ScanMark DC Terms

Effective date: June 15, 2026

ScanMark DC turns your scanner readings into a drill decision as a field aid. It is not a scanner, radar, structural approval, or anchor-capacity approval; it does not measure what is inside concrete and is not a substitute for a qualified scanning operator or the structural engineer. The edge-distance check is geometric clearance only and does not approve anchor capacity. Treat post-tension decks as live until proven clear, treat a lone shallow reflector as possible energized conduit, and get engineer approval before cutting structural steel. Verify every reading and decision before you drill.

ScanMark DC is a field aid for trained crews using their own scanner.

It does not scan concrete, approve anchor capacity, certify a hole, replace a qualified scanner operator, replace an engineer, replace an inspector, or replace the authority having jurisdiction.

You are responsible for each reading, decision, drill action, export, and shared file. Use the app only where local law, contract terms, manufacturer instructions, and site rules allow it.

Anvilfield provides ScanMark DC as is, without warranties. To the fullest extent allowed by law, Anvilfield is not liable for job losses, damage, injury, or indirect costs caused by relying on the app.

Stop and get qualified review when a reading is unclear, a tendon or conduit may be present, or structural steel may be cut.

Contact: [email protected]