Oil Pass Gate

Transformer oil and electrical acceptance records for field crews working offline at the pad before energization.

Offline Android app PASS / FAIL verdicts PDF, CSV, card, JSON exports
Oil Pass Gate app icon
Oil Pass Gate transformer test workflow

Built for transformer acceptance work

Electrical lines
IR, PI, DAR, turns ratio, and winding-resistance checks stay on one unit record.
Oil methods
D877 and D1816 entry, water ppm, power factor, IFT, acid, color, and DGA sample logs.
Signed exports
Witness guardrails, release cards, PDF, CSV, evidence photo, and JSON backup exports.

Screenshots

Oil Pass Gate project list Oil Pass Gate acceptance sheet Oil Pass Gate dielectric six-shot entry Oil Pass Gate export guardrail screen Oil Pass Gate tablet acceptance sheet

Important scope

Oil Pass Gate is a record aid and calculation aid. It is not a calibrated instrument, engineering approval, legal advice, safety approval, commissioning approval, or a substitute for the project specification, equipment listing, or authority having jurisdiction.