LoopWright Terms

Effective date: June 1, 2026

LoopWright is published by Anvilfield. Contact [email protected] for app support.

LoopWright provides design estimates for planning only. Verify every design against current code, the authority having jurisdiction, manufacturer data, and an engineered design before installation.

The app does not replace a licensed engineer, qualified hydronic designer, installer judgment, code review, inspection, commissioning, or manufacturer instructions.

The app is provided as is, without warranties of fitness for a particular job or installation. To the maximum extent allowed by law, the developer is not liable for installation defects, code violations, property damage, lost profits, or consequential damages from reliance on app outputs.

Pro is a one-time non-consumable Google Play in-app product. Purchase availability, taxes, refunds, and restore behavior are handled by Google Play.