Load Bank Interval Log

Generator load bank interval records, signed exports, and pass/fail checks.

Load Bank Interval Log overview

Log generator load bank intervals at the panel, check each line against the target, and export a signed test record for closeout.

Built For

Pro Options

FAQ

Does the app control the generator or load bank?

No. It records readings and computes checks from the values entered by the user.

Can it export the finished record?

Yes. It builds PDF, CSV, JSON, and ZIP exports on the device.

Does it need an account?

No account is required to create, run, save, or export tests.

Privacy policy