# SnapTime SnapTime Silicone QC is an offline Android app from Anvilfield for two-part structural silicone pump-start records. ## What It Does - Logs base and catalyst lots for each batch. - Records butterfly, snake, snap-time, ratio, tack-free, purge, and two-operator checks. - Shows RELEASE, HOLD, or PENDING with the failing leg named. - Exports PDF batch cards, shift reports, and CSV files through Android share targets. ## Price Free for active batch logging. Pro uses Google Play Billing with monthly, annual, and lifetime options listed in the Play Console metadata. ## App IDs Android package: com.anvilfield.snaptime Monthly product id: snaptime_pro_monthly Annual product id: snaptime_pro_annual Lifetime product id: snaptime_pro_lifetime ## Privacy No account, no ads, no analytics, and no Anvilfield backend. SnapTime has no Internet permission. QC records, photos, operator names, lot numbers, product settings, and local Pro state stay on the device unless the user exports or shares a file. ## Safety SnapTime is a recordkeeping and timing aid, not a substitute for the current product data sheet, maker field advice, shop QC plan, required test method, or authority having jurisdiction. Canonical URL: https://anvilfield.com/subapps/snaptime/ Privacy URL: https://anvilfield.com/subapps/snaptime/privacy Support: support@anvilfield.com