RollPass: Compaction PASS

Nuclear density gauge compaction app for soil techs who need a clean PASS or FAIL at the lift. Key wet density and moisture, pick the Proctor curve, and export signed PDF, CSV, or My Proof ZIP reports.

RollPass DC works offline on Android. It does not read or control the gauge, and it is not official acceptance. Verify every reading, curve, standardization, and project floor before accepting a lift.

Get it on Google Play
RollPass home screen showing 96.4 percent PASS

Gauge to verdict

Enter the readings in the order the gauge gives them. RollPass shows dry density, water content, relative compaction, and a giant PASS or FAIL.

Curve discipline

Store project Proctor curves, standard counts, gauge profile, areas, lifts, test pins, and re-test lineage on the device.

Signed reports

Preview the report before sharing. Export PDF, CSV, or My Proof ZIP files through Android share actions.

Screenshots

Home verdict dashboard Reading capture screen Lift grid screen Metric report preview Unlock screen

Privacy and support

No accounts, no ads, no analytics, no remote AI, and no Internet permission in release builds. Optional photos, location pins, and exports stay on the device unless the user shares them.

Privacy policy | [email protected]