Precip Matching
Check real applied inches per hour and flag mixed arcs or nozzles before they become callbacks.
Catch precipitation-rate mismatch, run catch-can DU audits, and turn ET plus soil and slope into controller-ready cycle-soak schedules.
Check real applied inches per hour and flag mixed arcs or nozzles before they become callbacks.
Enter cup readings one-handed and calculate DUlq, measured PR, and run-time multiplier on device.
Use ET, Kc, soil, root depth, MAD, slope, and DU to create station schedules ready for a controller.
MatchRate has no MatchRate account and no MatchRate backend. Calculations, saved projects, references, and exports work offline. Purchase and restore use Google Play Billing.
Estimate only. Verify against current code, AHJ requirements, and your engineered irrigation design before programming any controller.