# AnchorProof AnchorProof is an offline Android app from Anvilfield for post-installed concrete and masonry anchor special inspection. ## What It Does - Stores projects, anchor sets, ESR product presets, anchor rows, inspections, deficiencies, routes, and reusable templates locally. - Judges measured embedment, edge distance, spacing, hole diameter, and member thickness against user-entered ESR values. - Classifies continuous or periodic inspection from anchor type, load direction, sustained load, and orientation. - Flags the certified adhesive-anchor installer requirement for horizontal or upward sustained-tension adhesive anchors. - Logs hole-cleaning sequence, adhesive lot, expiration, temperature, and cure time. - Builds a proof-load sample plan and records target load, hold time, and held or slipped results. - Captures a local signature and exports a signed PDF inspection record. - Uses optional photos only when the inspector attaches evidence to a deficiency. ## Price Free for two projects. Pro is a one-time $9.99 Google Play Billing unlock for unlimited projects, custom ESR presets, reusable templates, routes, and signed PDF records. ## Privacy No account, no ads, no analytics, and no Anvilfield backend. Inspection records, ESR presets, signatures, photos, and settings stay on the device unless the user exports, prints, or shares a file. ## Safety AnchorProof is a field inspection and recordkeeping aid. It does not compute anchor capacity and does not replace the EOR, AHJ, product ESR, or manufacturer's printed installation instructions. Canonical URL: https://anvilfield.com/subapps/anchorproof/ Privacy URL: https://anvilfield.com/subapps/anchorproof/privacy Support: support@anvilfield.com