACI 522R Applied in 3 Anvilfield field guides, including: - Permeable pavement install [https://anvilfield.com/field-guides/paving/permeable-porous-pavement-install/] - Pervious concrete field guide [https://anvilfield.com/field-guides/concrete/pervious-concrete-installation/] - Porous and permeable pavement [https://anvilfield.com/field-guides/paving/porous-permeable-pavement/] ## ACI 546 - American Concrete Institute https://anvilfield.com/standards/aci-546/ Guide to concrete repair. Sections cited: ACI 546R-14 Applied in 3 Anvilfield field guides, including: - Concrete crack movement monitoring [https://anvilfield.com/field-guides/concrete/concrete-crack-monitoring-movement/] - Concrete spall repair [https://anvilfield.com/field-guides/concrete/concrete-repair-spall-restoration/] - Parking structure restoration [https://anvilfield.com/field-guides/concrete/parking-structure-restoration-repair/] ## ANSI Z133 - ANSI https://anvilfield.com/standards/ansi-z133/ American National Standard safety requirements for arboriculture (tree care operations). Applied in 3 Anvilfield field guides, including: - Tree cabling and bracing [https://anvilfield.com/field-guides/landscaping/tree-cabling-bracing-structural-support/] - Tree pruning and maintenance [https://anvilfield.com/field-guides/landscaping/tree-pruning-maintenance-ansi-a300/] - Tree removal and stump grinding [https://anvilfield.com/field-guides/landscaping/tree-removal-stump-grinding/] ## ASCE 7-22 - American Society of Civil Engineers https://anvilfield.com/standards/asce-7-22/ A published standard from American Society of Civil Engineers, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Pergola and shade structure guide [https://anvilfield.com/field-guides/landscaping/pergola-gazebo-shade-structure-construction/] - Prefab module seismic certification [https://anvilfield.com/field-guides/datacenter/seismic-certification-prefab-data-center-modules/] - Snow guards and retention [https://anvilfield.com/field-guides/roofing/snow-guard-retention-systems/] ## ASHRAE 111 - ASHRAE https://anvilfield.com/standards/ashrae-111/ Measurement, Testing, Adjusting, and Balancing of Building HVAC Systems. Applied in 3 Anvilfield field guides, including: - Air balancing report field guide [https://anvilfield.com/field-guides/hvac/air-balancing-report-procedure/] - Hydronic balancing field guide [https://anvilfield.com/field-guides/hvac/hydronic-system-balancing/] - VAV box commissioning field guide [https://anvilfield.com/field-guides/hvac/vav-box-commissioning-airflow/] ## ASHRAE Guideline 21 - ASHRAE https://anvilfield.com/standards/ashrae-guideline-21/ Ventilation and Thermal Management of Batteries for Stationary Applications (with IEEE 1635). Applied in 3 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## ASME B30 - ASME https://anvilfield.com/standards/asme-b30/ Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings. Sections cited: ASME B30.5, ASME B30.9, ASME B30.27 Applied in 3 Anvilfield field guides, including: - Concrete pumping and placement [https://anvilfield.com/field-guides/concrete/concrete-pumping-placement-boom-line/] - Crane and rigging safety [https://anvilfield.com/field-guides/electrical/crane-rigging-signals-safety/] - Steel erection and connections [https://anvilfield.com/field-guides/concrete/structural-steel-erection-connections/] ## ASTM A615 - ASTM International https://anvilfield.com/standards/astm-a615/ Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement. Applied in 3 Anvilfield field guides, including: - Masonry construction [https://anvilfield.com/field-guides/concrete/masonry-brick-block-cmu-construction/] - Rebar detailing and the BBS [https://anvilfield.com/field-guides/concrete/rebar-detailing-bar-bending-schedule/] - Rebar pre-pour inspection [https://anvilfield.com/field-guides/concrete/rebar-placement-cover-inspection/] ## ASTM B88 - ASTM International https://anvilfield.com/standards/astm-b88/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - PEX, copper, and