FryerStat Manometer Log Terms of Use

Effective June 4, 2026.

FryerStat Manometer Log is provided by Anvilfield as an offline gas-pressure field logbook and proof-sheet aid for Android, for trained commercial food-equipment hot-side service technicians.

Logbook and math helper only

FryerStat is not a manometer or measuring instrument. It does not read, control, approve, or energize gas. It is not the unit rating plate, OEM service manual, manufacturer instruction, code book, or regulatory approval. The unit rating plate, OEM service manual, local codes, AHJ, and your trained judgment govern.

User responsibility

You are responsible for reading pressure with a calibrated manometer, confirming the rating-plate target, measuring incoming and manifold pressure, finding and correcting any leak, following your own shut-off procedure, and deciding whether the appliance can run. Do not use FryerStat as a declaration that gas service is safe or that an appliance may be energized.

Gas hazard

If you smell gas, see a leak, or read wildly high incoming pressure, stop work, find the leak, and follow your own shut-off procedure and the OEM and AHJ guidance. The app does not control gas and does not say anything is safe.

Purchases

The free tier includes the full decision engine, 3 logs a month, manual target entry, basic export, and hazard notes. Pro is a one-time $9.99 unlock for the full target library, unlimited logs, polished PDF, CSV, deeper history, and meter details. Google Play billing processes purchases and restore requests.

No warranty

FryerStat is provided as is and as available. Anvilfield does not warrant that every target band or output is complete or correct for every appliance, model, fuel, jurisdiction, or rating plate.

Liability limit

To the maximum extent allowed by law, Anvilfield is not liable for indirect, incidental, special, consequential, exemplary, or punitive damages, or for lost profits, lost work, injury, property damage, or project delay arising from use of the app. Some jurisdictions do not allow all limits, so these limits apply only where allowed.

Contact

Email [email protected] for support or terms questions.