PullRight DC Terms And Limits

Effective date: June 4, 2026

PullRight DC is a field planning calculator for cable pull setup. It is not a live tension meter, an engineering stamp, an inspection approval, or a safe-rigging plan.

What The App Does

PullRight DC estimates planned pulling tension, sidewall pressure, jam ratio, lube quantity, and a GO or NO-GO field verdict from the run data you enter. The app runs on device and can export PDF or CSV files through the Android share sheet.

What You Must Verify

Before pulling, confirm the cable rated pulling tension, minimum bend radius, reel tag data, tugger rating, rope rating, conduit path, and local code or project requirements. The dynamometer is the live tension record. The post-pull test and the qualified person on site decide whether the pull is acceptable.

No Professional Advice

The app gives a planning estimate. It does not replace a licensed engineer, qualified electrician, manufacturer instructions, job specifications, the authority having jurisdiction, or safe rigging practice.

Purchases

Pro purchases and restore run through Google Play Billing. Monthly and annual access can be cached on the device for the billing window. Lifetime access stays unlocked after a verified Play purchase or restore.

Local Data And Export

Jobs, saved runs, custom cable presets, settings, and local entitlement data are stored on the device. If you export a PDF or CSV, you choose the destination through Android. PullRight DC does not provide cloud sync or a backend.

Limitation Of Liability

To the fullest extent allowed by law, Anvilfield is not liable for job delay, damaged cable, rework, lost data, lost profit, injury, or other loss caused by using or being unable to use PullRight DC. Use the app only as a planning aid and verify the field condition before acting on a number.

Contact

For support, email [email protected].

Privacy Policy