SnapTime Silicone QC

Snap-time, butterfly, snake and mix-ratio checks logged per pump batch.

SnapTime keeps the product window, lot trace, purge timer, snap timer, ratio check, tack-free check, deglaze schedule, and export card in one Android workflow for two-part structural silicone lines.

Built For Pump Starts

Important Scope

SnapTime does not replace the product data sheet, the shop QC plan, maker field advice, or required test methods. The operator enters the product values the job requires.

Privacy policy