Concrete slump, air, temp, and unit weight records for every truck
FreshTest DC Slump Air gives ACI Grade-1 field techs a per-truck PASS or FAIL record at the chute, with C138 yield, proof photos, and PDF or CSV exports generated on device.
FAQ
What does FreshTest DC do?
FreshTest DC logs each concrete truck, checks slump, air, temperature, and unit weight against the project spec, and exports PDF or CSV records.
Does FreshTest DC work offline?
Yes. The ledger, calculations, photos, PDF, CSV, and ZIP generation run on device. Android share may use another app when you choose to share.
How much does FreshTest DC cost?
FreshTest DC has a free mode with one active pour. FreshTest Pro is $4.99 per month, $39.99 per year, or $99 lifetime.
What standards does FreshTest DC use?
FreshTest DC references ASTM C143, C1064, C231, C173, C138, C172, C94, and ACI Grade 1 field-testing scope without reprinting copyrighted tables.
Does FreshTest DC decide concrete acceptance?
No. It records and computes. The testing lab, cylinder breaks, engineer of record, and contract documents remain the acceptance gate.