Cable reel remaining length log
Track feet left on partial cable reels, log every pull, estimate remainders, and export a yard balance.
Know what is left
Each reel has one current balance, low flag, audit state, location, and pull history.
Log pulls fast
Pulls, add-backs, corrections, over-pulls, and undo events are recorded in the ledger.
Send the yard balance
Export CSV, JSON backup, PDF balance sheets, JPEG reel cards, and ZIP archives.
Built for cable yards and cages
- Free tracks up to 5 active reels with estimator, CSV, and JSON backup.
- Pro is a one-time $9.99 unlock for unlimited reels, photos, reorder view, PDF, JPEG, and ZIP.
- No account, ads, analytics, backend, or cloud sync.
- Core ledger, estimator, import, and export flows work offline after install.
Questions
How do I know how many feet are left on a partial cable reel?
Add the reel, enter known feet or use the estimator, then log each pull so the balance stays current.
Does Reel Remainder Log need barcodes or cloud sync?
No. It works on one Android device with manual entry, photos, local storage, and share-sheet exports.
Is the estimator a certified measurement?
No. It is an approximation from your dimensions. Check critical pulls with a footage counter or the reel tag.
Privacy
Reel Remainder Log does not use accounts, ads, analytics, a backend, or cloud sync. Read the app privacy policy at anvilfield.com/reelremainderlog/privacy.
Support: [email protected]