Prove why a commercial dryer runs long or hot. Measure airflow, static pressure, and exhaust temperature, walk the lint path, and print a condition report before the part swap.
Yes. The core app is offline and deterministic.
No. It is a field aid. Verify with calibrated tools, OEM instructions, NFPA 211, UL 2158, gas code, and local rules.
Yes. It can generate PDF condition reports plus CSV, JSON, and ZIP bundles for user-selected Android share targets.
Pro is a one-time $9.99 unlock through Google Play. No subscription, no renewal. Restore on any device signed in to the same Google account.
Google Play and the Google Play logo are trademarks of Google LLC.