PolaritySolver DC Terms
PolaritySolver DC is a field planning aid for MPO/MTP fiber polarity. It draws the Tx-to-Rx chain you describe and checks Method A/B/C polarity, gender, endface mates, and array maps. It tells you what the chain should be; it does not measure optics, certify a link, stamp a design, or grant owner acceptance.
You are responsible for the project spec, the part labels, the test-set procedure, and the owner handoff. The OLTS PASS and closeout acceptance are the gate. Verify every chain and label against the actual hardware and your project documents before you land trunks.
To the extent allowed by law, Anvilfield is not liable for rework, delay, lost profit, rejected packets, wrong inputs, missed field conditions, or use outside the app scope. If these terms do not fit your job, do not use the app for that job.
MTP is a US Conec trademark. PolaritySolver DC is manufacturer-neutral and does not reprint vendor pinout diagrams.
Pro is a one-time $9.99 unlock through Google Play. User-started share and print actions are handled by the Android apps and services you choose.
Contact: [email protected]