OhmGround FOP
Plot fall-of-potential ground resistance readings on site, check the 62% value, and export the field report before you pull the stakes.
The app records meter readings, draws the curve, finds the plateau, checks bad geometry, captures GPS and photo evidence, and builds local reports.
- 3P and 4P FOP entry
- 62% read with 52/62/72 spread check
- PDF, CSV, ZIP, and JSON exports
- One-time Pro unlock, no subscription