Conduit Bid-in-a-Truck Privacy Policy
Effective date: June 3, 2026
Conduit Bid-in-a-Truck is published by Anvilfield. Contact [email protected] with privacy questions.
Data We Collect
The app does not collect personal data for Anvilfield. It has no account system, backend sync, telemetry, or advertising.
Local Data
The app stores bids, rate profiles, assembly choices, production entries, export counts, and entitlement status locally on your device. Android auto-backup is disabled in v1 because entitlement is restored through Google Play billing restore, not device backup.
You can delete individual bids in the app. You can also remove local app data by clearing app storage in Android settings or uninstalling the app. Shared PDFs, CSVs, and backups are controlled by the destination you chose.
User Exports
You can create bid PDFs, bid CSVs, production CSVs, and backups. These files are generated locally. If you share them through Gmail, Drive, print, or another Android share target, that target handles the file under its own terms.
Purchases
The lifetime unlock product com.anvilfield.conduitbidinatruckdc.lifetime uses Google Play billing checkout. Purchase providers process the purchase and restore flow. The app caches the entitlement locally so saved bids remain usable offline.
Children
The app is for adult contractors and business users. It is not directed to children.
Changes
If this policy changes, the updated version will be posted at https://anvilfield.com/subapps/conduitbidinatruck/privacy.