CertPrep DC Terms of Use
Effective date: June 2, 2026
CertPrep DC is published by Anvilfield. By installing or using the app you agree to these terms.
License
Anvilfield grants you a personal, non-transferable license to use CertPrep DC for your own exam preparation. You may not resell, redistribute, or reverse engineer the app or its question content.
Study material, not exam content
CertPrep DC is independent practice material. It is not affiliated with, authorized by, or endorsed by NICET, NETA, NCCER, or the National Fire Protection Association (NFPA). NICET, NETA, NCCER, and NFPA 70E are marks of their respective owners, used here only to identify the exams this app helps you practice for. The practice banks are original material and do not copy real exam questions or reprint standard tables.
No guarantee of results
Passing or failing a real certification exam is determined solely by the testing body. CertPrep DC does not guarantee a passing result. The questions and explanations are study aids and may contain errors; always verify against the governing standard and your official exam references.
Purchases
CertPrep DC is free to start with a daily practice set. The optional Pro unlock is a one-time purchase of $9.99 for lifetime access on your Google account, processed through Google Play billing. Refunds are handled under Google Play's refund policy. There is no subscription and no recurring charge.
Offline use and your data
The app is designed to run offline after install, and your study data stays on your device. You are responsible for your device, its backups, and any files you export and share. See the Privacy Policy for details.
Disclaimer of warranties and liability
CertPrep DC is provided "as is" without warranties of any kind. To the extent permitted by law, Anvilfield is not liable for any indirect or consequential damages arising from use of the app, including exam outcomes.
Changes
Anvilfield may update these terms. Continued use after an update means you accept the revised terms.
Contact
Email [email protected] with any questions about these terms.