Offline Android app

StringerWise

A stair stringer calculator for carpenters and deck builders who need rise, run, cut marks, and code checks without ads or signal.

Riser
6-23/32"
Tread
10-1/2"
Status
REVIEW

Built for layout at the jobsite

Free and Pro

Free

Calculator, code check, diagram, reference cards, built-in presets, and the last five saved layouts.

Pro, one-time $6.99

Unlimited saves, custom presets, PDF cut sheets, text sharing, math breakdown, elevation preview, and flight planning.