FiberCert DC Terms

FiberCert DC is a field aid for fiber loss-budget checks, test records, labels, and closeout exports. It records the numbers you enter. It does not measure optics, grade endfaces, certify a link, stamp a design, or grant owner acceptance.

You are responsible for the project spec, test-set procedure, calibration status, labels, exports, and owner handoff. Verify all budgets, measurements, and labels against your project documents, manufacturer instructions, and the authority that accepts the work.

To the extent allowed by law, Anvilfield is not liable for rework, delay, lost profit, rejected packets, wrong inputs, missed field conditions, or use outside the app scope. If these terms do not fit your job, do not use the app for that job.

FiberCert DC works on local project data. User-started email, Drive, print, and share actions are handled by the Android apps and services you choose.

Contact: [email protected]