CPVC methods [https://anvilfield.com/field-guides/plumbing/pex-copper-cpvc-piping-methods/] - PPR vs GI vs copper pipe [https://anvilfield.com/field-guides/plumbing/ppr-vs-gi-vs-copper-pipe/] - Pipe joining methods [https://anvilfield.com/field-guides/plumbing/pipe-joining-methods-solder-press-solvent/] ## ASTM C1315 - ASTM International https://anvilfield.com/standards/astm-c1315/ Specification for Liquid Membrane-Forming Curing and Sealing Compounds for Concrete. Applied in 3 Anvilfield field guides, including: - Concrete curing methods and protection [https://anvilfield.com/field-guides/concrete/concrete-curing-methods-protection/] - Concrete sealers and coatings [https://anvilfield.com/field-guides/concrete/concrete-sealers-coatings-protection/] - Stamped concrete install guide [https://anvilfield.com/field-guides/concrete/stamped-decorative-concrete-install/] ## ASTM C1611 - ASTM International https://anvilfield.com/standards/astm-c1611/ Test Method for Slump Flow of Self-Consolidating Concrete. Applied in 3 Anvilfield field guides, including: - Concrete slump test [https://anvilfield.com/field-guides/concrete/concrete-slump-test/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Self-consolidating concrete [https://anvilfield.com/field-guides/concrete/self-consolidating-concrete-scc/] ## ASTM C1701 - ASTM International https://anvilfield.com/standards/astm-c1701/ Test Method for Infiltration Rate of In Place Pervious Concrete. Applied in 3 Anvilfield field guides, including: - Permeable pavement install [https://anvilfield.com/field-guides/paving/permeable-porous-pavement-install/] - Pervious concrete field guide [https://anvilfield.com/field-guides/concrete/pervious-concrete-installation/] - Porous and permeable pavement [https://anvilfield.com/field-guides/paving/porous-permeable-pavement/] ## ASTM C1782 - ASTM International https://anvilfield.com/standards/astm-c1782/ Specification for Segmental Concrete Paving Slabs. Applied in 3 Anvilfield field guides, including: - Hardscape drainage [https://anvilfield.com/field-guides/landscaping/hardscape-drainage-patio-retaining/] - Paver hardscape installation [https://anvilfield.com/field-guides/landscaping/paver-hardscape-patio-walkway-installation/] - Paver layout and field border [https://anvilfield.com/field-guides/landscaping/paver-layout-field-border/] ## ASTM C270 - ASTM International https://anvilfield.com/standards/astm-c270/ Specification for Mortar for Unit Masonry. Applied in 3 Anvilfield field guides, including: - CMU block wall construction [https://anvilfield.com/field-guides/concrete/concrete-masonry-cmu-block-wall-construction/] - Masonry construction [https://anvilfield.com/field-guides/concrete/masonry-brick-block-cmu-construction/] - Masonry repointing and restoration [https://anvilfield.com/field-guides/concrete/masonry-repointing-tuckpointing-restoration/] ## ASTM C33 - ASTM International https://anvilfield.com/standards/astm-c33/ Specification for Concrete Aggregates. Applied in 3 Anvilfield field guides, including: - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] - Paver hardscape installation [https://anvilfield.com/field-guides/landscaping/paver-hardscape-patio-walkway-installation/] - Paver layout and field border [https://anvilfield.com/field-guides/landscaping/paver-layout-field-border/] ## ASTM C476 - ASTM International https://anvilfield.com/standards/astm-c476/ Specification for Grout for Masonry. Applied in 3 Anvilfield field guides, including: - CMU block wall construction [https://anvilfield.com/field-guides/concrete/concrete-masonry-cmu-block-wall-construction/] - Grout types and baseplate grouting [https://anvilfield.com/field-guides/concrete/concrete-grout-types-baseplate-grouting/] - Masonry construction [https://anvilfield.com/field-guides/concrete/masonry-brick-block-cmu-construction/] ## ASTM C494 - ASTM International https://anvilfield.com/standards/astm-c494/ Specification for Chemical Admixtures for Concrete. Applied in 3 Anvilfield field