PanelCourse DC Terms
Effective date: June 5, 2026
PanelCourse DC is published by Anvilfield.
Field aid only
PanelCourse DC helps metal wall panel and IMP crews lay out coursing in the field. It is not the approved shop drawing, erection drawing, attachment schedule, contract document, or engineering advice.
Use the approved shop drawings, erection drawings, manufacturer submittal, architect elevation, project spec, and local code as the record. Use those same records for structural span, clip pattern, fastener count, wind load, thermal, fire, vapor, and weather details.
Your responsibility
Check each dimension, opening, module, reveal, tolerance, and export before you act. Match it to the approved drawing and project spec.
Purchases
PanelCourse DC may offer Pro purchases through Google Play Billing. Google handles payment processing. Pro status is stored locally on the device so unlocked features can keep working offline.
Local data
Jobs, elevations, presets, cut lists, hung status, exports, and stamped photos stay on your device. You control any sharing through Android share, print, copy, camera, or other apps.
No warranty
The app is provided as is. It does not guarantee that an owner, architect, engineer, manufacturer, inspector, or general contractor will accept a layout.
Contact
Support: [email protected]