FloorGrid DC Terms
Last updated June 15, 2026
Use
FloorGrid DC is a field check and documentation tool for raised access floor work. Use it with the project spec, manufacturer instructions, and owner QA process that govern your job.
Field Limits
You are responsible for entering the correct project limits, witness names, and field notes. The phone is not a stamped survey instrument. Lippage is entered by the user. Final acceptance belongs to the owner QA witness.
Purchases
The Pro unlock is a one-time Google Play purchase verified through Google Play billing. Google Play billing handles purchase processing and restore. A verified Pro entitlement is cached on the device so paid packet features can keep working without signal.
Local Data
Hall records, packet paths, calibration values, and cached settings stay on the device unless you export or share them. You choose the app or service that receives any exported file.
No Warranty
FloorGrid DC is provided as is. Anvilfield does not warrant that any field reading, packet, or exported file proves acceptance, code compliance, or fitness for a specific job.
Liability Limit
To the fullest extent allowed by law, Anvilfield is not liable for lost profit, rework cost, project delay, rejected work, or indirect damage from use of the app.
Contact
Questions about these terms can be sent to [email protected].