Sag Field Card Terms of Use

Effective June 17, 2026.

Sag Field Card is provided by Anvilfield as an offline conductor-sag field aid for Android.

Field aid only

Sag Field Card is not a stamped engineering document, engineering approval, or regulatory authorization. It does math on the chart and measurements you enter and keeps a record. The issued stringing chart, utility spec, NESC, AHJ, and responsible engineer govern. It does not approve clearances, create a stringing chart, control switching, approve LOTO, or say a line is safe to energize.

User responsibility

You are responsible for entering the correct issued chart, measuring span conditions, confirming conductor temperature, applying the right tolerance, and deciding whether the pull is acceptable. Do not use Sag Field Card as an absolute declaration that a span or line is safe.

Purchases

The free tier includes the full verdict engine, return wave timer, one job, and watermarked PDF and CSV. Pro is a one-time $9.99 unlock for unlimited jobs and sections, section roll-ups, JSON, ZIP, and no watermark. Google Play billing processes purchases and restore requests.

No warranty

Sag Field Card is provided as is and as available. Anvilfield does not warrant that every output is complete for every jobsite, jurisdiction, conductor, chart, local rule, or engineered plan.

Liability limit

To the maximum extent allowed by law, Anvilfield is not liable for indirect, incidental, special, consequential, exemplary, or punitive damages, or for lost profits, lost work, injury, property damage, or project delay arising from use of the app. Some jurisdictions do not allow all limits, so these limits apply only where allowed.

Contact

Email [email protected] for support or terms questions.