HydroTest DC Terms
Effective date: June 16, 2026
These terms apply when you use HydroTest DC, an Android field app by Anvilfield.
Field Aid Only
Use HydroTest DC as a field aid for pressure-test planning, hold timing, thermal-drift interpretation, local pressure-test records, and exports. You are responsible for confirming design pressure, stress-ratio basis, component limits, gauge range, gauge calibration, hold duration, test package requirements, project requirements, and witness acceptance.
HydroTest DC does not measure pressure, measure temperature, approve a system for service, qualify a pressure test, design a pneumatic hazard plan, replace an engineer, replace the approved test package, replace a calibrated instrument, or provide legal, engineering, inspection, or certification authority. The approved test package, calibrated gauge or recorder, engineer, owner witness, AHJ, and project team remain the source of field decisions.
Pro Purchase
Two test sections are free. Pro access is sold through Google Play billing as a $9.99 one-time non-subscription purchase. Google Play handles payment details and refund requests under Google Play terms and policies. HydroTest DC uses only the local receipt-backed purchase state needed to unlock Pro features on the device.
Your Records
You control the records, photos, signatures, and exports you create in the app. Review every export before sharing it. Do not share a record as accepted unless the proper project witness or authority has accepted it.
No Warranty
To the maximum extent allowed by law, HydroTest DC is provided without warranties. Anvilfield does not promise that the app will meet every project need, prevent leaks, prevent false calls, satisfy any contract term, or replace professional judgment.
Liability Limit
To the maximum extent allowed by law, Anvilfield is not liable for decisions, delays, leaks, damage, injury, rejected records, backcharges, lost profits, or other losses from use or misuse of the app.
Privacy
Read the app-specific HydroTest DC privacy policy for data handling details.