Sweep Radius Check

Log conduit bends and sweep radius before backfill.

360 degree tallyWarns before a run reaches the pull limit.
Radius checkCompares each sweep to the cable minimum.
Photo proofExports a field record for QA and the cable crew.
Phone showing a bend tally and sweep-radius warning in a duct-bank trench.

Built for the trench

Count every fitting

Pick 90, 45, 30, 22.5, 11.25, or a custom angle. Offsets count double by design.

Catch tight sweeps

Enter the cable OD or profile. The app flags a sweep that is tighter than the cable minimum.

Works without signal

Runs, photos, math, and exports are made on the device. No account or cloud service is required.

Keep the record

Export CSV for spreadsheets, PDF for QA, ZIP for handoff, and JSON for backup.

Not a pull approval

Sweep Radius Check is a field tally and record tool. The pulling engineer still owns pull tension, sidewall pressure, and the final go/no-go. The app helps crews catch bad counts and tight sweeps while the trench is still open.

Confirm the local code edition, AHJ direction, project spec, and cable maker data before acting.

FAQ

What problem does it solve?

It catches over-limit conduit bend runs and tight sweeps before the duct bank is buried.

Does it approve a cable pull?

No. It records field values and shows deterministic checks. The engineer owns the approved pull plan, and local code adoption varies.

Does it collect location?

No. v1 stores runs, photos, settings, and exports locally on the device.

What does Pro add?

Pro adds unlimited runs, PDF/JPEG/ZIP/JSON export, clone, custom cable profiles, and shop default policy values.