guides, including: - Concrete admixtures [https://anvilfield.com/field-guides/concrete/concrete-admixtures-types-guide/] - Hot weather concreting [https://anvilfield.com/field-guides/concrete/hot-weather-concreting-protection/] - Mix design and water-cement ratio [https://anvilfield.com/field-guides/concrete/concrete-mix-design-water-cement-ratio/] ## ASTM C936 - ASTM International https://anvilfield.com/standards/astm-c936/ Specification for Solid Concrete Interlocking Paving Units. Applied in 3 Anvilfield field guides, including: - Hardscape drainage [https://anvilfield.com/field-guides/landscaping/hardscape-drainage-patio-retaining/] - Paver hardscape installation [https://anvilfield.com/field-guides/landscaping/paver-hardscape-patio-walkway-installation/] - Paver layout and field border [https://anvilfield.com/field-guides/landscaping/paver-layout-field-border/] ## ASTM D1557 - ASTM International https://anvilfield.com/standards/astm-d1557/ Test Methods for Laboratory Compaction of Soil Using Modified Effort (Modified Proctor). Applied in 3 Anvilfield field guides, including: - Pavement base and subgrade compaction [https://anvilfield.com/field-guides/paving/pavement-base-subgrade-compaction/] - Paver hardscape installation [https://anvilfield.com/field-guides/landscaping/paver-hardscape-patio-walkway-installation/] - Site grading and earthwork [https://anvilfield.com/field-guides/landscaping/landscape-site-grading-earthwork/] ## ASTM D4541 - ASTM International https://anvilfield.com/standards/astm-d4541/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM D4541-22 Applied in 3 Anvilfield field guides, including: - Epoxy resinous floor coating install [https://anvilfield.com/field-guides/concrete/epoxy-resinous-floor-coating-install/] - Exterior paint peeling: find the failed layer [https://anvilfield.com/field-guides/concrete/exterior-paint-peeling-failure-diagnosis/] - Roof coating adhesion tests [https://anvilfield.com/field-guides/roofing/roof-coating-adhesion-test-comparison/] ## ASTM D4637 - ASTM International https://anvilfield.com/standards/astm-d4637/ Specification for EPDM Sheet Used in Single-Ply Roof Membranes. Sections cited: ASTM D4637/D4637M-15 Applied in 3 Anvilfield field guides, including: - EPDM rubber roof installation [https://anvilfield.com/field-guides/roofing/epdm-rubber-roof-installation/] - Single-ply seam QA [https://anvilfield.com/field-guides/roofing/single-ply-membrane-seam-qa/] - TPO vs EPDM vs PVC [https://anvilfield.com/field-guides/roofing/low-slope-membrane-selection-tpo-epdm-pvc/] ## ASTM D6878 - ASTM International https://anvilfield.com/standards/astm-d6878/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM D6878-19, ASTM D6878/D6878M-26 Applied in 3 Anvilfield field guides, including: - Commercial roof service-life evidence [https://anvilfield.com/field-guides/roofing/commercial-roof-service-life-evidence-table/] - Single-ply seam QA [https://anvilfield.com/field-guides/roofing/single-ply-membrane-seam-qa/] - TPO vs EPDM vs PVC [https://anvilfield.com/field-guides/roofing/low-slope-membrane-selection-tpo-epdm-pvc/] ## ASTM D698 - ASTM International https://anvilfield.com/standards/astm-d698/ Test Methods for Laboratory Compaction of Soil Using Standard Effort (Standard Proctor). Applied in 3 Anvilfield field guides, including: - Pavement base and subgrade compaction [https://anvilfield.com/field-guides/paving/pavement-base-subgrade-compaction/] - Paver hardscape installation [https://anvilfield.com/field-guides/landscaping/paver-hardscape-patio-walkway-installation/] - Site grading and earthwork [https://anvilfield.com/field-guides/landscaping/landscape-site-grading-earthwork/] ## ASTM D8231 - ASTM International https://anvilfield.com/standards/astm-d8231/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Ballasted roof systems [https://anvilfield.com/field-guides/roofing/ballasted-roof-system-installation/] - Electronic leak detection [https://anvilfield.com/field-guides/roofing/electronic-leak-detection-survey/] - USACE