Offline fire alarm calculator

Pass the NFPA 72 battery and NAC check before the inspector arrives.

FireBatt 72 builds a secondary-power battery calc and point-by-point NAC voltage-drop worksheet on the truck, even in a mechanical room with no signal.

FireBatt 72 feature graphic showing offline battery and NAC results. FireBatt 72 output screen showing Battery 12 Ah OK, NAC-1 PASS at 19.8V, and NAC-2 FAIL at 15.9V.
Actual app output: Battery 12 Ah OK, NAC-1 PASS 19.8V, NAC-2 FAIL 15.9V.

Battery Sizing

Sum standby and alarm loads, choose 2022 or pre-2022 correction factor, apply temperature derate, and check 48-hour recharge current.

NAC Voltage Drop

Enter devices in physical order with segment length, AWG, alarm current, and Class B or Class A return-leg modeling.

AHJ Worksheet

Export a PDF worksheet and CSV load schedule with the inputs, math lines, checklist, signature line, and estimate disclaimer.

Built For Field Techs

Safety Scope

FireBatt 72 provides estimates only. It is not a stamped engineering document and is not a substitute for a licensed professional, the engineer of record, device listings, or the authority having jurisdiction.