# StuccoProof StuccoProof is an Anvilfield Android app for stucco and EIFS lath-and-coats inspection records. Primary page: https://anvilfield.com/subapps/stuccoproof/ Privacy policy: https://anvilfield.com/subapps/stuccoproof/privacy Support: support@anvilfield.com Package ID: com.anvilfield.stuccoproof IAP ID: com.anvilfield.stuccoproof.pro_unlock Price model: free for two projects, optional one-time Pro unlock for $9.99. Short answer: StuccoProof records WRB, weep screed, lath, joint, coat, photo, cure, and signature evidence for each stucco or EIFS elevation, then exports signed field reports. It works offline after install. Purchases and restore use Google Play Billing. It has no Anvilfield account, no Anvilfield backend, no analytics SDK, and no ads. Safety note: StuccoProof is a measurement, judgment, and recordkeeping aid based on bundled IRC R703.7, ASTM C1063, and ASTM C926 thresholds. It does not replace the published standards, manufacturer instructions, the authority having jurisdiction, or a qualified inspector. Frequently asked questions: Q: What does StuccoProof check? A: WRB layers, weep screed clearance, lath fastening, laps, control joints, coat thickness, cure timing, checkpoint photos, signatures, and report exports. Q: Does StuccoProof send project data to Anvilfield? A: No. Project records, photos, signatures, settings, presets, and generated PDFs stay on the device unless the user exports or shares a file. Q: Is Pro a subscription? A: No. Pro is a one-time $9.99 unlock handled by Google Play Billing.