DryTrip DC

Dry-pipe and pre-action air-hold, trip-test, retest, and signed report app for fire sprinkler fitters on datacenter jobs.

Dry-pipe valve gauge, stopwatch, and certificate graphic

What it does

Safety scope

DryTrip DC is a field aid. It does not replace a listed gauge, project specification, qualified fire sprinkler professional, or AHJ.

Privacy policy