OTDR Bidirectional Loss Log Terms

Last updated June 17, 2026

Use

OTDR Bidirectional Loss Log is an offline field tool that records A-end and B-end OTDR splice readings, averages them per splice, catches gainers, reconciles each fiber to the link budget you enter, and exports a per-fiber turnover matrix. Use it with your OTDR, the project test plan, and the acceptance method and limits that govern your job.

Field Limits

You are responsible for entering the correct readings, splice types, budgets, and labels. The bidirectional average follows TIA-455-8 / FOTP-8 on the readings you enter; it is record-keeping and arithmetic, not a measurement. The app does not replace your OTDR, does not accept or reject a fiber run for the owner, and is not a stamped optical-network design. Verify each result against your instrument and the project acceptance plan before you rely on a pass or fail.

Purchases

The free tier keeps one active link so you can record a fiber and see the turnover matrix. Pro is a one-time $9.99 purchase, with no subscription, and unlocks unlimited saved links, built budgets, PDF and JSON export, templates, and re-splice evidence. The purchase is processed through Google Play Billing. Google Play and Google Play billing handles purchase processing and restore. A verified Pro entitlement is cached on the device so paid features keep working without signal.

Local Data

Link setup, fiber readings, budgets, tech name, notes, templates, settings, and purchase entitlement state stay on the device unless you export or share them. You choose the app or service that receives any exported PDF, CSV, or JSON file.

No Warranty

OTDR Bidirectional Loss Log is provided as is. Anvilfield does not warrant that any averaged value, status, or exported file proves a correct measurement, standard compliance, or acceptance of a fiber run.

Liability Limit

To the fullest extent allowed by law, Anvilfield is not liable for rework cost, rejected turnover, project delay, or indirect damage from use of the app.

Contact

Questions about these terms can be sent to [email protected].