CoatYield DC Terms

CoatYield DC is a field tool for planning resinous floor coats: coverage and kit math, pot-life and recoat clocks, dew-point go/no-go checks, and a yield ledger. It is a planning and yield aid only. It does not measure film thickness, certify adhesion, or declare a job acceptable.

Field use

Film thickness and acceptance are the calibrated DFT gauge and the coating inspector. Conditions are your thermometer and dew-point meter. Confirm volume solids, kit size, pot life, and recoat windows against the current product data sheet and the project specification before mixing or coating.

Offline records

The app stores jobs, rooms, products, coat entries, yield logs, preferences, and export drafts on the device. Exports are field records created by the user and shared only when the user chooses an Android share target.

Paid unlock

Pro unlocks unlimited rooms, PDF and CSV exports, saved presets, yield history, and extra clocks. Pricing is $4.99 per month, $39.99 per year, or a $99 one-time lifetime unlock, billed through Google Play. The first room and the on-screen calculations stay real and unblurred on the free tier. Subscriptions renew until canceled in Google Play; manage or cancel from your Play account.

Contact

Email [email protected].

Last updated: June 17, 2026.