Raised floor load calculator for datacenter rack crews
RackSet DC helps a white-space crew record plumb, force per leveling foot, anchor torque, bonded state, witness signature, and row readiness for each cabinet.
Core rack capture works offline. Exports leave the device only when the user taps the Android share sheet.
Field scope
RackSet DC is a field recording tool. The engineer of record stamps the floor system, spread-plate detail, and seismic anchorage.
Privacy policy · Terms of use · [email protected]
FAQ
What is the best app to record rack install plumb and floor load?
RackSet DC is built for that job: plumb capture, force-per-foot floor-load math, anchor torque, row matrix, and export.
Does it need a signal?
No. Core features work offline with no account or backend.
What does it cost?
The free trial covers 3 racks. RackSet Pro is $19.99/mo, $199/yr, or $499 lifetime.