ROOFER condition worksheet [https://anvilfield.com/field-guides/roofing/roofer-roof-condition-rating-worksheet/] ## ASTM E108 - ASTM International https://anvilfield.com/standards/astm-e108/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM E108-25 Applied in 3 Anvilfield field guides, including: - FM RoofNav substitution review [https://anvilfield.com/field-guides/roofing/fm-roofnav-assembly-substitution-review/] - SPF roof field guide [https://anvilfield.com/field-guides/roofing/spray-polyurethane-foam-spf-roof/] - Wood shake and shingle roofing [https://anvilfield.com/field-guides/roofing/wood-shake-shingle-roof-installation/] ## ASTM E1592 - ASTM International https://anvilfield.com/standards/astm-e1592/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM E1592-25 Applied in 3 Anvilfield field guides, including: - Metal roof thermal movement diagnosis [https://anvilfield.com/field-guides/roofing/metal-roof-thermal-movement-diagnosis/] - Metal roof types compared [https://anvilfield.com/field-guides/roofing/metal-roof-types-comparison/] - Standing seam metal roof [https://anvilfield.com/field-guides/roofing/standing-seam-metal-roof-installation/] ## ASTM E2174 - ASTM International https://anvilfield.com/standards/astm-e2174/ Practice for On-Site Inspection of Installed Firestops. Applied in 3 Anvilfield field guides, including: - Cabling pathways and firestop [https://anvilfield.com/field-guides/datacenter/cabling-pathways-firestop/] - Data center fire and life safety [https://anvilfield.com/field-guides/datacenter/datacenter-fire-life-safety-overview/] - Pipe penetration firestop guide [https://anvilfield.com/field-guides/plumbing/pipe-penetration-firestop-sleeves/] ## ASTM E84 - ASTM International https://anvilfield.com/standards/astm-e84/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Calcium silicate board [https://anvilfield.com/field-guides/concrete/calcium-silicate-board/] - Pipe insulation field guide [https://anvilfield.com/field-guides/plumbing/pipe-insulation-condensation-control/] - SPF roof field guide [https://anvilfield.com/field-guides/roofing/spray-polyurethane-foam-spf-roof/] ## ASTM E96 - ASTM International https://anvilfield.com/standards/astm-e96/ A published standard from ASTM International, referenced across the Anvilfield field guides below. Sections cited: ASTM E96/E96M Applied in 3 Anvilfield field guides, including: - ASTM roof coating ratings [https://anvilfield.com/field-guides/roofing/astm-roof-coating-properties-field-meaning/] - Building insulation and air sealing [https://anvilfield.com/field-guides/roofing/building-insulation-air-sealing-envelope/] - Roof vapor retarder and air barrier [https://anvilfield.com/field-guides/roofing/roof-vapor-retarder-air-barrier/] ## AWWA C652 - American Water Works Association https://anvilfield.com/standards/awwa-c652/ A published standard from American Water Works Association, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Potable water disinfection guide [https://anvilfield.com/field-guides/plumbing/potable-water-disinfection-flushing-chlorination/] - Tank coating and lining [https://anvilfield.com/field-guides/concrete/storage-tank-coating-lining-interior/] - Water tower inspection and coating [https://anvilfield.com/field-guides/concrete/water-tower-inspection-and-coating/] ## IEEE 1106 - IEEE https://anvilfield.com/standards/ieee-1106/ Recommended Practice for Maintenance, Testing, and Replacement of Nickel-Cadmium Batteries. Applied in 3 Anvilfield field guides, including: - Battery monitoring for VRLA and lithium [https://anvilfield.com/field-guides/datacenter/data-center-battery-monitoring-system-vrla-lithium/] - UPS and STS commissioning hold points [https://anvilfield.com/field-guides/datacenter/ups-sts-commissioning-hold-points/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## IEEE 1635 - IEEE https://anvilfield.com/standards/ieee-1635/ Guide for the Ventilation and Thermal Management of Stationary Battery Installations. Applied in 3 