Anvilfield

Switchgear Receive QA

Build the receiving packet before the truck leaves.

Capture carrier facts, delivery receipt notes, shipping split indicators, section damage, shortages, storage conditions, and claim-window reminders in one offline Android app.

Google Play may show this app after the maintainer publishes the listing.

Google Play and the Google Play logo are trademarks of Google LLC.

Switchgear Receive QA feature graphic

Built for the dock moment

Photo-backed damage Tie each damage photo to a section and defect.
Pre-unload evidence Photograph ShockWatch, TiltWatch, seals, and receipt notes before signing.
Carrier facts Track carrier, pro or bill-of-lading details, date, and receipt condition in one record.
Shortage log Reconcile shortages and wrong items against the packing list.
Storage flags Record outdoor staging, heaters off, desiccant, cover, and humidity readings.
Packet export Export a PDF, photo ZIP, CSV, and JSON packet from the dock.

Field documentation aid

Switchgear Receive QA is not a licensed or stamped engineering inspection. It does not clear or reject equipment for energization. It does not decide a warranty or freight claim. The governing deadlines are your contract, bill of lading, carrier tariff, and OEM instruction bulletin.

FAQ

What is the app for? It builds an offline switchgear receiving packet with photos, carrier facts, shortage logs, storage flags, and exports.
Does it file a freight claim? No. It organizes the evidence and reminders. The contract, bill of lading, tariff, and OEM bulletin govern.
Does it approve gear for energization? No. It is a documentation and pre-check aid, not a stamped inspection or energization clearance.