Sag Field Card Privacy Policy

Effective June 17, 2026.

Sag Field Card is an offline conductor-sag field-aid app by Anvilfield. It does not require an account, login, Anvilfield backend, analytics SDK, ads SDK, remote config, or sync service.

Data stored on your device

The app stores your jobs, sections, spans, conductors, stringing chart rows, saved sag cards, notes, settings, generated proof files, and optional span photos on your device. If you enter a job name, section name, foreman name, note, or span photo, that information is also stored on your device.

Data shared by the app

Sag Field Card does not send your data to Anvilfield. When you tap share, Android may send the generated PDF, CSV, JSON, or ZIP to the app you choose, such as email, Drive, Gmail, or print. That share is user-initiated.

Purchases

If you buy Pro, Google Play billing processes the one-time $9.99 purchase. Sag Field Card stores a local entitlement so Pro features keep working offline. Google Play terms and privacy policy govern payment processing.

Permissions

Sag Field Card uses the internet only for Google Play billing to buy or restore Pro, and Android share intents for export. The sag, tension, return wave, verdict, and export engine runs fully offline. Span photos are selected or captured by user action and stay local unless you share an export. Camera or photo picker access is only used when you tap the photo controls. The app does not request location, contacts, microphone, notifications, all-files access, exact alarms, advertising ID, analytics, ads, or remote config.

Delete local data

You can remove local app data through Android system settings by clearing Sag Field Card storage or uninstalling the app. Generated files shared to other apps must be deleted in those apps.

Safety scope

Sag Field Card is a field aid, not a stamped engineering document and not engineering approval. The issued stringing chart, utility spec, NESC, AHJ, and responsible engineer govern.

Contact

Email [email protected] for privacy or support questions.