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## IEEE 242 - IEEE https://anvilfield.com/standards/ieee-242/ Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (Buff Book). Applied in 3 Anvilfield field guides, including: - Available fault current study [https://anvilfield.com/field-guides/electrical/short-circuit-available-fault-current-study/] - Coordination study field guide [https://anvilfield.com/field-guides/datacenter/protective-relay-coordination-study/] - Selective coordination field guide [https://anvilfield.com/field-guides/electrical/selective-coordination-overcurrent/] ## IEEE 400.2 - IEEE https://anvilfield.com/standards/ieee-400-2/ Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF). Applied in 3 Anvilfield field guides, including: - Cable fault locating field guide [https://anvilfield.com/field-guides/electrical/electrical-cable-fault-locating-tdr/] - MV cable termination and testing [https://anvilfield.com/field-guides/datacenter/mv-cable-termination-testing/] - MV termination and splicing [https://anvilfield.com/field-guides/electrical/medium-voltage-cable-termination-splicing/] ## IEEE 450 - IEEE https://anvilfield.com/standards/ieee-450/ Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries. Applied in 3 Anvilfield field guides, including: - Battery monitoring for VRLA and lithium [https://anvilfield.com/field-guides/datacenter/data-center-battery-monitoring-system-vrla-lithium/] - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - UPS battery maintenance and testing [https://anvilfield.com/field-guides/datacenter/ups-battery-maintenance-testing/] ## IEEE 519 - IEEE https://anvilfield.com/standards/ieee-519/ Recommended Practice and Requirements for Harmonic Control in Electric Power Systems. Applied in 3 Anvilfield field guides, including: - Harmonics and power quality [https://anvilfield.com/field-guides/electrical/harmonics-power-quality-mitigation/] - Power factor correction [https://anvilfield.com/field-guides/electrical/power-factor-correction-capacitor-bank/] - VFD install and commissioning [https://anvilfield.com/field-guides/electrical/vfd-variable-frequency-drive-install/] ## ISO 19650 - Standards body https://anvilfield.com/standards/iso-19650/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - BIM VDC coordination [https://anvilfield.com/field-guides/datacenter/bim-vdc-coordination-clash-detection/] - Digital twin for operations [https://anvilfield.com/field-guides/datacenter/digital-twin-facility-operations/] - Document control field guide [https://anvilfield.com/field-guides/electrical/construction-document-control-drawings/] ## NFPA 1 - National Fire Protection Association https://anvilfield.com/standards/nfpa-1/ Fire Code. Applied in 3 Anvilfield field guides, including: - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Fire watch and impairment [https://anvilfield.com/field-guides/datacenter/fire-watch-patrol-impairment/] - Outdoor fire feature guide [https://anvilfield.com/field-guides/landscaping/outdoor-fire-feature-pit-fireplace/] ## NFPA 10 - National Fire Protection Association https://anvilfield.com/standards/nfpa-10/ Standard for Portable Fire Extinguishers. Applied in 3 Anvilfield field guides, including: - Fire extinguisher classes and PASS guide [https://anvilfield.com/field-guides/hvac/fire-extinguisher-use-classes-pass/] - Hood suppression semi-annual guide [https://anvilfield.com/field-guides/hvac/kitchen-hood-suppression-semiannual/] - Kitchen grease duct field guide [https://anvilfield.com/field-guides/hvac/kitchen-exhaust-grease-duct-nfpa96/] ## NFPA 20 - National Fire Protection Association https://anvilfield.com/standards/nfpa-20/ Standard for the Installation of Stationary Pumps for Fire Protection. Applied in 3 Anvilfield field guides, including: - Fire pump acceptance test [https://anvilfield.com/field-guides/datacenter/fire-pump-acceptance-test/] - Fire pump and standpipe guide [https://anvilfield.com/field-guides/plumbing/fire-pump-standpipe-system-design/] - Fire sprinkler