Storm Material Slip

Build GPS-tagged material slips for storm line crews and send a clean yard request from the pole.

Built for storm line crews

Storm Material Slip helps a line crew foreman turn a damaged-pole parts call into a clear material needs slip. Pick a framing preset, adjust quantities with large steppers, capture the GPS accuracy, attach photos, and preview the one-page PDF before sharing it.

The app stores jobs, slips, photos, catalog edits, and exports on the device. It has no account and no Anvilfield backend. Sharing uses the Android share sheet, so the request can go by email, text, print, drive, or any channel the crew already uses.

GPS site tagAccuracy shown with a manual landmark fallback.
Photo proofDamage photos use captions and PDF thumbnails.
Material mathConductor length, reel count, pack count, and job roll-up math.
ExportsPDF, CSV, JSON, ZIP, and combined job roll-up files.
OutboxQueue slips for weak-signal storm work.
ProOne-time $8.99 unlock for repeat storm work.

FAQ

Does Storm Material Slip need a utility login?
No. It stores slips, photos, catalog edits, and exports on the device. Sharing uses the Android share sheet.
Can the yard see damage photos?
Yes. The PDF includes photo thumbnails and captions, and the ZIP export includes full-resolution photos.
Is this an engineering or pole design app?
No. It is a field aid for writing and sending material requests. The crew and utility remain responsible for the final part list and work method.

Publisher: Anvilfield. Support: [email protected]. Privacy: Privacy Policy. Terms: Terms of Use.