FryerStat Manometer Log Privacy Policy
Effective June 4, 2026.
FryerStat Manometer Log is an offline gas-pressure field logbook for trained commercial food-equipment hot-side service technicians, by Anvilfield. It does not require an account, login, Anvilfield backend, analytics SDK, ads SDK, remote config, or sync service.
Data stored on your device
The app stores your tech profile and the information you enter so you can build a log and export a proof sheet: tech name, company, and license or cert text; customer, site, appliance, serial, fuel, BTU, readings, notes, deficiency lines, meter details, target overrides, and saved logs. If you add an evidence photo, such as a gauge, rating plate, gas valve, or hazard photo, it is stored on your device. Local Pro unlock status is also stored on your device.
Data shared by the app
FryerStat does not send your logs to Anvilfield, a backend, or a cloud account. When you tap Share, Save File, PDF, or CSV, Android sends the file to the app you choose, such as email, Drive, Gmail, or print. That share is user-initiated.
Network and purchases
Core app use does not require a network connection. Network access is used only by Google Play billing when you buy or restore the one-time Pro unlock. No logs, photos, or personal data are uploaded for billing. FryerStat stores only a local entitlement so Pro keeps working offline after purchase. Google Play processes the payment and restore requests under its own terms.
Permissions
Camera permission is used only when you choose to add an evidence photo. Internet and network state are used only for the Pro purchase and restore flow. The app does not request location, contacts, microphone, all-files access, exact alarms, advertising ID, analytics, or ads.
Delete local data
You can delete saved logs in the app, and you can remove all local app data through Android system settings by clearing FryerStat storage or uninstalling the app. Files already shared to other apps must be deleted in those apps.
Safety scope
FryerStat is a logbook and a math helper for trained gas service technicians. It is not a manometer or measuring instrument, it does not read or control gas, and it does not approve gas energization. The unit rating plate, OEM service manual, local codes, and AHJ govern. You are responsible for the repair.
Contact
Email [email protected] for privacy or support questions.