GroutPour Baseplate DC Terms
Effective June 4, 2026.
Field aid only
GroutPour DC is provided as a field aid for estimating grout volume, staging pour records, and estimating cure timing. You are responsible for confirming every value against the product data sheet, the project documents, the equipment maker, and the qualified witness before you order, pour, or set equipment.
Not engineering advice
The app does not provide engineering, structural, legal, safety, warranty, or inspection advice. It does not decide bearing capacity, anchor loads, final cure, or final acceptance.
No warranty
The app is provided as is, without a warranty that it is fit for a specific job or free of errors.
Limit of liability
To the fullest extent allowed by law, Anvilfield is not liable for lost profit, delay, rework, failed inspection, equipment damage, injury, or other loss that comes from using or relying on the app.
Purchases
Google Play handles Pro purchase, billing, restore, refund, and subscription management. Manage or cancel subscriptions in Google Play.
Local records
Your local records and exports stay on your device unless you choose to share them. Read the privacy policy for more detail.
Contact
Email [email protected] for terms questions.