system design guide [https://anvilfield.com/field-guides/plumbing/fire-sprinkler-system-design-nfpa13/] ## NFPA 58 - National Fire Protection Association https://anvilfield.com/standards/nfpa-58/ Liquefied Petroleum Gas Code. Applied in 3 Anvilfield field guides, including: - Outdoor fire feature guide [https://anvilfield.com/field-guides/landscaping/outdoor-fire-feature-pit-fireplace/] - Outdoor kitchen construction guide [https://anvilfield.com/field-guides/landscaping/outdoor-kitchen-construction-installation/] - Propane LP-gas system install guide [https://anvilfield.com/field-guides/plumbing/propane-lp-gas-system-install/] ## NFPA 68 - National Fire Protection Association https://anvilfield.com/standards/nfpa-68/ Standard on Explosion Protection by Deflagration Venting. Applied in 3 Anvilfield field guides, including: - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] ## NFPA 69 - National Fire Protection Association https://anvilfield.com/standards/nfpa-69/ Standard on Explosion Prevention Systems. Applied in 3 Anvilfield field guides, including: - Battery energy storage (BESS) [https://anvilfield.com/field-guides/electrical/battery-energy-storage-system-bess-nec-706/] - Battery room ventilation and hydrogen safety [https://anvilfield.com/field-guides/datacenter/battery-room-ventilation-hydrogen-safety/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] ## NFPA 79 - National Fire Protection Association https://anvilfield.com/standards/nfpa-79/ A published standard from National Fire Protection Association, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Cable tray field guide [https://anvilfield.com/field-guides/electrical/electrical-cable-tray-systems-installation/] - Surge protection (SPD) field guide [https://anvilfield.com/field-guides/electrical/electrical-surge-protection-spd-types-nec/] - UL 508A control panel and SCCR [https://anvilfield.com/field-guides/electrical/control-panel-ul508a-sccr-build/] ## NFPA 80 - National Fire Protection Association https://anvilfield.com/standards/nfpa-80/ Standard for Fire Doors and Other Opening Protectives. Applied in 3 Anvilfield field guides, including: - Data center physical security field guide [https://anvilfield.com/field-guides/datacenter/data-center-physical-security-access-control/] - Fire and smoke damper field guide [https://anvilfield.com/field-guides/hvac/fire-smoke-damper-installation-testing/] - Overhead door and dock leveler field guide [https://anvilfield.com/field-guides/electrical/overhead-door-dock-leveler-installation/] ## NFPA 90A - National Fire Protection Association https://anvilfield.com/standards/nfpa-90a/ Standard for the Installation of Air-Conditioning and Ventilating Systems. Applied in 3 Anvilfield field guides, including: - Duct insulation field guide [https://anvilfield.com/field-guides/hvac/hvac-duct-insulation-wrap-liner/] - Ductwork types field guide [https://anvilfield.com/field-guides/hvac/ductwork-types-sheet-metal-flex-ductboard/] - RTU install and startup field guide [https://anvilfield.com/field-guides/hvac/rooftop-unit-rtu-installation-startup/] ## TIA-942-C - Standards body https://anvilfield.com/standards/tia-942-c/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Data center types field guide [https://anvilfield.com/field-guides/datacenter/data-center-types-enterprise-colo-hyperscale-edge/] - Raised floor vs slab design [https://anvilfield.com/field-guides/datacenter/data-center-raised-floor-vs-slab-design/] - Spine-leaf network architecture [https://anvilfield.com/field-guides/datacenter/data-center-network-architecture-spine-leaf/] ## Tier I - Standards body https://anvilfield.com/standards/tier-i/ A published standard from Standards body, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Data center tier classification [https://anvilfield.com/field-guides/datacenter/data-center-tier-classification-uptime/] - Data center types field guide [https://anvilfield.com/field-guides/datacenter/data-center-types-enterprise-colo-hyperscale-edge/] - Liquid