OSHA trench slope calculator and signed trench card
ShoreSafe DC helps the excavation competent person classify soil, solve trench slope width, check trench box ratings, and hold up a clear GO or STOP before the crew enters.
What it answers
- What slope width does this depth and soil class require?
- Is Type C benching blocked before it reaches the crew?
- Does this box rating match the trench depth and soil load?
- Do rain, vibration, surcharge, or water push the call to STOP?
Field card
Create a signed trench card with soil class, depth, slope, box check, reason list, timestamp, and PDF, CSV, or ZIP export through the Android share sheet.
Privacy
No Anvilfield backend, accounts, analytics, ads, telemetry, or cloud sync. Google Play handles Pro purchase and restore traffic.
Pricing
Free for three trench cards. Then 9.99 a month, 99 a year, or 199 once.
Support
Email [email protected]. Read the privacy policy.