OSHA trench slope calculator and signed trench card

ShoreSafe DC helps the excavation competent person classify soil, solve trench slope width, check trench box ratings, and hold up a clear GO or STOP before the crew enters.

What it answers

Field card

Create a signed trench card with soil class, depth, slope, box check, reason list, timestamp, and PDF, CSV, or ZIP export through the Android share sheet.

Privacy

No Anvilfield backend, accounts, analytics, ads, telemetry, or cloud sync. Google Play handles Pro purchase and restore traffic.

Pricing

Free for three trench cards. Then 9.99 a month, 99 a year, or 199 once.

Support

Email support@anvilfield.com. Read the privacy policy.