cooling concurrent maintainability [https://anvilfield.com/field-guides/datacenter/liquid-cooling-redundancy-concurrent-maintenance/] ## UL 1008 - Underwriters Laboratories https://anvilfield.com/standards/ul-1008/ Standard for Transfer Switch Equipment. Applied in 3 Anvilfield field guides, including: - ATS commissioning field guide [https://anvilfield.com/field-guides/electrical/automatic-transfer-switch-commissioning/] - Emergency and standby power systems [https://anvilfield.com/field-guides/electrical/emergency-standby-power-systems-nec-700/] - Standby generator install [https://anvilfield.com/field-guides/electrical/standby-generator-ats-installation/] ## UL 1449 - Underwriters Laboratories https://anvilfield.com/standards/ul-1449/ Standard for Surge Protective Devices. Applied in 3 Anvilfield field guides, including: - Data center grounding and SRG [https://anvilfield.com/field-guides/datacenter/data-center-grounding-signal-reference-grid/] - SPD installation field guide [https://anvilfield.com/field-guides/datacenter/surge-protection-spd-installation/] - Surge protection (SPD) field guide [https://anvilfield.com/field-guides/electrical/electrical-surge-protection-spd-types-nec/] ## UL 1741 - Underwriters Laboratories https://anvilfield.com/standards/ul-1741/ Standard for Inverters, Converters, and Controllers for Use in Distributed Energy Resources. Applied in 3 Anvilfield field guides, including: - Data center grid flexibility [https://anvilfield.com/field-guides/datacenter/data-center-grid-flexibility-demand-response/] - PV rapid shutdown (NEC 690.12) [https://anvilfield.com/field-guides/electrical/pv-rapid-shutdown-690-12/] - PV system wiring (NEC 690) [https://anvilfield.com/field-guides/electrical/photovoltaic-pv-system-wiring-nec-690/] ## UL 181A - Underwriters Laboratories https://anvilfield.com/standards/ul-181a/ Standard for Closure Systems for Use with Rigid Air Ducts. Applied in 3 Anvilfield field guides, including: - Duct leakage testing field guide [https://anvilfield.com/field-guides/hvac/duct-leakage-testing-sealing/] - Ductwork types field guide [https://anvilfield.com/field-guides/hvac/ductwork-types-sheet-metal-flex-ductboard/] - Sheet metal duct fabrication field guide [https://anvilfield.com/field-guides/hvac/sheet-metal-duct-fabrication-installation/] ## UL 1973 - Underwriters Laboratories https://anvilfield.com/standards/ul-1973/ Standard for Batteries for Use in Stationary and Auxiliary Power Applications. Applied in 3 Anvilfield field guides, including: - Data center battery and storage types [https://anvilfield.com/field-guides/datacenter/data-center-battery-energy-storage-types/] - Lithium-ion thermal runaway safety [https://anvilfield.com/field-guides/datacenter/lithium-ion-battery-thermal-runaway-safety/] - Rack BBU and ride-through [https://anvilfield.com/field-guides/datacenter/rack-bbu-energy-storage-ride-through/] ## UL 467 - Underwriters Laboratories https://anvilfield.com/standards/ul-467/ Standard for Grounding and Bonding Equipment. Applied in 3 Anvilfield field guides, including: - Ground ring electrode field guide [https://anvilfield.com/field-guides/electrical/ground-ring-electrode-nec-250-52/] - Grounding and bonding field guide [https://anvilfield.com/field-guides/electrical/grounding-electrode-system-bonding/] - Ufer ground field guide [https://anvilfield.com/field-guides/electrical/ufer-concrete-encased-grounding-electrode/] ## UL 857 - Underwriters Laboratories https://anvilfield.com/standards/ul-857/ A published standard from Underwriters Laboratories, referenced across the Anvilfield field guides below. Applied in 3 Anvilfield field guides, including: - Busway installation field guide [https://anvilfield.com/field-guides/electrical/busway-busduct-installation/] - Busway receiving and megger QA [https://anvilfield.com/field-guides/datacenter/busway-receiving-megger-qa/] - Data center power distribution chain [https://anvilfield.com/field-guides/datacenter/data-center-power-distribution-chain/]