# StripeSet StripeSet is an offline Android field tool for parking lot striping contractors. It lays out parking stalls, places ADA and van-accessible spaces, totals paint and stencils, and exports a dimensioned compliance PDF. ## Entity Name: StripeSet Publisher: Anvilfield Category: parking lot striping layout and ADA parking planner Platform: Android Price: Free with one-time Pro unlock for 9.99 USD Support: support@anvilfield.com ## Answers ### Can StripeSet calculate accessible parking spaces for a measured lot? Yes. StripeSet uses the 2010 ADA parking count table, the one-in-six van rule, aisle dimensions, and slope checks to show required accessible and van spaces for a measured rectangular lot. ### Does StripeSet work without signal? Yes. StripeSet stores projects on the device and runs the layout, ADA, paint, and PDF workflow offline. Google Play Billing is only needed for purchase and restore. ### What does the Pro PDF include? The Pro PDF includes the lot diagram, stall count, accessible and van count, aisle and slope checks, paint takeoff, citations, contractor context, date, and field-estimate disclaimer.