Built for feeder-pull paperwork
Pull Plan Card helps electrical crews build the planned route, check predicted pull tension, sidewall pressure, jam ratio, conduit fill, and binding limits, then record the as-pulled result with photos and signatures.
- No account
- No ads
- No developer server
- Optional one-time Pro unlock
Plan, pull, prove
Exports
The app exports a PDF turnover card with the planned math, as-pulled record, formulas, warning stamp, photos, and signatures. Pro adds unwatermarked company-header PDF, selected-pull CSV, JSON, JPEG, ZIP export, duplicate-as-template, and full local library workflow.
Screenshots
Field aid note
This app computes from the values you enter and records what you measured. It does not replace the cable maker, engineer of record, or job spec. You are responsible for the pull.